James Huston
- Listed as
- contractor, subcontractor
- Firm
- Huston General Contracting Inc.
- Based in
- Livermore
- On San Francisco permits
- Mar 2010 to Jul 2026
13 permits since 2000 (contractor on 13 permits, subcontractor on 1 permit): 5 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Aug 2026 | 45 Bernard St | Huston General Contracting Inc. | revision to bpa: 202008222415 gas appliances not allowed due to pgeservice conflict in street, adjust to no fireplace and electric appliances. (door change in basement). future adu under separate pa#202201075581.Details
revision to bpa: 202008222415 gas appliances not allowed due to pgeservice conflict in street, adjust to no fireplace and electric appliances. (door change in basement). future adu under separate pa#202201075581. | |
| Jun 6, 2025 | In progress issued Jun 2025 | 45 Bernard St | Huston General Contracting Inc. | shoring is for bldg permit 202008222415. scope is temporary shoring and underpinning to complete basement foundation work. work does not increase height, boundries etc. refer to 202008222415Details
shoring is for bldg permit 202008222415. scope is temporary shoring and underpinning to complete basement foundation work. work does not increase height, boundries etc. refer to 202008222415 | |
| May 21, 2024 | In progress issued Dec 2025 | 2055 Folsom St | Huston General Contracting Inc. | non-residentail electrical upgrades to an existing (utility bldg) wireles telecommunications service facility. removal of asphalt paing, minor soil removal at equipment pads, new conc equip pad, and electrical equipment. no additional floor area proposedDetails
non-residentail electrical upgrades to an existing (utility bldg) wireles telecommunications service facility. removal of asphalt paing, minor soil removal at equipment pads, new conc equip pad, and electrical equipment. no additional floor area proposed | $90,000 |
| Aug 22, 2020 | In progress issued Jan 2024 | 45 Bernard St | Huston General Contracting Inc. | upgrade 3-story, 4-unit apartment consisting of brick foundation, wood frame structure, combination siding, etc. project work consists of seismic/soft-story foundation upgrade (w/9 ft rear-yard addition) and includes bringing front bedroom windows to fire exit code size with finish to match existingDetails
upgrade 3-story, 4-unit apartment consisting of brick foundation, wood frame structure, combination siding, etc. project work consists of seismic/soft-story foundation upgrade (w/9 ft rear-yard addition) and includes bringing front bedroom windows to fire exit code size with finish to match existing | $389,642 |
| Jan 12, 2018 | Completed final sign-off Mar 2018 | 1900 Noriega St | Huston General Contracting Inc. | to comply with nov 201708691: remove (e) 2nd flr deck (580 sf) on north/east side and replace with new wood trellis.Details
to comply with nov 201708691: remove (e) 2nd flr deck (580 sf) on north/east side and replace with new wood trellis. | $20,000 |
| May 2, 2017 | Completed final sign-off Jul 2017 | 862 Clay St | Huston General Contracting Inc. | administrative permit. replace street number from 868 to 862 clay street under pa#2016-1115-2723. 862 was not in computer system at time of application.Details
administrative permit. replace street number from 868 to 862 clay street under pa#2016-1115-2723. 862 was not in computer system at time of application. | |
| Jan 11, 2017 | Expired or cancelled cancelled Jan 2026 | 1485 Bay Shore Bl | Huston General Contracting Inc. | adjust existing breakroom layout to incorporate adjacent storage & work rooms.Details
adjust existing breakroom layout to incorporate adjacent storage & work rooms. | $25,000 |
| Nov 15, 2016 | Never finaled issued Mar 2017, no final | 862 Clay St | Huston General Contracting Inc. | commercial t.i. replace extg restroom with accessible one. block off extg loft space. upgrade to lighting system.Details
commercial t.i. replace extg restroom with accessible one. block off extg loft space. upgrade to lighting system. | $45,000 |
| Apr 6, 2016 | Completed final sign-off Mar 2019 | 1900 Noriega St | Huston General Contracting Inc. | revision to pa 2015-1123-3394s/r-1 for structural plan reviewDetails
revision to pa 2015-1123-3394s/r-1 for structural plan review | |
| Feb 10, 2015 | Completed final sign-off Jul 2016 | 225 Clipper St | Bjlgc Inc, Huston General Contracting Inc. | revision to 201312305281. adding bar sink and add permit clarification that 2nd fl bath adjustments as shown in orig permit. relocate water heaterDetails
revision to 201312305281. adding bar sink and add permit clarification that 2nd fl bath adjustments as shown in orig permit. relocate water heater | $4,000 |
| Jul 8, 2014 | Expired or cancelled cancelled Sep 2020 | 667 Waller St | Huston General Contracting Inc. | approx 9x11 room for dry sauna & reconfigure existing back deck. also replace front windows with energy efficient type.Details
approx 9x11 room for dry sauna & reconfigure existing back deck. also replace front windows with energy efficient type. | $50,000 |
| Dec 30, 2013 | Completed final sign-off Jul 2016 | 225 Clipper St | Bjlgc Inc, Huston General Contracting Inc. | foundation & concrete slab replacement, rebuild interior stair (n) fenestration & horiztal/vertical addition @ rear of bldg. upgrade to electrical & plumbing adding 1 1/2 baths. addition of single car garage, driveway & curb cut.Details
foundation & concrete slab replacement, rebuild interior stair (n) fenestration & horiztal/vertical addition @ rear of bldg. upgrade to electrical & plumbing adding 1 1/2 baths. addition of single car garage, driveway & curb cut. | $200,000 |
| Mar 29, 2010 | Never finaled issued Apr 2010, no final | 2568 Post St | Huston General Contracting Inc. | structurally reinforce (e) structure. replace portions of (e) foundations & add bracing to interior & exterior walls.Details
structurally reinforce (e) structure. replace portions of (e) foundations & add bracing to interior & exterior walls. | $25,000 |