Gary Meyer
- Listed as
- architect
- On San Francisco permits
- Sep 2021 to Jul 2022
2 permits since 2000 (architect on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2022 | Completed final sign-off Dec 2024 | 3819 23rd St | Sft Construction Corp | convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert atticDetails
convert crawlspace into habitable space and garage through approx 200 cu yds excavation,add interior stair, 1 bedroom, 1 full bath, sitting area.1st fl add 1 bath, enlarge kitchen,remove wall between kitchen and lr. 2nd fl add 1 bath,enlarge kitche,remove wall betwn kitchen and lr, convert attic | $320,000 |
| Sep 17, 2021 | Completed final sign-off Nov 2021 | 179 Downey St | Jonathan Cole Construction | revision to pa# 2020-1113-8885 to keep (e) garage egress door and omit new proposed door on appoved plansDetails
revision to pa# 2020-1113-8885 to keep (e) garage egress door and omit new proposed door on appoved plans |