Jeff Tunison
- Listed as
- architect, engineer
- Firm
- Silicon Valley
- Based in
- Livermore
- On San Francisco permits
- Jan 2023 to May 2026
13 permits since 2000 (engineer on 12 permits, architect on 1 permit): 8 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | Completed final sign-off Jul 2026 | 3620 Market St | Advance Construction Technology Inc | unit 3- replace ledger and dry rot replacment apprx 10sf of stucco and paint. all new materials less than 50% in kind not visble from street.Details
unit 3- replace ledger and dry rot replacment apprx 10sf of stucco and paint. all new materials less than 50% in kind not visble from street. | $15,000 |
| May 22, 2026 | Completed final sign-off Jul 2026 | 1310 Scott St | Underpinning Specialist Inc. | revision to pa# 202510237986. change two drilled piers to hand dug piers. no exterior work.Details
revision to pa# 202510237986. change two drilled piers to hand dug piers. no exterior work. | $10 |
| Nov 13, 2025 | In progress issued Nov 2025 | 1860 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $190,980 |
| Nov 13, 2025 | In progress issued Nov 2025 | 1310 Scott St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $185,790 |
| Nov 13, 2025 | Completed final sign-off Oct 2026 | 1830 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $109,902 |
| Nov 13, 2025 | Completed final sign-off Sep 2026 | 1804 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $110,438 |
| Nov 13, 2025 | Completed final sign-off Sep 2026 | 1810 Ellis St | Axis Construction | partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common areaDetails
partial repairs to ext bldg envelope, as-needed basis, replace (e) wood siding w? james hardie cementitious siding to resemble (e) & other voluntary repairs. rr windows within (e) framed openings, rr & repair (e) trellis, bldg materials will be replaced inkind. repaint bldg to (e) color. common area | $75,553 |
| May 19, 2025 | Completed final sign-off Nov 2025 | 1685 19th Av | Axis Construction | existing drain line repairs: r/r approx 3' x 5' portion of (e) interior concrete slab; repair approx .5 l.f portion of (e) sewer drain line below (e) slab. replacement work is like for like. not visible from street. work is hoa includeds associated interior repairsDetails
existing drain line repairs: r/r approx 3' x 5' portion of (e) interior concrete slab; repair approx .5 l.f portion of (e) sewer drain line below (e) slab. replacement work is like for like. not visible from street. work is hoa includeds associated interior repairs | $8,000 |
| Jun 28, 2023 | Completed final sign-off Jan 2024 | 238 Bemis St | Saarman Construction,Ltd. | install shoring and sister the 2x10 beam to structurally account for the removed post, structural calculations provided w/the plansDetails
install shoring and sister the 2x10 beam to structurally account for the removed post, structural calculations provided w/the plans | $5,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 1804 Ellis St | Axis Construction | work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope.Details
work to the (e) stairway to remove and replace damaged/dry rot structure framing members per engineers plans. work is all like-for-like with no change in size or appearance and envelope. | $59,715 |
| May 11, 2023 | Never finaled issued May 2023, no final | 519 Ellis St | Universe Alliance Inc Dba Universe Cons | framing and drywall repair after fire damage. in kond. no change. revert to last legal condition. remodel unit# 706 & # 707.Details
framing and drywall repair after fire damage. in kond. no change. revert to last legal condition. remodel unit# 706 & # 707. | $30,000 |
| Mar 16, 2023 | Expired or cancelled cancelled Jan 2026 | 650 02nd St | Universe Alliance Inc Dba Universe Cons | prepare & install plates on side of column and beam for structural repair per engineering plans for supportDetails
prepare & install plates on side of column and beam for structural repair per engineering plans for support | $10,000 |
| Jan 9, 2023 | Expired or cancelled withdrawn May 2024 | 478 04th Av | Picone Renovations | strengthening upgrade reconstruction of an attached 3-story laundry room.Details
strengthening upgrade reconstruction of an attached 3-story laundry room. | $20,000 |