John Duffy
- Listed as
- architect
- Firm
- John Duffy Architect
- Based in
- Mariposa
- On San Francisco permits
- Jan 2005 to Nov 2017
13 permits since 2000 (architect on 13 permits): 8 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 3, 2017 | Never finaled issued Dec 2022, no final | 42 Ord Ct | Modern Art Construction | remodel & expand the (e) single family home, and legalization of uduDetails
remodel & expand the (e) single family home, and legalization of udu | $570,000 |
| Mar 31, 2017 | Never finaled issued May 2017, no final | 583 Haight St | Avalon Construction Co | to comply with nov 201473342 & 201528531: revto 201703010410 & install nw gyp at all interior face of all walls w/r13 insul. patch ceiling with n/gyp at (e) soffit - flush. install new gyp(water resistant) at restrm walls. new toto aquia toilet. nw toto lt307 lav. reno chim. change 2 light fixturesDetails
to comply with nov 201473342 & 201528531: revto 201703010410 & install nw gyp at all interior face of all walls w/r13 insul. patch ceiling with n/gyp at (e) soffit - flush. install new gyp(water resistant) at restrm walls. new toto aquia toilet. nw toto lt307 lav. reno chim. change 2 light fixtures | $3,700 |
| May 19, 2015 | Expired or cancelled expired May 2022 | 1948 Pacific Av | Modern Art Construction | add (n) basement level, add (n) garage @ 1st fl. horizontal addition & rear decks in rear yard. reconfigure misc interior partitions & layout. add (n) 4th fl covered deck space from (e) space. (n) misc plumb & elec work.Details
add (n) basement level, add (n) garage @ 1st fl. horizontal addition & rear decks in rear yard. reconfigure misc interior partitions & layout. add (n) 4th fl covered deck space from (e) space. (n) misc plumb & elec work. | $575,000 |
| Oct 17, 2014 | Expired or cancelled expired May 2022 | 1948 Pacific Av | Modern Art Construction | revision to pa#201409176562, partial foundation replacement, installation of new crawl space, foundation and slab on grade. new stair to crawl space.Details
revision to pa#201409176562, partial foundation replacement, installation of new crawl space, foundation and slab on grade. new stair to crawl space. | $80,000 |
| Dec 11, 2013 | Completed final sign-off May 2018 | 151 Liberty St | Modern Art Construction | excavate bsmt to provide/relocate unit 151, add new garage. provide new horizontal & vertical addition @ 1st & 2nd floors. new vertical addition & 3rd floor. complete structural upgrade throughout. add new kitchen & bathrooms. ** maher: ordinance no# 155-13 required; route to health **Details
excavate bsmt to provide/relocate unit 151, add new garage. provide new horizontal & vertical addition @ 1st & 2nd floors. new vertical addition & 3rd floor. complete structural upgrade throughout. add new kitchen & bathrooms. ** maher: ordinance no# 155-13 required; route to health ** | $825,000 |
| Aug 20, 2012 | Expired or cancelled withdrawn Oct 2014 | 2159 Bay St | construct new 4 th flr roof deck & stair penthouse enclosure.Details
construct new 4 th flr roof deck & stair penthouse enclosure. | $45,000 | |
| Jun 14, 2012 | Completed final sign-off Sep 2016 | 882 Carolina St | horizontal addition @ 3rd floor & vertical addition @ 4th floor, plus misc elec & plumbing work. remodel & repair existing building.Details
horizontal addition @ 3rd floor & vertical addition @ 4th floor, plus misc elec & plumbing work. remodel & repair existing building. | $500,000 | |
| Apr 27, 2012 | Completed final sign-off Sep 2012 | 3027 Anza St | Evans & Wallace | replace (e) rear foundation & repair/replace existing rear stair (in-kind).(approx 50%)Details
replace (e) rear foundation & repair/replace existing rear stair (in-kind).(approx 50%) | $7,500 |
| Jan 30, 2009 | Completed final sign-off Feb 2010 | 3870 21st St | Q Design Construction | expand 1/2 bath to full bath by installing tub. move door and closet. install ceiling can lighting. work on 3870 only, 2nd floorDetails
expand 1/2 bath to full bath by installing tub. move door and closet. install ceiling can lighting. work on 3870 only, 2nd floor | $15,000 |
| Oct 30, 2008 | Completed final sign-off Feb 2010 | 2122 Taraval St | install new lay-in acoustical tile ceiling in office space.Details
install new lay-in acoustical tile ceiling in office space. | $6,000 | |
| Nov 30, 2007 | Completed final sign-off Jul 2014 | 1870 Golden Gate Av | to erect 4 stories, 3 units apartments & garage.Details
to erect 4 stories, 3 units apartments & garage. | $650,000 | |
| Sep 24, 2007 | Completed final sign-off Aug 2008 | 245 Alhambra St | demo closets in bedroom on 2nd floor and convert to master bedroom, demo portion of back bath and closet to expand closet, replace all windows on the 2nd floor in kind. replace ex. fence in the rear yard with a new 8 foot wooden fence. replace gas range stove in kitchen. install hot tub in rear yardDetails
demo closets in bedroom on 2nd floor and convert to master bedroom, demo portion of back bath and closet to expand closet, replace all windows on the 2nd floor in kind. replace ex. fence in the rear yard with a new 8 foot wooden fence. replace gas range stove in kitchen. install hot tub in rear yard | $40,000 | |
| Jan 31, 2005 | Completed final sign-off Apr 2005 | 555 Taylor St | ada upgrade of entry door hardware as reqd by 20% rule for repair of ceiling on earlier permit refDetails
ada upgrade of entry door hardware as reqd by 20% rule for repair of ceiling on earlier permit ref | $9,000 |