John Ehlert
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Jr Structural Engineeirng, Inc
- Based in
- Pleasanton
- On San Francisco permits
- May 2013 to Aug 2026
52 permits since 2000 (engineer on 46 permits, architect on 5 permits, authorized agent-others on 1 permit, designer on 1 permit): 31 completed, 8 in progress, 7 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 261 Niagara Av | North South Construction Inc | fire damage repair/rebuild.remove/repair structural framing but maintain (e) foundation: repair work to interior and exterior finisehs, window and doors, roof, garage and electrical. minor work to rear of garage to convert into habitable space.Details
fire damage repair/rebuild.remove/repair structural framing but maintain (e) foundation: repair work to interior and exterior finisehs, window and doors, roof, garage and electrical. minor work to rear of garage to convert into habitable space. | $850,000 |
| Jul 2, 2026 | In progress issued Sep 2026 | 318 Winfield St | Structoris Inc. | fire and smoke damage repair. return home to original conditions. repair like for like damaged interior and exterior (rear) finishes. remove and replacement of damaged deck to match original layout.Details
fire and smoke damage repair. return home to original conditions. repair like for like damaged interior and exterior (rear) finishes. remove and replacement of damaged deck to match original layout. | $100,000 |
| Apr 24, 2026 | In progress issued Apr 2026 | 417 Hyde St | Blu Sky Restoration Contractors Llc | unit 1 & 3: repair to related to a fire that occured in unit #7 above.Details
unit 1 & 3: repair to related to a fire that occured in unit #7 above. | $25,000 |
| Apr 10, 2026 | In progress issued Jul 2026 | 1059 Leavenworth St | Ka - Bi Construction Inc. | units 18 and 19 4/fl- scope for fire damage repair to include interior finishes, roof, hallway and electrical work. all work will be like for like, as needed. no work is visible from street.Details
units 18 and 19 4/fl- scope for fire damage repair to include interior finishes, roof, hallway and electrical work. all work will be like for like, as needed. no work is visible from street. | $100,000 |
| Mar 26, 2026 | Completed final sign-off Jun 2026 | 845 Market St | Blu Sky Restoration Contractors Llc | work related to fire in exterior wall at sf centre and spread to interior hallway. all work will b e completed to return the space to orig conditions under the 2025 e building code repair provisions. repair all damaged interior and exterior finishes, no structural damage. no change of occupancy,use,Details
work related to fire in exterior wall at sf centre and spread to interior hallway. all work will b e completed to return the space to orig conditions under the 2025 e building code repair provisions. repair all damaged interior and exterior finishes, no structural damage. no change of occupancy,use, | $100,000 |
| Feb 5, 2026 | Completed final sign-off Oct 2026 | 50 Golden Gate Av | C C I Commercial Construction & Improv | emergency framing repairs to close roof to prevent additional damage to the apartments. complete repair plans will be submitted separatelyDetails
emergency framing repairs to close roof to prevent additional damage to the apartments. complete repair plans will be submitted separately | $50,000 |
| Jan 22, 2026 | Completed final sign-off May 2026 | 350 Turk St | Blu Sky Restoration Contractors Llc | fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for likeDetails
fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for like | $100,000 |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 1430 Sacramento St | Blu Sky Restoration Contractors Llc | minor first damage to unit 2, front family room and exterior repair work, replace vinyl window and replace damaged electrical wire and fixture to match original conditions.Details
minor first damage to unit 2, front family room and exterior repair work, replace vinyl window and replace damaged electrical wire and fixture to match original conditions. | $15,000 |
| Oct 24, 2025 | In progress issued Mar 2026 | 1101 Geneva Av | Calsystem Restoration Services Inc | fire damage with in-kind repairs. all work will be completed to return the house to original conditions, including removal and replacement of the damaged (roof faming, interior and exterior finishes, electrical wiring, windows and doors, kitchen and bath fixtures, insulation, fau and water heater).Details
fire damage with in-kind repairs. all work will be completed to return the house to original conditions, including removal and replacement of the damaged (roof faming, interior and exterior finishes, electrical wiring, windows and doors, kitchen and bath fixtures, insulation, fau and water heater). | $502,204 |
| Aug 21, 2025 | Completed final sign-off Sep 2025 | 2645 Ocean Av | Blu Sky Restoration Contractors Llc | remove and replace damaged aluminum window frame using like for like approach. (exterior work only for structural frame)Details
remove and replace damaged aluminum window frame using like for like approach. (exterior work only for structural frame) | $5,000 |
| May 8, 2025 | Completed final sign-off Aug 2026 | 935 York St | Nino Company | to convert this 3-story single family dwelling into two units. the 2/f and 3/f will be the main unit, unit #1. unit #2 at the ground floor will be converted to an adu, legalized under the state adu program.Details
to convert this 3-story single family dwelling into two units. the 2/f and 3/f will be the main unit, unit #1. unit #2 at the ground floor will be converted to an adu, legalized under the state adu program. | $133,320 |
| Apr 1, 2025 | In progress issued Sep 2025 | 359 Peninsula Av | Service Master Restoration Svcs/Sharjo | removal and replacement of all windows per inspection notice. related to permit 202403298887. other permits associated with this scope of work: 202406124268 and 202412025915 street facing windows will be wood or wood aluminum clad.Details
removal and replacement of all windows per inspection notice. related to permit 202403298887. other permits associated with this scope of work: 202406124268 and 202412025915 street facing windows will be wood or wood aluminum clad. | $25,000 |
| Nov 20, 2024 | Expired or cancelled cancelled Jan 2025 | 935 York St | Water Damage Rescue Inc | convert single family dwelling 1-unit into 2-units. ground floor unit will be legalized under the state adu process. 2/f & 3/f renovations due to fire damage will be under separate permit.Details
convert single family dwelling 1-unit into 2-units. ground floor unit will be legalized under the state adu process. 2/f & 3/f renovations due to fire damage will be under separate permit. | $400,000 |
| Nov 6, 2024 | Completed final sign-off May 2025 | 115 Lake Merced Hill St South St | Blu Sky Restoration Contractors Llc | to comply nov 202417701- fire damage repair to party wall in kitchen and bathroom area of unit 113, staircase area for unit 115. interior finishes, roof material , as needed and electrical work like for like as needed. fire damage interior work only, no exterior workDetails
to comply nov 202417701- fire damage repair to party wall in kitchen and bathroom area of unit 113, staircase area for unit 115. interior finishes, roof material , as needed and electrical work like for like as needed. fire damage interior work only, no exterior work | $50,000 |
| Nov 6, 2024 | Completed final sign-off Jul 2025 | 113 Lake Merced Hill So Bl | Blu Sky Restoration Contractors Llc | fire damage repair to 2nd floor stair case area, scope interior finishes, electrical like for like fire damage interior work only no exterior workDetails
fire damage repair to 2nd floor stair case area, scope interior finishes, electrical like for like fire damage interior work only no exterior work | $50,000 |
| Apr 4, 2024 | In progress issued Jul 2025 | 2969 Mission St | Service Master Restoration Svcs/Sharjo | fire damage repair: including removal & replacement of the following at the rear of the building: roof/ceiling framing, wall framing on 2/f & finishes. minor electrical work. ada upgrades to bathroom & break room & entrance.Details
fire damage repair: including removal & replacement of the following at the rear of the building: roof/ceiling framing, wall framing on 2/f & finishes. minor electrical work. ada upgrades to bathroom & break room & entrance. | $75,000 |
| Mar 29, 2024 | Completed final sign-off Jul 2026 | 359 Peninsula Av | Service Master Restoration Svcs/Sharjo | like for like replacement of fire damaged exterior finishes; interior finishes, appliances, electrical components and (2) windows; repair/replacement of fire damaged floor framing near garage-front. reroof of turret and repair of turret framing; (1) egress window upgraded to meet current code.Details
like for like replacement of fire damaged exterior finishes; interior finishes, appliances, electrical components and (2) windows; repair/replacement of fire damaged floor framing near garage-front. reroof of turret and repair of turret framing; (1) egress window upgraded to meet current code. | $150,000 |
| Mar 19, 2024 | In progress issued Jun 2025 | 935 York St | Nino Company | repair all fire damage like for like. remove and replace all drywall and insulation on 2nd and 3rd floors. repair kitchen in kind. repair roof due to fire damage and repair ceiling joists at 2nd and 3rd floor at rear. replace doors and windows. replace hvac & electrical wires.Details
repair all fire damage like for like. remove and replace all drywall and insulation on 2nd and 3rd floors. repair kitchen in kind. repair roof due to fire damage and repair ceiling joists at 2nd and 3rd floor at rear. replace doors and windows. replace hvac & electrical wires. | $300,000 |
| Mar 14, 2024 | Completed final sign-off Mar 2026 | 1030 Post St | Blu Sky Restoration Contractors Llc | 5th fl & 4th fl fire and water damage repair in-kind. remodel 19 units on 4th fl & 5th fl to include new intrior finishes and fixtures, appliances and other water/smoke damaged areas like for like as needed. obtain seperate mep permits. repair to roof. replace steel frames in-kind on 5th floor.Details
5th fl & 4th fl fire and water damage repair in-kind. remodel 19 units on 4th fl & 5th fl to include new intrior finishes and fixtures, appliances and other water/smoke damaged areas like for like as needed. obtain seperate mep permits. repair to roof. replace steel frames in-kind on 5th floor. | $800,000 |
| Oct 23, 2023 | Completed final sign-off Mar 2025 | 823 Ingerson Av | Blu Sky Restoration Contractors Llc, Bayview Construction Engineers, Advanced Restoration Inc | to comply with nov# 202306053 fire damage: replace everything in kind removal and replacement of all drywall, windows and doors, plumbing and electrical. repair to roof framing and damaged deck railings. full reroof of roofing materials. exterior wood siding at east elevation to be replaced.Details
to comply with nov# 202306053 fire damage: replace everything in kind removal and replacement of all drywall, windows and doors, plumbing and electrical. repair to roof framing and damaged deck railings. full reroof of roofing materials. exterior wood siding at east elevation to be replaced. | $450,000 |
| Aug 23, 2023 | Completed final sign-off Apr 2025 | 1308 Hayes St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov# 202302294. fire damage repair in basement, unit 1312, 1310, & 1308. all repair works are like for like to match original conditions remove & replace entire roof materials. complete electrical rewire. repair all damaged interior & exterior finishes to match original conditions.Details
to comply with nov# 202302294. fire damage repair in basement, unit 1312, 1310, & 1308. all repair works are like for like to match original conditions remove & replace entire roof materials. complete electrical rewire. repair all damaged interior & exterior finishes to match original conditions. | $2,000,000 |
| Oct 21, 2022 | Expired or cancelled withdrawn Dec 2023 | 2315 17th Av | North Point Construction And Restoration | construct adu on ground flr of (e) 2-story sfh. adu to be situated whithin (e) bldg envelope on groud flr. entire ground flr should be sprinlered w/ auto system per nfpa 13d. work related to fire damaged of main residence under separate pa#202109208713.Details
construct adu on ground flr of (e) 2-story sfh. adu to be situated whithin (e) bldg envelope on groud flr. entire ground flr should be sprinlered w/ auto system per nfpa 13d. work related to fire damaged of main residence under separate pa#202109208713. | $80,000 |
| Oct 7, 2022 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov# 202290970. repair fire damage throughout building, like-for-like. full guy of units 2-6, partial gut to unit 1. repair front decks to units 4 & 6, including structural repaids to deck floor and roof framing. repair roof to match original.Details
to comply with nov# 202290970. repair fire damage throughout building, like-for-like. full guy of units 2-6, partial gut to unit 1. repair front decks to units 4 & 6, including structural repaids to deck floor and roof framing. repair roof to match original. | $1,100,000 |
| Aug 4, 2022 | Completed final sign-off May 2023 | 1150 Webster St | Jon K Takata Corp Dba Restoration Mgmt | unit 1212 only (buchanan st mall):fire damange repair: all work to be like for like to match original conditions.repair all roof furring damaged by sffd including roof materials and roof plywood.repair all damaged interior and exterior finshes to match original conditions.to comply w/ nov202287985.Details
unit 1212 only (buchanan st mall):fire damange repair: all work to be like for like to match original conditions.repair all roof furring damaged by sffd including roof materials and roof plywood.repair all damaged interior and exterior finshes to match original conditions.to comply w/ nov202287985. | $160,000 |
| Apr 7, 2022 | Completed final sign-off Jul 2024 | 456 Castro St | Jon K Takata Corp Dba Restoration Mgmt | revision to permit 202006128561. to comply with nov 202036301. 2nd and 3rd flr units: changing layouts to bathroom, laundry and kitchen areas. adding a door to 3/f family room to match (e) conditions. upgrading exterior stairs to comply with code. installing new foundation below ext. stairs.Details
revision to permit 202006128561. to comply with nov 202036301. 2nd and 3rd flr units: changing layouts to bathroom, laundry and kitchen areas. adding a door to 3/f family room to match (e) conditions. upgrading exterior stairs to comply with code. installing new foundation below ext. stairs. | $120,000 |
| Mar 17, 2022 | Completed final sign-off Aug 2024 | 200 Ellsworth St | B M S Cat Llc | revision to 202107083954. add a revised plans to dwgs: repair structural framing, roof, new electrical, install dry wall, and remove window that is invisible from st.Details
revision to 202107083954. add a revised plans to dwgs: repair structural framing, roof, new electrical, install dry wall, and remove window that is invisible from st. | |
| Jul 28, 2021 | Expired or cancelled withdrawn May 2024 | 1466 Waller St | Sharjo Inc. Dba Service Master Restorati | to comply w/nov #202055481: repair damage caused at rear of the 3rd fl. unit, 1470-b by fire, and caused damage to the unit below, 1468-b, roof and ceiling and wall framing will be replaced where damaged, all electrical damage will be eplaced as well as damaged windows, doors, appliances & finishesDetails
to comply w/nov #202055481: repair damage caused at rear of the 3rd fl. unit, 1470-b by fire, and caused damage to the unit below, 1468-b, roof and ceiling and wall framing will be replaced where damaged, all electrical damage will be eplaced as well as damaged windows, doors, appliances & finishes | $800,000 |
| Jun 8, 2021 | Expired or cancelled expired Oct 2024 | 2461 21st Av | Bms Cat | rear shed - tree impact shed to be repair, like to like.Details
rear shed - tree impact shed to be repair, like to like. | $10,000 |
| Feb 10, 2021 | Completed final sign-off Oct 2021 | 2906 21st St | Bms Cat | repair vehicle impact damage to front right corner to return to original conditions or better. no change to original apperance to original is proposed. comply w/ nov 202064381.Details
repair vehicle impact damage to front right corner to return to original conditions or better. no change to original apperance to original is proposed. comply w/ nov 202064381. | $15,000 |
| Dec 2, 2020 | Expired or cancelled expired Nov 2024 | 1615 Gough St | Cleanair Image Inc Dba Servpro Of Belmon | #6: repair all damages of this multi family bldg caused by the fire damage that occured. repair of interior finishes, roof finishes, roof framing, etc. to return home to existing occupancy.Details
#6: repair all damages of this multi family bldg caused by the fire damage that occured. repair of interior finishes, roof finishes, roof framing, etc. to return home to existing occupancy. | $35,000 |
| Feb 20, 2020 | Completed final sign-off Aug 2021 | 1090 Quintara St | John Paul O'brien Construction | rev to pa# 201902011890; relocate approved drinking fountain to new location at bottom of staircase in hallway.Details
rev to pa# 201902011890; relocate approved drinking fountain to new location at bottom of staircase in hallway. | $2,000 |
| Feb 10, 2020 | Never finaled filed Feb 2020, never issued | 3001 Castro St | North Point Construction And Restoration | to comply with nov 202010611; repair of wall to garage damaged by a vehicle impact, to return to original condition remove and replace damaged garage door and gas meterDetails
to comply with nov 202010611; repair of wall to garage damaged by a vehicle impact, to return to original condition remove and replace damaged garage door and gas meter | $15,000 |
| Feb 1, 2019 | Completed final sign-off Aug 2021 | 1090 Quintara St | John Paul O'brien Construction, Bms Cat | fire damaged inside 2 classrooms at church. all extg fire damaged sheetrock fixtures, appliances, electrical wiring and other interior finishes to be removed and replaced to match original conditions. one extg bathroom to be upgraded to be ada compliant.Details
fire damaged inside 2 classrooms at church. all extg fire damaged sheetrock fixtures, appliances, electrical wiring and other interior finishes to be removed and replaced to match original conditions. one extg bathroom to be upgraded to be ada compliant. | $95,000 |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 101 29th St | American Technologies Inc | repair vehicle damaged sheetrock, finishes & replace garage door to match (e), remove/replace damaged wall framing, in-kind, mudsill as necessaryDetails
repair vehicle damaged sheetrock, finishes & replace garage door to match (e), remove/replace damaged wall framing, in-kind, mudsill as necessary | $10,000 |
| Jun 7, 2018 | Completed final sign-off Dec 2019 | 511 Irving St | Britannia Construction, Inc. | comply w/ nov 200447267. repair framing, electrical, drywall. repair minor electrical & plumbing as per nov. remove ice cream, counter approx. 10 lf in lenght. remove fix seating. remove floor covering. n/a for maher.Details
comply w/ nov 200447267. repair framing, electrical, drywall. repair minor electrical & plumbing as per nov. remove ice cream, counter approx. 10 lf in lenght. remove fix seating. remove floor covering. n/a for maher. | $15,000 |
| Oct 11, 2017 | Expired or cancelled expired May 2021 | 53 Woodward St | Chad Smith Construction | fire damage repair to ground floor (garage) include electrical & plumbing & limited dry rot repairs like for like to match original. garage door shall be replaced to match original. all windows @ this level will be removed & replace to match orig. new ele panels & electrical meters will be provided.Details
fire damage repair to ground floor (garage) include electrical & plumbing & limited dry rot repairs like for like to match original. garage door shall be replaced to match original. all windows @ this level will be removed & replace to match orig. new ele panels & electrical meters will be provided. | $29,000 |
| Sep 29, 2016 | Completed final sign-off Jan 2020 | 1966 35th Av | American Technologies Inc | fire damage occurred @ the rear of 2 story residence. the fire was countered w/n the residence, no apparent damage to adj units. all repairs shall be using a like-for-like approach. remove g/f kitchen;remodel upper floor (e) kitchen with 4 ft. opening. to comply w/viol#201619851Details
fire damage occurred @ the rear of 2 story residence. the fire was countered w/n the residence, no apparent damage to adj units. all repairs shall be using a like-for-like approach. remove g/f kitchen;remodel upper floor (e) kitchen with 4 ft. opening. to comply w/viol#201619851 | $115,000 |
| Jun 15, 2016 | Never finaled issued Apr 2017, no final | 235 Seneca Av | P D Rest. Of East Bay Inc/Dba Paul Davis | comply with nov# 201580131 and fire damage repair, kitchen cabinet, duct work, rewiring whole house, electrical, plaster, dry wall, skylight, windows, complete bath room, exterior stucco required, framing, roof repair. legalize a illegal unit on ground floor.Details
comply with nov# 201580131 and fire damage repair, kitchen cabinet, duct work, rewiring whole house, electrical, plaster, dry wall, skylight, windows, complete bath room, exterior stucco required, framing, roof repair. legalize a illegal unit on ground floor. | $211,000 |
| Nov 18, 2015 | Never finaled issued Nov 2015, no final | 1309 03rd Av | Mark Scott Construction Inc | comply with nov 201553841, remove and replace brick from car impact like in kind; install new waterproof membrane; remove and replace terrazo steps; remove and replace structural if needed, no elelctrical, no hvac, no plumbingDetails
comply with nov 201553841, remove and replace brick from car impact like in kind; install new waterproof membrane; remove and replace terrazo steps; remove and replace structural if needed, no elelctrical, no hvac, no plumbing | $85,000 |
| Sep 11, 2015 | Completed final sign-off Dec 2015 | 403 Marietta Dr | American Technologies Inc | remove stucco at 1/f deck area and replace dryrot and hung off ledger at deck.Details
remove stucco at 1/f deck area and replace dryrot and hung off ledger at deck. | $11,900 |
| Jul 6, 2015 | Completed final sign-off May 2017 | 247 Mississippi St | Mark Scott Construction Inc | all work being repaired as per plans for fire repair that are being submitted to dbi.Details
all work being repaired as per plans for fire repair that are being submitted to dbi. | $300,000 |
| May 7, 2015 | Completed final sign-off Jun 2016 | 545 Darien Wy | Michael E Gutierrez | remodel kitchen and adjacent dining area, remove wall to dining, add wall & french doors at dinnette, replace wood window sashes with double insulated new, replace rear window picture with double casement. windows not visable from street.Details
remodel kitchen and adjacent dining area, remove wall to dining, add wall & french doors at dinnette, replace wood window sashes with double insulated new, replace rear window picture with double casement. windows not visable from street. | $40,000 |
| Jan 8, 2015 | Never finaled issued May 2015, no final | 1275 15th Av | Chad Smith Construction | all work described in the plans is related to the fire that occurred in the dwelling. all repair work will be like for like except where updates are needed. most work is contains to the front facade. windows & door replacement. windows shall be aluminum clad ext./ wood interiorDetails
all work described in the plans is related to the fire that occurred in the dwelling. all repair work will be like for like except where updates are needed. most work is contains to the front facade. windows & door replacement. windows shall be aluminum clad ext./ wood interior | $65,900 |
| Jun 27, 2014 | Completed final sign-off Jul 2017 | 2670 15th Av | remove & replace (e) foundation. convert rear of unconditioned garage to conditioned living space.Details
remove & replace (e) foundation. convert rear of unconditioned garage to conditioned living space. | $100,000 | |
| Jun 24, 2014 | Completed final sign-off Dec 2015 | 2671 15th Av | Gordon Walker Builders | demo existing garage slab, drill helical piers, retrofit, existing perimeter foundation, pour new 5" concrete lower floor slab, comply with violation 201389721Details
demo existing garage slab, drill helical piers, retrofit, existing perimeter foundation, pour new 5" concrete lower floor slab, comply with violation 201389721 | $150,000 |
| Jun 23, 2014 | Completed final sign-off Oct 2014 | 44 Seal Rock Dr | Cenco | rev. to pa# 201402108197 additional framing required to support 3rd floor exterior wall.Details
rev. to pa# 201402108197 additional framing required to support 3rd floor exterior wall. | $2,000 |
| May 9, 2014 | Never finaled issued Aug 2014, no final | 754 40th Av | American Technologies Inc | repair fire damage, remodel interior incuding rewire, replumbing new hvac, new roof material.Details
repair fire damage, remodel interior incuding rewire, replumbing new hvac, new roof material. | $200,000 |
| Mar 28, 2014 | Never finaled issued Jul 2015, no final | 515 Folsom St | Field Construction Inc. | restoration of building corner that was removed in the 1950's. work includes replacing of building corner, new elevator, minor stair adjustment, add gate to (e) parking area, and replacement of second story windows.Details
restoration of building corner that was removed in the 1950's. work includes replacing of building corner, new elevator, minor stair adjustment, add gate to (e) parking area, and replacement of second story windows. | $600,000 |
| Mar 25, 2014 | Completed final sign-off Feb 2017 | 2683 15th Av | Mark Scott Construction Inc | ground floor will be updated to make better use of the spac e& add more conditioned space. all new plumbing, electrical & mehcanical & framing to include all interior & exterior finishes. new roof. all work as per plans.Details
ground floor will be updated to make better use of the spac e& add more conditioned space. all new plumbing, electrical & mehcanical & framing to include all interior & exterior finishes. new roof. all work as per plans. | $500,000 |
| Nov 18, 2013 | Never finaled issued Nov 2013, no final | 5008 Diamond Heights Bl | P D Rest. Of East Bay Inc/Dba Paul Davis | install two electric wall heaters in lieu of damaged radiant heat system in the ceiling. no gas is available in the unit.Details
install two electric wall heaters in lieu of damaged radiant heat system in the ceiling. no gas is available in the unit. | $8,000 |
| Jun 25, 2013 | Completed final sign-off Oct 2013 | 279 San Marcos Av | P D Rest. Of East Bay Inc/Dba Paul Davis | deck repair at top level at rearDetails
deck repair at top level at rear | $21,000 |
| May 16, 2013 | Completed final sign-off Nov 2013 | 53 Ord Ct | Nuco Dba Premier Construction Services | remove extg retaining wall and replace with new as per plans. connect drain system to city sewer line.Details
remove extg retaining wall and replace with new as per plans. connect drain system to city sewer line. | $30,000 |