John Cowee
- Listed as
- architect, authorized agent-others
- Firm
- Architectural Concepts
- On San Francisco permits
- Jul 2001 to Nov 2022
10 permits since 2000 (architect on 9 permits, authorized agent-others on 1 permit): 6 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 2, 2022 | Completed final sign-off Jan 2023 | 1754 Leavenworth St | 1)change operation of front basement window . 2) change door to former upper dwelling unit to fixed glass panel. revision to pa#202109208785. per dbi nov, add handrail at entry stair.Details
1)change operation of front basement window . 2) change door to former upper dwelling unit to fixed glass panel. revision to pa#202109208785. per dbi nov, add handrail at entry stair. | $1,500 | |
| Jul 11, 2022 | Never finaled issued Jul 2022, no final | 489 Harrison St | E S Construction | unit 403: reframe/move nonstructural hallway closet walls/laundry, removate/retile in-kind main & guest bathrooms, replace (e) flourescent recessed lights w/led in-kind, new vanity cabinets/countertops, replace shower/vanity fixtures in-kind w/efficient low flow, drywall repairs as neededDetails
unit 403: reframe/move nonstructural hallway closet walls/laundry, removate/retile in-kind main & guest bathrooms, replace (e) flourescent recessed lights w/led in-kind, new vanity cabinets/countertops, replace shower/vanity fixtures in-kind w/efficient low flow, drywall repairs as needed | $25,000 |
| Sep 20, 2021 | Completed final sign-off Jan 2023 | 1754 Leavenworth St | to comply with dbi nov 202176391 and 202175096/ install (n) elec oven at basement level. replace (e) basement door with new gate, modify portion of exterior landing, replace (e) exterior basement window.Details
to comply with dbi nov 202176391 and 202175096/ install (n) elec oven at basement level. replace (e) basement door with new gate, modify portion of exterior landing, replace (e) exterior basement window. | $2,500 | |
| Sep 14, 2020 | Completed final sign-off Jun 2021 | 425 01st St | E S Construction | #5704: remove/reframe non-structural walls. replace tile in both bathrooms. replace existing florescent recess lights with led. install new cabinetry in kitchen & bathrooms. install new plumbing fixtures in bathroom & kitchen. install/replace appliances with new. minor drywall repair & paint.Details
#5704: remove/reframe non-structural walls. replace tile in both bathrooms. replace existing florescent recess lights with led. install new cabinetry in kitchen & bathrooms. install new plumbing fixtures in bathroom & kitchen. install/replace appliances with new. minor drywall repair & paint. | $50,000 |
| Feb 8, 2018 | Completed final sign-off Jul 2019 | 1756 Leavenworth St | E S Construction | repair and replace an existing stair case (rear of bldg). revision to pa 2017-0406-3322 & to comply with n.o.v 201722701Details
repair and replace an existing stair case (rear of bldg). revision to pa 2017-0406-3322 & to comply with n.o.v 201722701 | $13,000 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 425 01st St | E S Construction | remodel shower, re-frame walls to install nana wall doors. drywall and painting, relocate electrical wires. maher naDetails
remodel shower, re-frame walls to install nana wall doors. drywall and painting, relocate electrical wires. maher na | $5,000 |
| Sep 2, 2014 | Completed final sign-off Nov 2014 | 489 Harrison St | Mahogany Defined Gen Contractors Inc | unit 403: kitchen remodel on level 3 replacing appliances in kind and re use existing flue connection. enlarge master bedroom closet per plan. maher n/a. unit 403 is now elevator ground floor under the 90% that does not need to comply.Details
unit 403: kitchen remodel on level 3 replacing appliances in kind and re use existing flue connection. enlarge master bedroom closet per plan. maher n/a. unit 403 is now elevator ground floor under the 90% that does not need to comply. | $4,000 |
| Sep 2, 2014 | Never finaled issued Sep 2014, no final | 489 Harrison St | Mahogany Defined Gen Contractors Inc | remodel powder room to add shower to a full bathroom & add pocket door in den area on level 2 per plan. change bathtub to shower & new location of electric w/d in master bath, change shower to bathtub in bath #1 on level 1 per plan. electrical per plan. maher n/a.Details
remodel powder room to add shower to a full bathroom & add pocket door in den area on level 2 per plan. change bathtub to shower & new location of electric w/d in master bath, change shower to bathtub in bath #1 on level 1 per plan. electrical per plan. maher n/a. | $2,000 |
| Apr 12, 2013 | Completed final sign-off Apr 2014 | 1785 Fulton St | Barker-O'donoghue Master Bldrs | new restaurant - replace & repair plumbing, electrical & gas lines, replace & repair floors, misc structural upgrades,install & secure brewing equipment & walk in refrigerator, sheetrock & paint walls.Details
new restaurant - replace & repair plumbing, electrical & gas lines, replace & repair floors, misc structural upgrades,install & secure brewing equipment & walk in refrigerator, sheetrock & paint walls. | $450,000 |
| Jul 30, 2001 | Expired or cancelled withdrawn Sep 2001 | 2157 Lombard St | oti-1 (revision) el onlyDetails
oti-1 (revision) el only | $15,000 |