Jeremy Andreasen
- Listed as
- engineer
- Firm
- Harris & Sloan
- Based in
- Sacramento
- On San Francisco permits
- Oct 2019 to Sep 2026
4 permits since 2000 (engineer on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 3101 Mission St | Jon K Takata Corp Dba Restoration Mgmt | ground fl: repair damaged wall framing, interior & exterior finishes like for like. damage in office labeled "room 10".Details
ground fl: repair damaged wall framing, interior & exterior finishes like for like. damage in office labeled "room 10". | $45,000 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 445 Hugo St | Jon K Takata Corp Dba Restoration Mgmt | unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace damaged roof framing (rafters, clg joists, kickers) as notedDetails
unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace damaged roof framing (rafters, clg joists, kickers) as noted | $400,000 |
| Apr 22, 2024 | In progress issued Jun 2024 | 3469 18th St | Jon K Takata Corp Dba Restoration Mgmt | repair to fire damamged area of 2-story mixed use bulidng as follows: repair damaged interior gypsum and exterior wood siding finishes. repair damaged roof framinmg (rafter and sheating) and waterproofing. repair floor framing (joists and sheating in kind). mep trade work will need separte permits.Details
repair to fire damamged area of 2-story mixed use bulidng as follows: repair damaged interior gypsum and exterior wood siding finishes. repair damaged roof framinmg (rafter and sheating) and waterproofing. repair floor framing (joists and sheating in kind). mep trade work will need separte permits. | $175,000 |
| Oct 18, 2019 | Completed final sign-off Jul 2023 | 301 Yale St | Tri Pointe Homes Inc | installation of cmu block retaining walls for the 495 cambridge site pemmeter & in tract project.Details
installation of cmu block retaining walls for the 495 cambridge site pemmeter & in tract project. |