Jaime Rapadas
- Listed as
- architect
- Firm
- A / R Design Group
- Based in
- Burlingame
- On San Francisco permits
- Dec 2013 to Sep 2015
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2015 | Completed final sign-off Jul 2019 | 1966 29th Av | 2 (e) bedrooms in the upper level shall be remodeled with 325 sf added area. a new toilet / bath & laundry space plus a deck with stairs to the rear yard. 2 non-compliant rooms in the lower level & 2 bath room with a total 516 sf. shall be legalized with a 413 sf addition. (e) garage to be rated.Details
2 (e) bedrooms in the upper level shall be remodeled with 325 sf added area. a new toilet / bath & laundry space plus a deck with stairs to the rear yard. 2 non-compliant rooms in the lower level & 2 bath room with a total 516 sf. shall be legalized with a 413 sf addition. (e) garage to be rated. | $320,000 | |
| Dec 30, 2013 | Completed final sign-off Mar 2015 | 680 Post St | D N S Construction | (compliance with maher ordinance - extended - ordinance no.155-13 not required. excavation less than 50 cu. yd) expansion of (e) restaurant to add a (n) bar. removal of one column & resizing of the false beam. install (n) lighting & 1 (n) sink. all work @ ground floor.Details
(compliance with maher ordinance - extended - ordinance no.155-13 not required. excavation less than 50 cu. yd) expansion of (e) restaurant to add a (n) bar. removal of one column & resizing of the false beam. install (n) lighting & 1 (n) sink. all work @ ground floor. | $25,000 |