Irene U. Aquino
- Listed as
- architect, engineer
- Firm
- City & County Of Sf - Boa
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Aug 2026
6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 3 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 1650 Mission St | renovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312.Details
renovation of suite 312. to commodate conference room, bigger breakroom area, new reception desk, new flooring, relocate electric as required, new plumbing for breakroom sink minor code compliance upgrades to the restrooms to suire 312. | $850,000 | |
| Nov 3, 2022 | Completed final sign-off Mar 2025 | 25 Van Ness Av | 7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.Details
7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles. | $1,275,000 | |
| Jun 14, 2022 | Completed final sign-off Sep 2023 | 1650 Mission St | ste 300 3rd flr: add mechanical cooling to data server room equipment, and separate server space from adjoining breakroom. selective demo. new non-structural partition & new door. replace finishes as needed. electrical, hvac & fire sprinkler under separate permits.Details
ste 300 3rd flr: add mechanical cooling to data server room equipment, and separate server space from adjoining breakroom. selective demo. new non-structural partition & new door. replace finishes as needed. electrical, hvac & fire sprinkler under separate permits. | $150,000 | |
| Nov 15, 2021 | Completed final sign-off Dec 2024 | 100 Larkin St | Ccsf Dpw-Bbr Steamfitters/Plumbers | non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvacDetails
non structural interior alterations, including selective demo and new partitions, doors, ceilings, finishes and mep including lighting and hvac | $679,125 |
| Dec 12, 2019 | Never finaled issued Jan 2020, no final | 1 South Van Ness Av | ref pa# 201906193819; install heat pump to cool data roomDetails
ref pa# 201906193819; install heat pump to cool data room | $150,000 | |
| Jun 19, 2019 | Never finaled issued Oct 2019, no final | 1 South Van Ness Av | 8/f: selective demo of partitions, doors, finishes. relocation of light fixtures. installation of new partitons, glazed opening, and diffusers. ada upgrades in restrooms.Details
8/f: selective demo of partitions, doors, finishes. relocation of light fixtures. installation of new partitons, glazed opening, and diffusers. ada upgrades in restrooms. | $150,000 |