Hector Mendoza
- Listed as
- authorized agent-others, contractor
- Firm
- Tecobuild Inc
- Based in
- Cupertino
- On San Francisco permits
- Dec 2022 to Aug 2026
6 permits since 2000 (contractor on 6 permits, authorized agent-others on 1 permit): 2 completed, 3 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 705 London St | Tecobuild Inc | remove siding, fix rottten wood, install plywood, install new lath/siding. to all comply violation on walls 2026-61002. new siding to match existing siding style.Details
remove siding, fix rottten wood, install plywood, install new lath/siding. to all comply violation on walls 2026-61002. new siding to match existing siding style. | $5,000 |
| Apr 23, 2026 | In progress filed Apr 2026, not yet issued | 760 Bryant St | Tecobuild Inc | cou,1220sf from autoshop to ambulance service; demo (e) int walls and doors to create an open office layout;construct 2 ada compliant restrooms along with separate mens/womens rr; new mop room and drinking ftn and add 2 ada parking stalls with ped gate. remain space remain (e) autoshop.nov202543267Details
cou,1220sf from autoshop to ambulance service; demo (e) int walls and doors to create an open office layout;construct 2 ada compliant restrooms along with separate mens/womens rr; new mop room and drinking ftn and add 2 ada parking stalls with ped gate. remain space remain (e) autoshop.nov202543267 | $65,000 |
| Feb 29, 2024 | In progress filed Feb 2024, not yet issued | 1439 Page St | Tecobuild Inc | remove (e) radiator @ foyer. build walk in closet at foyer. convert 2 hall closets to a full bathroom.Details
remove (e) radiator @ foyer. build walk in closet at foyer. convert 2 hall closets to a full bathroom. | $20,000 |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 132 Roosevelt Wy | Tecobuild Inc | 2 bathroom remodels like for like. no floor layout change. no wall layout change. no structural work.Details
2 bathroom remodels like for like. no floor layout change. no wall layout change. no structural work. | $8,000 |
| Mar 2, 2023 | Completed final sign-off May 2023 | 223 Page St | Tecobuild Inc | bathroom remodel like for likeDetails
bathroom remodel like for like | $2,000 |
| Dec 19, 2022 | Completed final sign-off Jun 2023 | 555 04th St | Tecobuild Inc | unit #442: (1) 58 sq ft bathroom remodel on 4th floor in kind. no structural, no changes to walls or openings. replace (e) with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.Details
unit #442: (1) 58 sq ft bathroom remodel on 4th floor in kind. no structural, no changes to walls or openings. replace (e) with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. | $14,500 |