Hendrik Van De Pol
- Listed as
- engineer
- On San Francisco permits
- Jun 2011 to Nov 2019
7 permits since 2000 (engineer on 7 permits): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2019 | Completed final sign-off Jan 2022 | 40 Montana St | Ue Construction | g/f: convert portion of garage into a bedroom and bathroom.Details
g/f: convert portion of garage into a bedroom and bathroom. | $20,000 |
| Sep 18, 2017 | Completed final sign-off Nov 2017 | 2815 California St | adding a prep sink inside an existing counter. all work within the unit, no changes to common areas, no change to egress or occupancy or increase in area, no fire alarm, life safety or sprinkler work required. n/a maherDetails
adding a prep sink inside an existing counter. all work within the unit, no changes to common areas, no change to egress or occupancy or increase in area, no fire alarm, life safety or sprinkler work required. n/a maher | $700 | |
| Nov 15, 2016 | Completed final sign-off Oct 2018 | 1820 Kirkham St | Superb Builders Inc **See Notes** | legalize (e) 1st floor including 2 bathrooms, 1 bedroom, 1 office , 1 family room, laundry. remodel upstairs 2nd floor - convert (e) closet into bathroom.Details
legalize (e) 1st floor including 2 bathrooms, 1 bedroom, 1 office , 1 family room, laundry. remodel upstairs 2nd floor - convert (e) closet into bathroom. | $35,000 |
| Jan 20, 2015 | Never finaled issued Jan 2015, no final | 800 Van Ness Av | Kitami | revision to appl #2014.0904.5434 - revised ceiling framing as built. n/a meher ordinanceDetails
revision to appl #2014.0904.5434 - revised ceiling framing as built. n/a meher ordinance | $1,000 |
| Feb 3, 2014 | Completed final sign-off Sep 2014 | 579 Anderson St | R & D Construction Co Inc | install concrete stair from main floor to lower floor with retaining wall for stair, enclose front foye & new 1/2 bath room & laundry room. remodel (e) bath & kitchen, upgrade electrical, plumbing, mechanical, replace garage door, add new bathroom inside bedroom @ lower floor. comply with sf greenDetails
install concrete stair from main floor to lower floor with retaining wall for stair, enclose front foye & new 1/2 bath room & laundry room. remodel (e) bath & kitchen, upgrade electrical, plumbing, mechanical, replace garage door, add new bathroom inside bedroom @ lower floor. comply with sf green | $78,000 |
| Dec 3, 2013 | Completed final sign-off Apr 2020 | 306 Guerrero St | R & D Construction Co Inc | replace (e) foundation, remodel kitchen/bathrm & bedrm & add new bathrms. convert partial ground flr to bedrm & bath. new spiral stair & small landing deck @ rear. upgrade electrical, plumbing & mechanical.Details
replace (e) foundation, remodel kitchen/bathrm & bedrm & add new bathrms. convert partial ground flr to bedrm & bath. new spiral stair & small landing deck @ rear. upgrade electrical, plumbing & mechanical. | $65,000 |
| Jun 30, 2011 | Completed final sign-off May 2012 | 673 Capp St | revised roof rafter to pre-engineered roof trusses. revision to pa#201101148435.Details
revised roof rafter to pre-engineered roof trusses. revision to pa#201101148435. |