Gregory Michael Dillett, Ii
- Listed as
- engineer
- Firm
- Innodez
- On San Francisco permits
- Oct 2023 to Nov 2025
9 permits since 2000 (engineer on 9 permits): 4 completed, 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 3, 2025 | In progress issued Nov 2025 | 333 Baker St | Carbon Zero Buildings Inc | revision to permit 202506068146 to clarify new disconnect switch.Details
revision to permit 202506068146 to clarify new disconnect switch. | |
| Aug 11, 2025 | Completed final sign-off Feb 2026 | 475 Pine St | Delta Electric & Construction Services I | replace existing type 2 cooking hood with new type 1 hood at (e) restaurant. new kitchen cooking equipment. minor finishes repairs and replacement food service equipment. no structural work. new mechanical, electrical/plumbing (mep) work.Details
replace existing type 2 cooking hood with new type 1 hood at (e) restaurant. new kitchen cooking equipment. minor finishes repairs and replacement food service equipment. no structural work. new mechanical, electrical/plumbing (mep) work. | $25,000 |
| Jun 6, 2025 | In progress issued Jul 2025 | 333 Baker St | Carbon Zero Buildings Inc | remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical workDetails
remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical work | $175,000 |
| May 30, 2025 | In progress issued Jun 2025 | 1180 04th St | Carbon Zero Buildings Inc | remove old water boilers, install new heat pump, new hot water heating system, install new heat pump and perfrom associated electrical work, disconnect and cap gas pipes.Details
remove old water boilers, install new heat pump, new hot water heating system, install new heat pump and perfrom associated electrical work, disconnect and cap gas pipes. | $200,000 |
| Mar 27, 2025 | In progress issued Apr 2025 | 54 Mcallister St | Carbon Zero Buildings Inc | revision to pa # 2025-0110-8130 revision to remove the step up/ step down transformer, add new conductor, new exterior cable and remove upgraded panelDetails
revision to pa # 2025-0110-8130 revision to remove the step up/ step down transformer, add new conductor, new exterior cable and remove upgraded panel | |
| Feb 6, 2025 | In progress issued Apr 2025 | 2100 Webster St | Derry Casey Builders Inc | suite 405 on 4/f - creating new non bearing partition walls for reception desk, pre-post op and one operationg room. office includes one accessible all gender toilet. facility includes a medical gas piping system. mep work is included.Details
suite 405 on 4/f - creating new non bearing partition walls for reception desk, pre-post op and one operationg room. office includes one accessible all gender toilet. facility includes a medical gas piping system. mep work is included. | $110,696 |
| Oct 28, 2024 | Completed final sign-off Feb 2026 | 347 Dolores St | Carbon Zero Buildings Inc | demo & remove (e) gas water heater and provide new heat pump water heating system with buffer tank & electric swing tankDetails
demo & remove (e) gas water heater and provide new heat pump water heating system with buffer tank & electric swing tank | $150,000 |
| Oct 2, 2023 | Completed final sign-off Dec 2023 | 118 Diamond St | Carbon Zero Buildings Inc | replace existing gas central water heater system with a wall mounted electric heat pump sysem. replace existing gas rtu with heat pump rtu. upgrade elec circuit to laundry room.Details
replace existing gas central water heater system with a wall mounted electric heat pump sysem. replace existing gas rtu with heat pump rtu. upgrade elec circuit to laundry room. | $55,776 |
| Oct 2, 2023 | Completed final sign-off Dec 2023 | 926 Fillmore St | Carbon Zero Buildings Inc | replace existing gas central water heater system with an uprade electgrical circuit to laundry room, wall mounted electric heat pump sysem.Details
replace existing gas central water heater system with an uprade electgrical circuit to laundry room, wall mounted electric heat pump sysem. | $44,516 |