53 permits since 2000 (engineer on 48 permits, architect on 5 permits): 42 completed, 6 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 24, 2023 | Completed final sign-off Nov 2024 | 132 Cortland Av | Edri Construction Inc *See Notes* | revision to bpa#202210124235, add sheer walls, rear patio door changes from 10 feet to 12 feetDetails
revision to bpa#202210124235, add sheer walls, rear patio door changes from 10 feet to 12 feet | $2,500 |
| Jan 13, 2021 | Never finaled filed Jan 2021, never issued | 42 Stoneyford Av | two story horizontal addition to existing two story single family dwelling to include a new master bedroom, two bathrooms, new family room, remodel kitchen.Details
two story horizontal addition to existing two story single family dwelling to include a new master bedroom, two bathrooms, new family room, remodel kitchen. | $350,000 | |
| Mar 12, 2018 | Completed final sign-off Jun 2018 | 314 West Portal Av | Erick's Construction Inc | t.i. for interior alteration for restroom upgrades/exhaust fans and new partition walls.Details
t.i. for interior alteration for restroom upgrades/exhaust fans and new partition walls. | $50,000 |
| Sep 26, 2017 | Completed final sign-off Aug 2026 | 906 Vallejo St | Flores Construction, Di Vine Construction | roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairsDetails
roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairs | $75,000 |
| Jun 8, 2017 | Completed final sign-off Nov 2019 | 1857 24th Av | Acme Builders | replace exterior staircase at rear of property (like for like).Details
replace exterior staircase at rear of property (like for like). | $15,000 |
| Dec 16, 2016 | Expired or cancelled cancelled Jan 2019 | 765 Sutter St | provide 1 new accessory dwelling unit @ basement pursuant to ord #162-16. work only @ basement floor. ** maher: n/a **Details
provide 1 new accessory dwelling unit @ basement pursuant to ord #162-16. work only @ basement floor. ** maher: n/a ** | $40,000 | |
| Nov 1, 2016 | Never finaled issued Nov 2016, no final | 500 Hyde St | Mendez-Ortiz Contractors | non structural interior remodel apt 204, relocate kitchen. provide new officeDetails
non structural interior remodel apt 204, relocate kitchen. provide new office | $20,000 |
| Jul 22, 2016 | Never finaled issued Sep 2016, no final | 500 Hyde St | Mendez-Ortiz Contractors | #107 interior remodel - relocate kitchen, remodel (e) bathroom. provide new bedroom. maher naDetails
#107 interior remodel - relocate kitchen, remodel (e) bathroom. provide new bedroom. maher na | $30,000 |
| Feb 8, 2016 | Expired or cancelled cancelled Nov 2022 | 829 York St | to comply with nov 201322371. legalize (e) ground floor unit into a 3rd dwelling unit.Details
to comply with nov 201322371. legalize (e) ground floor unit into a 3rd dwelling unit. | $40,000 | |
| Feb 11, 2015 | Completed final sign-off May 2015 | 770 California St | M H M Construction | apt #608 interior remodel: relocate kitchen, remodel existing bathroom, provide new bedroom. n/a maher ordinanceDetails
apt #608 interior remodel: relocate kitchen, remodel existing bathroom, provide new bedroom. n/a maher ordinance | $30,000 |
| Feb 11, 2015 | Completed final sign-off Jun 2015 | 770 California St | M H M Construction | apt #202 interior remodel: relocate kitchen & bath, provide new bedroom. n/a maher ordinanceDetails
apt #202 interior remodel: relocate kitchen & bath, provide new bedroom. n/a maher ordinance | $30,000 |
| Jan 7, 2015 | Completed final sign-off Apr 2015 | 500 Leavenworth St | M H M Construction | #203 interior remodel - remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel (e) bath.Details
#203 interior remodel - remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel (e) bath. | $30,000 |
| Dec 22, 2014 | Completed final sign-off Mar 2016 | 500 Leavenworth St | M H M Construction | #102: interior remodel, remove non-load bearing walls to relocate kitchen, provide new bedroom, remodel (e) bath. n/a ordinance #155-13Details
#102: interior remodel, remove non-load bearing walls to relocate kitchen, provide new bedroom, remodel (e) bath. n/a ordinance #155-13 | $30,000 |
| Dec 22, 2014 | Completed final sign-off Mar 2015 | 760 Geary St | M H M Construction | #310: interior remodel, relocate kitchen, remodel existing bathroom, provide new bedroom. n/a ordinance #155-13Details
#310: interior remodel, relocate kitchen, remodel existing bathroom, provide new bedroom. n/a ordinance #155-13 | $30,000 |
| Sep 5, 2014 | Completed final sign-off Nov 2014 | 795 Geary St | M H M Construction | to comply with nov #201460171 dated 3/21/2014. interior remodel in unit #105. remodel kitchen and bathroom at upper level. new bedroom, family, office and bath at lower level. new stairs connecting lower to upper level. n/a for the maher ordinance #155-13Details
to comply with nov #201460171 dated 3/21/2014. interior remodel in unit #105. remodel kitchen and bathroom at upper level. new bedroom, family, office and bath at lower level. new stairs connecting lower to upper level. n/a for the maher ordinance #155-13 | $60,000 |
| Aug 21, 2014 | Expired or cancelled cancelled Jan 2026 | 574 08th Av | M H M Construction | replace (e) windows at front facade per plan.Details
replace (e) windows at front facade per plan. | $8,000 |
| Aug 20, 2014 | Completed final sign-off Jun 2015 | 500 Hyde St | M H M Construction | apt #302 interior remodel - remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath.Details
apt #302 interior remodel - remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. | $30,000 |
| Jul 30, 2014 | Completed final sign-off Aug 2015 | 1035 Pine St | M H M Construction | #404 interior remodel: remove non-load bearing walls to relocate kitchen & bth. provide new den, remodel (e) bedroom, no egress windows req'd for unit four stories above grade.Details
#404 interior remodel: remove non-load bearing walls to relocate kitchen & bth. provide new den, remodel (e) bedroom, no egress windows req'd for unit four stories above grade. | $40,000 |
| Jun 25, 2014 | Completed final sign-off Oct 2014 | 1035 Pine St | M H M Construction | unit #104: remove non-load bearing walls to relocate kitchen & bath. provide new bedrooms. remodel extg bedroom.Details
unit #104: remove non-load bearing walls to relocate kitchen & bath. provide new bedrooms. remodel extg bedroom. | $30,000 |
| Jun 25, 2014 | Completed final sign-off Oct 2014 | 500 Hyde St | M H M Construction | unit #505: interior remodel to remove non-load bearing walls to relocate kitchen and bath. provide new bedroom.Details
unit #505: interior remodel to remove non-load bearing walls to relocate kitchen and bath. provide new bedroom. | $25,000 |
| Jun 25, 2014 | Expired or cancelled expired Aug 2026 | 1035 Pine St | M H M Construction | unit #405: remove non-load bearing walls to relocate kitchen. remodel extg bath. provide new bedrooms. no egress windows req'd for unit four stories above grade per plan.Details
unit #405: remove non-load bearing walls to relocate kitchen. remodel extg bath. provide new bedrooms. no egress windows req'd for unit four stories above grade per plan. | $30,000 |
| Jun 11, 2014 | Completed final sign-off Jan 2015 | 500 Leavenworth St | M H M Construction | interior remodel apt 409. remove non load bearing walls to relocate kitchen. new bedroom. remodel e bath. compliance with ordinance no.155-13 not required.Details
interior remodel apt 409. remove non load bearing walls to relocate kitchen. new bedroom. remodel e bath. compliance with ordinance no.155-13 not required. | $30,000 |
| Jun 11, 2014 | Completed final sign-off Jun 2015 | 500 Hyde St | M H M Construction | apt #102 interior remodel: remove non-load bearing walls to relocate kitchen & bath. provide new bedroom.Details
apt #102 interior remodel: remove non-load bearing walls to relocate kitchen & bath. provide new bedroom. | $40,000 |
| May 29, 2014 | Completed final sign-off Sep 2014 | 254 Divisadero St | M H M Construction | #10- revision to pa#201405206202 revise framing directions to reflect site conditions, revise kitchen and bedroom layouts.Details
#10- revision to pa#201405206202 revise framing directions to reflect site conditions, revise kitchen and bedroom layouts. | |
| May 29, 2014 | Completed final sign-off Aug 2014 | 1200 17th Av | M H M Construction | #104- revision to no plans pa#201405085284 interior remodel apt. #104 to relocate (e) kitchen provide new office, remodel (e) bath, remodel (e) bedroom.Details
#104- revision to no plans pa#201405085284 interior remodel apt. #104 to relocate (e) kitchen provide new office, remodel (e) bath, remodel (e) bedroom. | $8,000 |
| Apr 9, 2014 | Completed final sign-off Jun 2014 | 2165 Larkin St | M H M Construction | on 4th floor- apt #402 - interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. compliance with ordinance #155-13 not requiredDetails
on 4th floor- apt #402 - interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. compliance with ordinance #155-13 not required | $20,000 |
| Apr 9, 2014 | Completed final sign-off Jun 2014 | 2165 Larkin St | M H M Construction | on 3rd floor - apt #302 - interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. compliance with ordinance #155-13 not requiredDetails
on 3rd floor - apt #302 - interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. compliance with ordinance #155-13 not required | $20,000 |
| Mar 19, 2014 | Completed final sign-off Dec 2014 | 600 Stanyan St | M H M Construction | expand and remodel #101: expand existing apt. into g/f (377 sq.ft.), provide (n) spiral stairsm relocate (e) kitchen and (e) living room to g/f, provide new bedroom on 2/f, add bath to g/f, sprinkler throughout unit per nfpa 13 under seperate permit.Details
expand and remodel #101: expand existing apt. into g/f (377 sq.ft.), provide (n) spiral stairsm relocate (e) kitchen and (e) living room to g/f, provide new bedroom on 2/f, add bath to g/f, sprinkler throughout unit per nfpa 13 under seperate permit. | $40,000 |
| Feb 19, 2014 | Completed final sign-off May 2014 | 2001 Pierce St | M H M Construction | #37: interior remodel, remove non load bearing walls. relocate kitchen. remodel e bath. provide new bedroom. comply with ab 093 attachment b table 4. compliance with ordinance #155-13 not required.Details
#37: interior remodel, remove non load bearing walls. relocate kitchen. remodel e bath. provide new bedroom. comply with ab 093 attachment b table 4. compliance with ordinance #155-13 not required. | $30,000 |
| Feb 12, 2014 | Completed final sign-off Jun 2015 | 500 Hyde St | M H M Construction | #201 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath, comply with ab093 attachment b, table 4.Details
#201 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath, comply with ab093 attachment b, table 4. | $35,000 |
| Feb 12, 2014 | Never finaled issued Feb 2014, no final | 500 Leavenworth St | M H M Construction | #303 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath, comply with ab093 attachment b, table 4.Details
#303 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath, comply with ab093 attachment b, table 4. | $20,000 |
| Nov 25, 2013 | Completed final sign-off Feb 2014 | 745 Hyde St | M H M Construction | unit #50 interior remodel - remove non-load bearing walls to relcoate ktichen, provide new living room, remodel (e) bath, electrical & plumbing work as necessary, replace lighting with high efficacy lighting.Details
unit #50 interior remodel - remove non-load bearing walls to relcoate ktichen, provide new living room, remodel (e) bath, electrical & plumbing work as necessary, replace lighting with high efficacy lighting. | $25,000 |
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 254 Divisadero St | M H M Construction | unit #6 interior remodel, relocate kitchen, provide new bedroom, remodel (e) bathroom, electrical & plumbing work as necessary.Details
unit #6 interior remodel, relocate kitchen, provide new bedroom, remodel (e) bathroom, electrical & plumbing work as necessary. | $25,000 |
| Oct 16, 2013 | Completed final sign-off Dec 2013 | 770 California St | M H M Construction | #602- revision to pa #2013.0925.7757: interior remodel, remove non-load bearing walls to relocate kitchen & bathroom. provide new bedroom.Details
#602- revision to pa #2013.0925.7757: interior remodel, remove non-load bearing walls to relocate kitchen & bathroom. provide new bedroom. | $10,000 |
| Oct 16, 2013 | Never finaled issued Oct 2013, no final | 760 Geary St | Jack Strong Plumbing & Building Services | apt #501 interior remodel: remove non-load bearing walls to relcoate kitchen. provide new bedroom, removdel (e) bath, replace one window in-kind at lightwell. electrical & plumbing work as necessary, replace lighting wiht high efficacy lighting.Details
apt #501 interior remodel: remove non-load bearing walls to relcoate kitchen. provide new bedroom, removdel (e) bath, replace one window in-kind at lightwell. electrical & plumbing work as necessary, replace lighting wiht high efficacy lighting. | $20,000 |
| Oct 16, 2013 | Completed final sign-off Feb 2014 | 254 Divisadero St | M H M Construction | apt #9 interior remodel: relocate kitchen & bath, provide new bedroom, electrical & plumbing work as necessary, replace lighting with high efficacy lighting.Details
apt #9 interior remodel: relocate kitchen & bath, provide new bedroom, electrical & plumbing work as necessary, replace lighting with high efficacy lighting. | $20,000 |
| Sep 25, 2013 | Completed final sign-off Nov 2013 | 254 Divisadero St | M H M Construction | #7 - revision to appl #2013.08.28.5432: wall layout changes due to framing verification at site.Details
#7 - revision to appl #2013.08.28.5432: wall layout changes due to framing verification at site. | |
| Sep 25, 2013 | Never finaled issued Sep 2013, no final | 196 Downey St | M H M Construction | revision to appl #2013.09.11.6463 - interior remodel at 1st floor: remodel ktichen/nook area, remodel (e) 1/2 bath & (e) bath. voluntarily reinforce deflected basement ceiling by prociding beams/posts. no work on 2nd unit (198 downey).Details
revision to appl #2013.09.11.6463 - interior remodel at 1st floor: remodel ktichen/nook area, remodel (e) 1/2 bath & (e) bath. voluntarily reinforce deflected basement ceiling by prociding beams/posts. no work on 2nd unit (198 downey). | $10,000 |
| Aug 7, 2013 | Completed final sign-off Sep 2013 | 734 Bush St | M H M Construction | #36 - abatement of complaint #201312731: revisoin to appl #201307121695 - add wall layout changes to scope of work. kitchen/bathroom remodel already approved/issue under pa #2013.07.12.1695Details
#36 - abatement of complaint #201312731: revisoin to appl #201307121695 - add wall layout changes to scope of work. kitchen/bathroom remodel already approved/issue under pa #2013.07.12.1695 | $2,000 |
| Jul 31, 2013 | Completed final sign-off Jan 2018 | 972 Bush St | M H M Construction | interior renovation of apartment building. convert recreation room & ofice on ground floor to 3 new units as # 6, # 7 & #8. remodel (e) unit# 5 on 2nd floor. replace windows per plan. provide common roof deck. no expansion to building envelope.Details
interior renovation of apartment building. convert recreation room & ofice on ground floor to 3 new units as # 6, # 7 & #8. remodel (e) unit# 5 on 2nd floor. replace windows per plan. provide common roof deck. no expansion to building envelope. | $78,000 |
| Jun 12, 2013 | Completed final sign-off Aug 2013 | 500 Leavenworth St | M H M Construction | apt #103 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. electrical & plumbing work as necessary. replace lighting with high efficacy lighting.Details
apt #103 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. electrical & plumbing work as necessary. replace lighting with high efficacy lighting. | $20,000 |
| Jun 12, 2013 | Completed final sign-off Sep 2013 | 500 Leavenworth St | M H M Construction | apt #507 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. electrical & plumbing work as necessary. replace lighting with high efficacy lighting.Details
apt #507 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. electrical & plumbing work as necessary. replace lighting with high efficacy lighting. | $20,000 |
| May 22, 2013 | Completed final sign-off Aug 2013 | 500 Leavenworth St | M H M Construction | apt #505 - interior remodel, remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. electrical & plumbing work as necessary, replace lighting with high efficacy lighting.Details
apt #505 - interior remodel, remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. electrical & plumbing work as necessary, replace lighting with high efficacy lighting. | $20,000 |
| May 1, 2013 | Completed final sign-off Jul 2013 | 745 Hyde St | M H M Construction | #64- interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel extg bath. electrical and plmbg work as necessary. replace lighting with high efficacy lighting. replace one window in kind in extg lightwell.Details
#64- interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel extg bath. electrical and plmbg work as necessary. replace lighting with high efficacy lighting. replace one window in kind in extg lightwell. | $20,000 |
| May 1, 2013 | Completed final sign-off Dec 2014 | 600 Stanyan St | M H M Construction | expand & remodel apt# 103. relocate (e) living room & bedroom. create new bedroom & 2 new baths at ground floor. create new stair opening connecting 2 levels. new habitable space to be 874 sq. ft. declare conforming units per table on sheet 1. no change to exterior.Details
expand & remodel apt# 103. relocate (e) living room & bedroom. create new bedroom & 2 new baths at ground floor. create new stair opening connecting 2 levels. new habitable space to be 874 sq. ft. declare conforming units per table on sheet 1. no change to exterior. | $46,000 |
| Apr 11, 2013 | Completed final sign-off Jun 2013 | 1106 Bush St | M H M Construction | unit #504 itnerior remodel: remove non-load bearing walls to relocate kitchen, provide 2 new bedrooms, remodel (e) bath, replace (e) window facing lightwell, electricla & plumbing work as necessary, replace lighting with high efficacy lighting.Details
unit #504 itnerior remodel: remove non-load bearing walls to relocate kitchen, provide 2 new bedrooms, remodel (e) bath, replace (e) window facing lightwell, electricla & plumbing work as necessary, replace lighting with high efficacy lighting. | $28,000 |
| Feb 13, 2013 | Completed final sign-off Apr 2013 | 1035 Pine St | M H M Construction | unit #602 interior remodel: remove non-load bearing walls to relocate kitchen, provide (n) living area, remodel (e) bath, replace (e) window facing lightwell, electrical & plumbing work as necessary. replace lighting with high efficacy lighting.Details
unit #602 interior remodel: remove non-load bearing walls to relocate kitchen, provide (n) living area, remodel (e) bath, replace (e) window facing lightwell, electrical & plumbing work as necessary. replace lighting with high efficacy lighting. | $25,000 |
| Feb 6, 2013 | Completed final sign-off Apr 2013 | 500 Leavenworth St | M H M Construction | unit #502 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. replace one (e) window in lightwell. electrical & plumbing work as necessary, replace lighting with high efficacy lighting.Details
unit #502 interior remodel: remove non-load bearing walls to relocate kitchen. provide new bedroom, remodel (e) bath. replace one (e) window in lightwell. electrical & plumbing work as necessary, replace lighting with high efficacy lighting. | $20,000 |
| Feb 6, 2013 | Completed final sign-off Apr 2013 | 887 Bush St | M H M Construction | unit #101 inteiror remodel: remove non-load bearing walls to relocate kitchen. relocate one (e) bath & remodel one (e) bath. replace all (e) windows facing lightwell. electrical & plumbing work as necessary, replace lighting with high efficacy lighting.Details
unit #101 inteiror remodel: remove non-load bearing walls to relocate kitchen. relocate one (e) bath & remodel one (e) bath. replace all (e) windows facing lightwell. electrical & plumbing work as necessary, replace lighting with high efficacy lighting. | $20,000 |
| Jan 22, 2013 | Completed final sign-off Jul 2013 | 10 Balmy St | Gonzalez Painting Construction & Plumbin | abatement of nov# 201238581-remove illegally built additions on roof,. revert back to original building envelope. re-roof as required. work on attic & roof onlyDetails
abatement of nov# 201238581-remove illegally built additions on roof,. revert back to original building envelope. re-roof as required. work on attic & roof only | $8,000 |
| Nov 30, 2012 | Expired or cancelled cancelled Nov 2024 | 153 Prentiss St | horizontal addition of 3 bedrooms & an attic/storage.Details
horizontal addition of 3 bedrooms & an attic/storage. | $65,000 | |
| Aug 3, 2012 | Completed final sign-off Oct 2012 | 887 Bush St | M H M Construction | remodel apartment #507: remove non-load bearing walls, appliances and fixtures to remodel kitchen, bath, and bedrooms. replace window in bath. replace lighting with high efficiency lighting. plumbing and electrical work as necessary.Details
remodel apartment #507: remove non-load bearing walls, appliances and fixtures to remodel kitchen, bath, and bedrooms. replace window in bath. replace lighting with high efficiency lighting. plumbing and electrical work as necessary. | $20,000 |
| May 3, 2012 | Completed final sign-off Aug 2012 | 1015 Battery St | as-built to appl #201112050030 - remodel facade at front terrace. remodle (n) wine display. provide lighting & mechanical compliance.Details
as-built to appl #201112050030 - remodel facade at front terrace. remodle (n) wine display. provide lighting & mechanical compliance. | $10,000 |