Permit GraphShortlistSan Francisco building permits since 2000

John Hamilton

License
C53284
Look the license up with the state
Listed as
engineer
On San Francisco permits
Jun 2025 to Sep 2026

9 permits since 2000 (engineer on 9 permits): 3 completed, 6 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 18, 2026In progress
filed Sep 2026, not yet issued
435 Urbano DrJ&J Dynamic Construction Inckitchen remodel. new drywall & lighting throughout entire home. remove e. load-bearing wall in kitchen. 4 bath's remodel. re-frame e. stairs between 1st & 2nd floor due to deterioration. new tankless w/h in crawl space. n. fau in crawl space & 2nd. n. fau in attic of roof. replace 13 e. windows &
Details
Permit
202608076242
Status
filed
Filed
Sep 18, 2026
Declared cost
$120,000
Address
435 Urbano Dr

kitchen remodel. new drywall & lighting throughout entire home. remove e. load-bearing wall in kitchen. 4 bath's remodel. re-frame e. stairs between 1st & 2nd floor due to deterioration. new tankless w/h in crawl space. n. fau in crawl space & 2nd. n. fau in attic of roof. replace 13 e. windows &

Open the permit page

$120,000
Jul 24, 2026In progress
issued Jul 2026
532 Franconia StRescue Construction Company Dba Alpha1burevision 202605221776 (ref 202607094751) move kitchen to other wall and ad laundry room to master closet.
Details
Permit
202607245496
Status
issued
Filed
Jul 24, 2026
Permit issued
Jul 24, 2026
Declared cost
$12,000
Address
532 Franconia St

revision 202605221776 (ref 202607094751) move kitchen to other wall and ad laundry room to master closet.

Open the permit page

$12,000
Jul 9, 2026In progress
issued Jul 2026
126 Aptos AvJ&J Dynamic Construction Inckitchen remodel with (n) pantry,2 bath remodel.(n)3rd bath on 3rd fl &(n)4th bath on 1st floor,2(n)bedrooms on 1st floor.(n)tankless w/h.(n)packaged heat pump unit w/ 8 blowers.replace 34(e)windows like for like.replace 1dbl-french doors & 2 single french doors.(n)125a-sub panel
Details
Permit
202607094784
Status
issued
Filed
Jul 9, 2026
Permit issued
Jul 17, 2026
Declared cost
$45,000
Address
126 Aptos Av

kitchen remodel with (n) pantry,2 bath remodel.(n)3rd bath on 3rd fl &(n)4th bath on 1st floor,2(n)bedrooms on 1st floor.(n)tankless w/h.(n)packaged heat pump unit w/ 8 blowers.replace 34(e)windows like for like.replace 1dbl-french doors & 2 single french doors.(n)125a-sub panel

Open the permit page

$45,000
Jul 9, 2026In progress
issued Jul 2026
532 Franconia StRescue Construction Company Dba Alpha1buremoving wall and adding beams, posts and footings. revision to pa# 202605221776.
Details
Permit
202607094751
Status
issued
Filed
Jul 9, 2026
Permit issued
Jul 22, 2026
Declared cost
$25,000
Address
532 Franconia St

removing wall and adding beams, posts and footings. revision to pa# 202605221776.

Open the permit page

$25,000
Apr 29, 2026In progress
issued May 2026
36 Broderick StJ&J Dynamic Construction Increvision to permit 202602256491. adding new non structural walls that were not previously on the plans.
Details
Permit
202604290350
Status
issued
Filed
Apr 29, 2026
Permit issued
May 4, 2026
Declared cost
$15,000
Address
36 Broderick St

revision to permit 202602256491. adding new non structural walls that were not previously on the plans.

Open the permit page

$15,000
Feb 25, 2026In progress
issued Feb 2026
36 Broderick StJ&J Dynamic Construction Increlocate kitchen to (e) family room on 1st flr and remodel 3 baths. (n) 125a subpanel on 1st flr. replace 9 (e) windows, 1 (e) sliding glass door and entry door with side-lites, like for like on 1st flr. replace 8 (e) windows like for like on 2nd flr. replace (e) 1 fau in garage at ground flr.
Details
Permit
202602256491
Status
issued
Filed
Feb 25, 2026
Permit issued
Feb 25, 2026
Declared cost
$50,000
Address
36 Broderick St

relocate kitchen to (e) family room on 1st flr and remodel 3 baths. (n) 125a subpanel on 1st flr. replace 9 (e) windows, 1 (e) sliding glass door and entry door with side-lites, like for like on 1st flr. replace 8 (e) windows like for like on 2nd flr. replace (e) 1 fau in garage at ground flr.

Open the permit page

$50,000
Jan 6, 2026Completed
final sign-off Apr 2026
249 Gold Mine DrJ&J Dynamic Construction Incto comply to nov 202548879 demo existing kitchen and renovate new kitchen. demo 2 bathrooms and renovate new bathrooms. work and install new 125 amp subpanel. replacing 8 windows and 2 sliding glass doors like for like. den on 1st fl to be bedroom with new bath.front windows to be wood clad.
Details
Permit
202601063305
Status
complete
Filed
Jan 6, 2026
Permit issued
Jan 7, 2026
Final sign-off
Apr 6, 2026
Declared cost
$50,000
Address
249 Gold Mine Dr

to comply to nov 202548879 demo existing kitchen and renovate new kitchen. demo 2 bathrooms and renovate new bathrooms. work and install new 125 amp subpanel. replacing 8 windows and 2 sliding glass doors like for like. den on 1st fl to be bedroom with new bath.front windows to be wood clad.

Open the permit page

$50,000
Aug 19, 2025Completed
final sign-off Sep 2025
1970 35th AvJ&J Dynamic Construction Inckitchen remodel, bathroom remodel. remove (e) load bearing wall in kitchen and replace with a new wood beam, wood post at each end, and new pad foundations.
Details
Permit
202508193393
Status
complete
Filed
Aug 19, 2025
Permit issued
Aug 19, 2025
Final sign-off
Sep 16, 2025
Declared cost
$55,000
Address
1970 35th Av

kitchen remodel, bathroom remodel. remove (e) load bearing wall in kitchen and replace with a new wood beam, wood post at each end, and new pad foundations.

Open the permit page

$55,000
Jun 23, 2025Completed
final sign-off Aug 2025
3781 25th StJ&J Dynamic Construction Inckitchen and bath remodel with removal and replacement of all fixtures. add new master bathroom with (e) footprint, create new closet in bedroom and add new opening to hallway.
Details
Permit
202506239248
Status
complete
Filed
Jun 23, 2025
Permit issued
Jun 24, 2025
Final sign-off
Aug 26, 2025
Declared cost
$40,000
Address
3781 25th St

kitchen and bath remodel with removal and replacement of all fixtures. add new master bathroom with (e) footprint, create new closet in bedroom and add new opening to hallway.

Open the permit page

$40,000