Idan Cohen
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- Remodeling Heroes Inc.
- Based in
- Concord
- On San Francisco permits
- Jan 2020 to Oct 2026
95 permits since 2000 (contractor on 93 permits, authorized agent-others on 2 permits, pmt consultant/expediter on 2 permits): 59 completed, 13 in progress, 14 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 1307 04th Av | Remodeling Heroes Inc. | work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sfDetails
work on 1307 4th ave only: bathroom remodel to reconfigure the bathroom, replace sink, fan, toilet and bathtub to shower (curbless) approximately 39sf | $28,000 |
| Sep 25, 2026 | In progress issued Sep 2026 | 2 Fallon Pl | Remodeling Heroes Inc. | unit # 52: laundry cabinet in the bathroom closetDetails
unit # 52: laundry cabinet in the bathroom closet | $10,000 |
| Sep 4, 2026 | Completed final sign-off Sep 2026 | 367 Fair Oaks St | Remodeling Heroes Inc. | to obtain final inspection for work approved under pa#202011309876 all work is complete.Details
to obtain final inspection for work approved under pa#202011309876 all work is complete. | |
| Aug 28, 2026 | In progress issued Sep 2026 | 1463 Pacific Av | Remodeling Heroes Inc. | 1/f: kitchen remodel like for like. replace cabinets, applicances, replace kitchen sink, dishwasher & lights all in same location of the kitchen. upgrade mep to code.Details
1/f: kitchen remodel like for like. replace cabinets, applicances, replace kitchen sink, dishwasher & lights all in same location of the kitchen. upgrade mep to code. | $33,000 |
| Aug 26, 2026 | In progress issued Aug 2026 | 132 Alpine Tr | Remodeling Heroes Inc. | repair rear deck less than 50%Details
repair rear deck less than 50% | $18,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 1463 Pacific Av | Remodeling Heroes Inc. | like for like bathroom remodel, no structual changes, no removal of walls, replace lights, fan ,toilet, vanity. no tub to shower conversions, all work is interior.Details
like for like bathroom remodel, no structual changes, no removal of walls, replace lights, fan ,toilet, vanity. no tub to shower conversions, all work is interior. | $22,000 |
| May 15, 2026 | In progress issued Jun 2026 | 153 Marview Wy | Remodeling Heroes Inc. | building a new deck and replacing existing window with a sliding door.Details
building a new deck and replacing existing window with a sliding door. | $20,000 |
| Jan 30, 2026 | Completed final sign-off Jun 2026 | 1344 06th Av | Remodeling Heroes Inc. | kitchen remodel like for like 206 sq ftDetails
kitchen remodel like for like 206 sq ft | $40,000 |
| Jan 9, 2026 | In progress issued Jan 2026 | 1527 11th Av | Remodeling Heroes Inc. | minor interior remodel of an attached sfd. including kitchen, bath, remodel 1st fl and new full bath and closets on 3rd flDetails
minor interior remodel of an attached sfd. including kitchen, bath, remodel 1st fl and new full bath and closets on 3rd fl | $110,000 |
| Jan 9, 2026 | Completed final sign-off Jun 2026 | 1342 06th Av | Remodeling Heroes Inc. | kitchen remodel like for like 137.06 sdqft. no structural work.Details
kitchen remodel like for like 137.06 sdqft. no structural work. | $35,000 |
| Dec 31, 2025 | In progress issued Dec 2025 | 579 Lakeview Av | Remodeling Heroes Inc. | per inspector request to having this scope on bldg permit legalize washer and dryer. gasoline and 220 dedicated line ventilation. pp20251204222, e202512047566 and 202510248123Details
per inspector request to having this scope on bldg permit legalize washer and dryer. gasoline and 220 dedicated line ventilation. pp20251204222, e202512047566 and 202510248123 | |
| Oct 24, 2025 | Completed final sign-off Jan 2026 | 579 Lakeview Av | Remodeling Heroes Inc. | 1 shower repair due to leak remove tile to access pipesDetails
1 shower repair due to leak remove tile to access pipes | $18,000 |
| Oct 17, 2025 | Completed final sign-off Jan 2026 | 75 Vienna St | Remodeling Heroes Inc. | one bathroom remodel, like for like. no structural changes. replace toilet, shower, vanity, sin, fan upgrade. safety bars. mep to code. 41 sq ftDetails
one bathroom remodel, like for like. no structural changes. replace toilet, shower, vanity, sin, fan upgrade. safety bars. mep to code. 41 sq ft | $30,000 |
| Sep 9, 2025 | Completed final sign-off Dec 2025 | 1325 Divisadero St | Remodeling Heroes Inc. | unit 104: bathroom remodel shower like for like 35 sqft, kitchen remodel like for like 65 sqft.Details
unit 104: bathroom remodel shower like for like 35 sqft, kitchen remodel like for like 65 sqft. | $48,000 |
| Sep 9, 2025 | Expired or cancelled cancelled Jun 2026 | 130 Alpine Tr | Remodeling Heroes Inc. | replace (e) covered deck with new 275 sf open deck attached to on fully detached two unit residence.Details
replace (e) covered deck with new 275 sf open deck attached to on fully detached two unit residence. | $30,000 |
| Aug 19, 2025 | Completed final sign-off Apr 2026 | 1587 11th Av | Remodeling Heroes Inc. | convert 92 sqft of (e) garage/den area on the 1st fl. to conditioned space for a new full bathroom and vestibule, with washer/dryer hookups. install topping slab over (e) concrete to accomodate new drain, waste, and vent (dpw) plumbing. add hvac register from (e) system to serve the new bath.Details
convert 92 sqft of (e) garage/den area on the 1st fl. to conditioned space for a new full bathroom and vestibule, with washer/dryer hookups. install topping slab over (e) concrete to accomodate new drain, waste, and vent (dpw) plumbing. add hvac register from (e) system to serve the new bath. | $30,000 |
| Aug 8, 2025 | Completed final sign-off Nov 2025 | 174 Arbor St | Remodeling Heroes Inc. | revision 202406184700- document purpose to include sprial staircase shop drawings/engineering.Details
revision 202406184700- document purpose to include sprial staircase shop drawings/engineering. | |
| Jul 31, 2025 | In progress issued Aug 2025 | 219 Lake Merced Hill St North St | Remodeling Heroes Inc. | partial bathroom remodeling. replace shower pan, wet walls, shower head, and valve.Details
partial bathroom remodeling. replace shower pan, wet walls, shower head, and valve. | $10,000 |
| Jul 11, 2025 | Completed final sign-off Dec 2025 | 1260 Mason St | Remodeling Heroes Inc., M A Gunst Design Build Llc Dba Betelgeu | unit b 2nd floor: bathroom remodel. no structual changes like for like 33 sq ft shower.Details
unit b 2nd floor: bathroom remodel. no structual changes like for like 33 sq ft shower. | $15,000 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 23 Scott Al | Remodeling Heroes Inc. | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| Jan 16, 2025 | Completed final sign-off Apr 2025 | 1255 California St | Remodeling Heroes Inc. | unit 603: remodel guest bathroom like for like. replace all plumbing fixtures, shower, 2 outlets & 2 new r.l.Details
unit 603: remodel guest bathroom like for like. replace all plumbing fixtures, shower, 2 outlets & 2 new r.l. | $26,000 |
| Jan 3, 2025 | Completed final sign-off Mar 2025 | 3789 Fillmore St | Remodeling Heroes Inc. | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment. | $25,000 |
| Nov 21, 2024 | Completed final sign-off Nov 2025 | 174 Arbor St | Remodeling Heroes Inc. | adding a 3rd bedroom and roof deck at the back patio. remodel 1/f and adding a 2nd bathroom.Details
adding a 3rd bedroom and roof deck at the back patio. remodel 1/f and adding a 2nd bathroom. | $98,392 |
| Nov 19, 2024 | Completed final sign-off Mar 2025 | 332 Castro St | Remodeling Heroes Inc. | kitchen & bath remodel in unit 332a like for like. no change in layout or walls. also doing a like for like window replacement. (3 total)Details
kitchen & bath remodel in unit 332a like for like. no change in layout or walls. also doing a like for like window replacement. (3 total) | $61,250 |
| Aug 13, 2024 | In progress filed Aug 2024, not yet issued | 835 Darien Wy | Remodeling Heroes Inc. | install (n) door at exterior of the house as well as installing steps & landingDetails
install (n) door at exterior of the house as well as installing steps & landing | $22,875 |
| Jun 18, 2024 | Completed final sign-off Jul 2024 | 1 Daniel Burnham Ct | Remodeling Heroes Inc. | bathroom remodel, like for like, no change in walls or layout.Details
bathroom remodel, like for like, no change in walls or layout. | $20,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 1026 Filbert St | Remodeling Heroes Inc. | kitchen remodel - like for like, no change in layout.Details
kitchen remodel - like for like, no change in layout. | $45,500 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 1024 Filbert St | Remodeling Heroes Inc. | kitchen remodel - like for like, no change in plans.Details
kitchen remodel - like for like, no change in plans. | $45,500 |
| May 22, 2024 | Completed final sign-off May 2025 | 453 Teresita Bl | Remodeling Heroes Inc. | remodel (e) basement. 8 new lights and relocate few outlets.Details
remodel (e) basement. 8 new lights and relocate few outlets. | $45,000 |
| May 6, 2024 | Completed final sign-off Oct 2025 | 3585 Mission St | Remodeling Heroes Inc. | legalize deck and repair damaged structural membersDetails
legalize deck and repair damaged structural members | $3,500 |
| May 6, 2024 | In progress issued May 2024 | 2435 Bryant St | Remodeling Heroes Inc. | window replaced @ front facade and demo fireplace at 2nd fl living roomDetails
window replaced @ front facade and demo fireplace at 2nd fl living room | $15,000 |
| Jan 30, 2024 | Completed final sign-off May 2024 | 1255 California St | Remodeling Heroes Inc. | unit 603-to comply w/ complaint# 202314738; full bath remodel code violation fix putting shower back in place and moving washer dryer backDetails
unit 603-to comply w/ complaint# 202314738; full bath remodel code violation fix putting shower back in place and moving washer dryer back | $25,000 |
| Dec 22, 2023 | Completed final sign-off Mar 2024 | 1465 Pacific Av | Remodeling Heroes Inc. | bathroom remodel and new laundry per planDetails
bathroom remodel and new laundry per plan | $45,000 |
| Nov 2, 2023 | In progress filed Nov 2023, not yet issued | 614 Page St | Remodeling Heroes Inc. | 2 new construction windows in atticDetails
2 new construction windows in attic | $7,343 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 525 Wildwood Wy | Remodeling Heroes Inc. | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,840 |
| Sep 29, 2023 | Completed final sign-off Feb 2024 | 1994 43rd Av | Remodeling Heroes Inc. | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $24,400 |
| Sep 5, 2023 | Expired or cancelled cancelled Apr 2024 | 82 Landers St | Remodeling Heroes Inc. | kitchen and bath remodel. like for like. no structural , no layout changes.Details
kitchen and bath remodel. like for like. no structural , no layout changes. | $78,500 |
| Jun 22, 2023 | Expired or cancelled expired Aug 2026 | 22 Hillway Av | Remodeling Heroes Inc. | new construction of master bathroom and guest bathroom remodelDetails
new construction of master bathroom and guest bathroom remodel | $53,500 |
| Jun 7, 2023 | Expired or cancelled withdrawn Aug 2024 | 82 Landers St | Remodeling Heroes Inc. | replacing (e) deck. new construction bathroom. bathroom remodel. add new sliding door.Details
replacing (e) deck. new construction bathroom. bathroom remodel. add new sliding door. | $75,000 |
| Jun 7, 2023 | Completed final sign-off Sep 2023 | 1255 California St | Remodeling Heroes Inc. | 2 bathroom remodels: demo (e) tile and plumbing fixtures, reusing tub, replace each shower valvue in each shower, replace shower head and trims in each shower, repalce drain cover in walk-in shower, waterproof shower walls in both showers, and retile both showersDetails
2 bathroom remodels: demo (e) tile and plumbing fixtures, reusing tub, replace each shower valvue in each shower, replace shower head and trims in each shower, repalce drain cover in walk-in shower, waterproof shower walls in both showers, and retile both showers | $20,000 |
| Jun 5, 2023 | Completed final sign-off Aug 2023 | 387 Eureka St | Remodeling Heroes Inc. | to comply with nov20236104: replace backyard fence. 10'-0"Details
to comply with nov20236104: replace backyard fence. 10'-0" | $1,500 |
| May 8, 2023 | Completed final sign-off Nov 2023 | 344 Liberty St | Remodeling Heroes Inc. | kitchen remodel, 2 bathroom remodels, changing 1/2 bath into full bath. adding new construction windows (unit 344)Details
kitchen remodel, 2 bathroom remodels, changing 1/2 bath into full bath. adding new construction windows (unit 344) | $70,000 |
| Dec 22, 2022 | Expired or cancelled withdrawn Aug 2024 | 3585 Mission St | Remodeling Heroes Inc. | legalize deck, 140 sf.Details
legalize deck, 140 sf. | $18,000 |
| Nov 4, 2022 | Completed final sign-off Sep 2023 | 56 Moss St | Remodeling Heroes Inc. | complete bathroom remodel, converting tub to walk-in shower, and adding a new soaking tub. adding a new skylight.Details
complete bathroom remodel, converting tub to walk-in shower, and adding a new soaking tub. adding a new skylight. | $25,000 |
| Nov 1, 2022 | Completed final sign-off Jan 2023 | 1484 36th Av | Remodeling Heroes Inc. | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $27,000 |
| Oct 27, 2022 | Completed final sign-off Jul 2023 | 20 Tiffany Av | Remodeling Heroes Inc. | unit #20: kitchen remodel (like for like)Details
unit #20: kitchen remodel (like for like) | $47,500 |
| Oct 18, 2022 | Completed final sign-off Jun 2023 | 1220 Silver Av | Remodeling Heroes Inc. | 2nd fl: new construction bathroom. existing bathroom remodeling with change of tub to shower relocation. kitchen remodeling with relocation of sink, like for like replacement. remove one (e) skylight, and replace one (e) skylight.Details
2nd fl: new construction bathroom. existing bathroom remodeling with change of tub to shower relocation. kitchen remodeling with relocation of sink, like for like replacement. remove one (e) skylight, and replace one (e) skylight. | $15,000 |
| Oct 12, 2022 | Completed final sign-off Jan 2023 | 1914 45th Av | Remodeling Heroes Inc. | bathroom remodeling like for like. replace all plumbing fixtures, shower, toilet, sink, update e/m/p up to code. 2 gfci, 2 recessed lights.Details
bathroom remodeling like for like. replace all plumbing fixtures, shower, toilet, sink, update e/m/p up to code. 2 gfci, 2 recessed lights. | $25,000 |
| Sep 22, 2022 | Completed final sign-off Jun 2023 | 1220 Silver Av | Remodeling Heroes Inc. | 2 bath remodel like for like, replace plumbing fixtures, update e/m/p to code. new flooring. kitchen remodel, like for like. replace plumbing fixtures, appliancesDetails
2 bath remodel like for like, replace plumbing fixtures, update e/m/p to code. new flooring. kitchen remodel, like for like. replace plumbing fixtures, appliances | $23,000 |
| Aug 17, 2022 | Completed final sign-off Sep 2022 | 1783 San Jose Av | Remodeling Heroes Inc. | (1) bathroom remodeling - like for like.Details
(1) bathroom remodeling - like for like. | $35,000 |
| Jun 27, 2022 | Never finaled filed Jun 2022, never issued | 330 Vernon St | Remodeling Heroes Inc. | 6 ft to 10 ft high fence (30 ft) horizontal wood along side rear yard,Details
6 ft to 10 ft high fence (30 ft) horizontal wood along side rear yard, | $6,000 |
| Jun 17, 2022 | Never finaled filed Jun 2022, never issued | 1012 Shrader St | Remodeling Heroes Inc. | remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof.Details
remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof. | $70,000 |
| May 23, 2022 | Completed final sign-off Oct 2022 | 2600 18th St | Remodeling Heroes Inc. | 2 bathroom remodeling like for like and kitchen like for like replace gas stove to electric, bathroom all plumbing fixtures to be replace tub to wall in shower tub to free standing update e/n/p up to codeDetails
2 bathroom remodeling like for like and kitchen like for like replace gas stove to electric, bathroom all plumbing fixtures to be replace tub to wall in shower tub to free standing update e/n/p up to code | $30,000 |
| May 19, 2022 | Completed final sign-off Sep 2023 | 760 Duboce Av | Remodeling Heroes Inc. | relocate kitchen. adding new construction half bath. adding new laundry room. increased closet space and relocate plumbing.Details
relocate kitchen. adding new construction half bath. adding new laundry room. increased closet space and relocate plumbing. | $40,000 |
| May 18, 2022 | Expired or cancelled cancelled Jul 2022 | 2225 23rd St | G B U Construction Development, Remodeling Heroes Inc. | unit# 315. 1 bathroom remodel. convert tub to walk in shower.Details
unit# 315. 1 bathroom remodel. convert tub to walk in shower. | $15,000 |
| May 18, 2022 | Completed final sign-off Dec 2022 | 627 San Bruno Av | Remodeling Heroes Inc. | add second dwelling unit within density.Details
add second dwelling unit within density. | $25,000 |
| May 18, 2022 | Completed final sign-off Sep 2022 | 1262 48th Av | Remodeling Heroes Inc. | 2 bathroom remodel. 1 guest bathroom like to like. 1 master bathroom convert tub to walk in shower. shower head flow rate <1.8 gpmDetails
2 bathroom remodel. 1 guest bathroom like to like. 1 master bathroom convert tub to walk in shower. shower head flow rate <1.8 gpm | $60,000 |
| May 11, 2022 | Expired or cancelled cancelled Jul 2022 | 330 Vernon St | Remodeling Heroes Inc. | fence remodel, like to like 10' feet high fence (30 feet) horizontal wood along side in rear yard.Details
fence remodel, like to like 10' feet high fence (30 feet) horizontal wood along side in rear yard. | $6,000 |
| Apr 21, 2022 | Completed final sign-off Dec 2023 | 66 Clifford Tr | Remodeling Heroes Inc. | 2 and half bathrooms remodeling in kind.Details
2 and half bathrooms remodeling in kind. | $30,000 |
| Apr 4, 2022 | Never finaled issued Apr 2022, no final | 1070 Haight St | Remodeling Heroes Inc. | siding replacement: about 100x25ft (approx 2500 sqft)Details
siding replacement: about 100x25ft (approx 2500 sqft) | $60,000 |
| Mar 17, 2022 | Completed final sign-off Nov 2022 | 2079 44th Av | Remodeling Heroes Inc. | replace 2 retrofit windows (facing the street) with aluminum clad wood windows.Details
replace 2 retrofit windows (facing the street) with aluminum clad wood windows. | $5,000 |
| Mar 1, 2022 | Completed final sign-off Nov 2022 | 2079 44th Av | Remodeling Heroes Inc. | revision for valuation on bpa#202110070076Details
revision for valuation on bpa#202110070076 | $90,000 |
| Feb 2, 2022 | Completed final sign-off Feb 2022 | 1907 Eddy St | Remodeling Heroes Inc. | window installation (dining room) like for like. not visible to the street.Details
window installation (dining room) like for like. not visible to the street. | $5,200 |
| Feb 2, 2022 | Never finaled issued Apr 2022, no final | 985 Clayton St | Remodeling Heroes Inc. | bathroom remodel.Details
bathroom remodel. | $27,000 |
| Jan 26, 2022 | Expired or cancelled cancelled Jan 2026 | 2724 Santiago St | Remodeling Heroes Inc. | master bath remodel with changes to the layout. create hallway between e bedroomsDetails
master bath remodel with changes to the layout. create hallway between e bedrooms | $37,000 |
| Jan 11, 2022 | Completed final sign-off Aug 2022 | 2655 16th Av | Remodeling Heroes Inc. | bathroom remodel like for like, installing new toilet, vanity, tub plumbing fixtures, light fixtures, bathroom fan, new wall tiles and floor tilesDetails
bathroom remodel like for like, installing new toilet, vanity, tub plumbing fixtures, light fixtures, bathroom fan, new wall tiles and floor tiles | $32,400 |
| Jan 5, 2022 | Completed final sign-off Mar 2022 | 2724 Santiago St | Remodeling Heroes Inc. | one bathroom remodel like for like (tub). non structural.Details
one bathroom remodel like for like (tub). non structural. | $25,700 |
| Dec 3, 2021 | Completed final sign-off Dec 2023 | 66 Clifford Tr | Remodeling Heroes Inc. | kitchen remodel. remove e non bearing partiton wall at kitchen/dining rm, new kitchen cabinetry,finishes, appliances, mechanical and electrical and plumbingDetails
kitchen remodel. remove e non bearing partiton wall at kitchen/dining rm, new kitchen cabinetry,finishes, appliances, mechanical and electrical and plumbing | $30,000 |
| Oct 13, 2021 | Completed final sign-off Feb 2022 | 57 Arleta Av | Remodeling Heroes Inc. | kitchen remodel like for like non structuralDetails
kitchen remodel like for like non structural | $32,700 |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 860 Head St | Remodeling Heroes Inc. | kitchen remodel like for like non structuralDetails
kitchen remodel like for like non structural | $35,400 |
| Oct 7, 2021 | Completed final sign-off Nov 2022 | 2079 44th Av | Remodeling Heroes Inc. | remodeling 1 kitchen, 2 bathrooms, interior remodel to convert (e) garage to 371sf habitable space 1 bedroom, remove load bearign walls,r elocate washer/dryer to 1/f per plans, upgrade electrical and 200a, new rear deck with stairs.Details
remodeling 1 kitchen, 2 bathrooms, interior remodel to convert (e) garage to 371sf habitable space 1 bedroom, remove load bearign walls,r elocate washer/dryer to 1/f per plans, upgrade electrical and 200a, new rear deck with stairs. | $50,000 |
| Aug 23, 2021 | Completed final sign-off Jun 2022 | 718 Shrader St | Remodeling Heroes Inc. | kitchen remodel like for like. fixtures in kind led litesDetails
kitchen remodel like for like. fixtures in kind led lites | $25,000 |
| Jul 28, 2021 | Completed final sign-off Mar 2023 | 47 Winfield St | Remodeling Heroes Inc. | rev to pa202103096123: changes to master bath: shower/vanity instead of tub/shower & vanity, 1/f: change layout of closets, framing in the kitchen per plans.Details
rev to pa202103096123: changes to master bath: shower/vanity instead of tub/shower & vanity, 1/f: change layout of closets, framing in the kitchen per plans. | |
| Jul 26, 2021 | Never finaled issued Jul 2021, no final | 1421 Masonic Av | Remodeling Heroes Inc. | apt 51: remodel bathroom - like for like. (e) tub. new plumbing fixtures: shower head, valve, tub faucet. new tile onthe walls and floors, new vanity.Details
apt 51: remodel bathroom - like for like. (e) tub. new plumbing fixtures: shower head, valve, tub faucet. new tile onthe walls and floors, new vanity. | $15,000 |
| Jul 2, 2021 | Completed final sign-off Apr 2022 | 84 Mangels Av | Realty Builders Inc | remodel 1 bathroom like for like. rub replacement, toilet, vanity shower, plumbing fixtures,sink 3 gfci, 3 light sconces.Details
remodel 1 bathroom like for like. rub replacement, toilet, vanity shower, plumbing fixtures,sink 3 gfci, 3 light sconces. | $18,000 |
| Jun 15, 2021 | Completed final sign-off Aug 2021 | 693 44th Av | Remodeling Heroes Inc. | one bathroom remodel, convert tub to shower. shower to washer & dryer area intall 2 recessed lights replace plumbing fixtures, update e/m/p up to code.Details
one bathroom remodel, convert tub to shower. shower to washer & dryer area intall 2 recessed lights replace plumbing fixtures, update e/m/p up to code. | $32,000 |
| May 24, 2021 | Never finaled issued May 2021, no final | 35 Madrone Av | Realty Builders Inc | complete kitchen remodeling. 8 led lights & gfci, 3 light switches. replace plumbing fixtuers and appliances. update mep up to code.Details
complete kitchen remodeling. 8 led lights & gfci, 3 light switches. replace plumbing fixtuers and appliances. update mep up to code. | $20,000 |
| May 13, 2021 | In progress issued Jul 2026 | 2432 Santiago St | Remodeling Heroes Inc. | interior remodel of the 1st and 2nd floors of an existing fully-detached single family residence. including a new rear exterior deck with stairsDetails
interior remodel of the 1st and 2nd floors of an existing fully-detached single family residence. including a new rear exterior deck with stairs | $400,000 |
| Apr 28, 2021 | Completed final sign-off Jan 2022 | 264 Dalewood Wy | Remodeling Heroes Inc. | bearing wall removal and kitchen remodel. existing chimney removal and new 2 sided chimney installation. new gas fireplace.Details
bearing wall removal and kitchen remodel. existing chimney removal and new 2 sided chimney installation. new gas fireplace. | $45,000 |
| Apr 15, 2021 | Never finaled issued Apr 2021, no final | 590 06th St | Remodeling Heroes Inc. | unit # 206: bathroom remodel in-kind. (1 of 3 bathrooms)Details
unit # 206: bathroom remodel in-kind. (1 of 3 bathrooms) | $18,000 |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 10 Cerritos Av | Remodeling Heroes Inc. | install new roof hatchDetails
install new roof hatch | $8,000 |
| Mar 9, 2021 | Completed final sign-off Mar 2023 | 47 Winfield St | Remodeling Heroes Inc. | kitchen renovation. interior stair rebuilt.Details
kitchen renovation. interior stair rebuilt. | $50,000 |
| Feb 23, 2021 | Completed final sign-off Sep 2021 | 1998 Pacific Av | Remodeling Heroes Inc. | kitchen remodel like for like add island upgrade, elec/mech/plumbing up to code. 2 bathroom remodeling like for like replace plumbing fixtures (6) upgrade elec/mech/plum up to code add 18 totalDetails
kitchen remodel like for like add island upgrade, elec/mech/plumbing up to code. 2 bathroom remodeling like for like replace plumbing fixtures (6) upgrade elec/mech/plum up to code add 18 total | $33,000 |
| Jan 14, 2021 | Completed final sign-off Apr 2021 | 207 Caselli Av | Remodeling Heroes Inc. | bathroom remodeling ilke for like replace plumbing,fixtures replace tub, upgrade plumbing up to codeDetails
bathroom remodeling ilke for like replace plumbing,fixtures replace tub, upgrade plumbing up to code | $18,000 |
| Nov 30, 2020 | Expired or cancelled expired Sep 2026 | 367 Fair Oaks St | Remodeling Heroes Inc. | bathroom remodel. powder room remodel and remove wall.Details
bathroom remodel. powder room remodel and remove wall. | $30,000 |
| Nov 17, 2020 | Never finaled issued Jan 2021, no final | 590 06th St | Remodeling Heroes Inc. | revision to pa #202009295375 - add an utility sink on the first floor. remove non-load bearing wall and replace all fixtures in existing bathroom on third floorDetails
revision to pa #202009295375 - add an utility sink on the first floor. remove non-load bearing wall and replace all fixtures in existing bathroom on third floor | $20,000 |
| Nov 4, 2020 | Never finaled issued Jan 2021, no final | 2718 Bryant St | Remodeling Heroes Inc. | convert (e) office to full bathroom incl shower. no structural work.Details
convert (e) office to full bathroom incl shower. no structural work. | $18,000 |
| Oct 22, 2020 | Never finaled filed Oct 2020, never issued | 51 Kissling St | Remodeling Heroes Inc. | convert the basement & part of the garage into new 1st floor. new bathroom, bedroom, laundry room, dig down & redo the foundations & the slab and remove deck. ** maher: n/a **Details
convert the basement & part of the garage into new 1st floor. new bathroom, bedroom, laundry room, dig down & redo the foundations & the slab and remove deck. ** maher: n/a ** | $400,000 |
| Oct 16, 2020 | Completed final sign-off Apr 2024 | 1606 La Playa | Remodeling Heroes Inc., Lowry Construction Inc | remodel of one upstairs bathroom to convert to two en-suite bathrooms, creation of one bathroom downstairs in the garage workout area adjacent to the laundryDetails
remodel of one upstairs bathroom to convert to two en-suite bathrooms, creation of one bathroom downstairs in the garage workout area adjacent to the laundry | $20,000 |
| Sep 29, 2020 | Never finaled issued Sep 2020, no final | 590 06th St | Remodeling Heroes Inc. | 1 complete bathroom remodel like to like. no layout change. 1 complete bathroom remodel tub to walk-in shower (shower pan).Details
1 complete bathroom remodel like to like. no layout change. 1 complete bathroom remodel tub to walk-in shower (shower pan). | $12,000 |
| Sep 24, 2020 | Completed final sign-off Sep 2021 | 722 Joost Av | Remodeling Heroes Inc. | kitchen remodel, replacing old w/ new, relocating refrigerator, adding an island. remove wall bewtween dining and living rooms. no change to landscaping to parking, to impervious area and to drainage.Details
kitchen remodel, replacing old w/ new, relocating refrigerator, adding an island. remove wall bewtween dining and living rooms. no change to landscaping to parking, to impervious area and to drainage. | $10,000 |
| Sep 12, 2020 | Completed final sign-off Apr 2022 | 1400 Judah St | Remodeling Heroes Inc. | in-kind replacement of plumbing and light fixtures, appliances, cabinets, and finishes at existing kitchen and restrooms. in-kind replacement of existing exhaust/hood/fire suppression system previouslu installed under pa #2008-1006-3459. scope of work is in-kind only.Details
in-kind replacement of plumbing and light fixtures, appliances, cabinets, and finishes at existing kitchen and restrooms. in-kind replacement of existing exhaust/hood/fire suppression system previouslu installed under pa #2008-1006-3459. scope of work is in-kind only. | $100,000 |
| Aug 20, 2020 | Completed final sign-off May 2021 | 722 Joost Av | Remodeling Heroes Inc. | complete bathroom remodel like for like(60 sq feet), replacing from shower to shower, no wall relocation. all new fixtures.Details
complete bathroom remodel like for like(60 sq feet), replacing from shower to shower, no wall relocation. all new fixtures. | $5,000 |
| May 29, 2020 | Never finaled issued Jul 2020, no final | 1480 12th Av | Remodeling Heroes Inc. | retrofit 8 windows replacement at side of house of which 4 are visible from the street. shower conversion from tub to shower due to leak at plumbing. bathroom is 5 x 12.Details
retrofit 8 windows replacement at side of house of which 4 are visible from the street. shower conversion from tub to shower due to leak at plumbing. bathroom is 5 x 12. | $8,000 |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 868 Potrero Av | Remodeling Heroes Inc. | remove tile roof deck and repair roof surface and replace in kindDetails
remove tile roof deck and repair roof surface and replace in kind | $8,000 |