Javier Chavarria
- Listed as
- architect, engineer
- Firm
- Jc Engineering
- Based in
- Pacifica
- On San Francisco permits
- Jun 2006 to Jun 2026
17 permits since 2000 (engineer on 12 permits, architect on 5 permits): 7 completed, 7 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2026 | Completed final sign-off Aug 2026 | 462 Arch St | add a small deck at rear of building and (n) door opening.Details
add a small deck at rear of building and (n) door opening. | $10,000 | |
| May 27, 2026 | In progress issued May 2026 | 3630 Market St | Jce Building & Development Inc. | replace garage door. add cosmetic wood to (e) columns and soffit. reference complaint no 202655973. ref 202602206289Details
replace garage door. add cosmetic wood to (e) columns and soffit. reference complaint no 202655973. ref 202602206289 | $2,800 |
| May 26, 2026 | In progress filed May 2026, not yet issued | 331 Shields St | partial demolition of the existing front facade to correct property line encroachment and align with mandatory city setbacks. interior renovation and remodel upgrades to existing single-family residence.Details
partial demolition of the existing front facade to correct property line encroachment and align with mandatory city setbacks. interior renovation and remodel upgrades to existing single-family residence. | $215,000 | |
| Mar 31, 2026 | In progress filed Mar 2026, not yet issued | 537 10th Av | Little Feet Renovation | add ev charger to main house.Details
add ev charger to main house. | $7,500 |
| Mar 31, 2026 | In progress filed Mar 2026, not yet issued | 537 10th Av | Little Feet Renovation | convert existing detached garage to adu at rear.Details
convert existing detached garage to adu at rear. | $175,000 |
| Dec 18, 2025 | Expired or cancelled withdrawn Aug 2026 | 1727 Newcomb Av | provide 2nd mean of egress for lower floor living area.Details
provide 2nd mean of egress for lower floor living area. | $6,000 | |
| Dec 8, 2025 | Completed final sign-off Jun 2026 | 110 Ashton Av | Peninsula Home Remodeling | revision pa# 202410233579 and ref orignal pa# 202206095995. replace garage slab w/ 4" of concrete w/ #4 at 18" o.c. w/ 6" base rock.Details
revision pa# 202410233579 and ref orignal pa# 202206095995. replace garage slab w/ 4" of concrete w/ #4 at 18" o.c. w/ 6" base rock. | $5,000 |
| Oct 15, 2024 | In progress filed Oct 2024, not yet issued | 580 Sutter St | modify (e) bathroom to create fully complaint unisex toilet roomDetails
modify (e) bathroom to create fully complaint unisex toilet room | $5,000 | |
| Dec 20, 2023 | In progress issued Feb 2024 | 2217 Revere Av | Daly City Iron Works | remove (e) decayed exterior stair & replace.Details
remove (e) decayed exterior stair & replace. | $15,000 |
| Oct 25, 2023 | In progress issued Feb 2024 | 1215 Holloway Av | Little Feet Renovation | partial removal of exterior stucco, investigation of dry rot damage, replace damage members in kind. install new stucco in kind. install temporary shoring system (interior) as needed.Details
partial removal of exterior stucco, investigation of dry rot damage, replace damage members in kind. install new stucco in kind. install temporary shoring system (interior) as needed. | $12,000 |
| Jan 18, 2023 | Completed final sign-off Dec 2023 | 431 Hoffman Av | Di Build Llc | revision to permit 202209303561 to show (e) and proposed plan, new ceiling framing and revise roofing plan.Details
revision to permit 202209303561 to show (e) and proposed plan, new ceiling framing and revise roofing plan. | |
| Sep 30, 2022 | Completed final sign-off Dec 2023 | 431 Hoffman Av | Di Build Llc | revision to permit 202202168156. modify interior layout, add rear stair.Details
revision to permit 202202168156. modify interior layout, add rear stair. | $5,000 |
| Nov 9, 2021 | Completed final sign-off Nov 2024 | 307 Castro St | Jce Building & Development Inc. | unit 2: relocation and renovation of kitchen. remodel (e) bathroom. add a new bathroom. remove wall between dining and bedroom to create larger living room.Details
unit 2: relocation and renovation of kitchen. remodel (e) bathroom. add a new bathroom. remove wall between dining and bedroom to create larger living room. | $54,000 |
| Nov 2, 2020 | Completed final sign-off Jul 2022 | 1350 Shotwell St | Blue Bay Painting Contractor | project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as isDetails
project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as is | $110,000 |
| Sep 22, 2020 | Never finaled issued Sep 2022, no final | 3324 Divisadero St | Jce Building & Development Inc. | lower floor seismic reinforcement, eliminate post and install new beam to allow for more parking. remodel rec room, bathroom and wet bar at ground floor, modify support of rear deck, remodel kitchen at third floor, install new electrical subpanel.Details
lower floor seismic reinforcement, eliminate post and install new beam to allow for more parking. remodel rec room, bathroom and wet bar at ground floor, modify support of rear deck, remodel kitchen at third floor, install new electrical subpanel. | $75,000 |
| Mar 13, 2018 | Expired or cancelled cancelled Jul 2024 | 5420 Mission St | change of use from "b" to a-3. impove bathrooms to make them accessible. install (new) furnace and vent. add egress corridor.Details
change of use from "b" to a-3. impove bathrooms to make them accessible. install (new) furnace and vent. add egress corridor. | $25,000 | |
| Jun 21, 2006 | Completed final sign-off Sep 2006 | 5061 Mission St | demolish exg timber bulkheads ret. wall at rear and replace with new concrete retaining walls approx. 70 lfDetails
demolish exg timber bulkheads ret. wall at rear and replace with new concrete retaining walls approx. 70 lf | $12,000 |