13 permits since 2000 (architect on 12 permits, designer on 1 permit): 10 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 18, 2026 | In progress filed Jul 2026, not yet issued | 49 Chula Ln | Eco Logic Construction & Design Inc. | vert add'n and renovation.maintain/mod (e) gas hydronic heating and gas systems.mep deferred.1/f: new bathroom,enlarge laundry rm and reconfig switchback stair.2/f: relocation of (e) bath, englarge (e) bed, new bedroom & family rm. 3/f: relocate kitchen, dining and living space.Details
vert add'n and renovation.maintain/mod (e) gas hydronic heating and gas systems.mep deferred.1/f: new bathroom,enlarge laundry rm and reconfig switchback stair.2/f: relocation of (e) bath, englarge (e) bed, new bedroom & family rm. 3/f: relocate kitchen, dining and living space. | $650,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 75 Barcelona Av | De Brus Construction Inc | reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code complyDetails
reconfigure (e) 1st fl to add family rm + powder rm. maintain (e) 2 bedrms + bathrm. new kitchenette and mudroom + laundry area. new sliding doors to access rear yard. replace (e) gas furnace w/ new gas boiler for new radiant floors- mep deferred - under sep permit. reconfigure stair for code comply | $225,000 |
| Apr 26, 2023 | Completed final sign-off Feb 2025 | 1714 Grant Av | Acri Ddc | revision to pa# 2022-0727-9402 & 2023-0407-5334; correct (e) conditions elevation datum, reduce size of roof deck, reduce height of roof parapetDetails
revision to pa# 2022-0727-9402 & 2023-0407-5334; correct (e) conditions elevation datum, reduce size of roof deck, reduce height of roof parapet | |
| Apr 13, 2023 | Completed final sign-off Feb 2024 | 480 Kansas St | Eco Logic Construction & Design Inc. | kitchen and two bath remodel, convert (e) living space to new bedroom and (e) bedroom to new living space remove (e) window and add new window aat new living room, remove two (e) skylights and add new skylight at new locationDetails
kitchen and two bath remodel, convert (e) living space to new bedroom and (e) bedroom to new living space remove (e) window and add new window aat new living room, remove two (e) skylights and add new skylight at new location | $100,000 |
| Apr 7, 2023 | Completed final sign-off Feb 2025 | 1714 Grant Av | Acri Ddc | revision to pa# 202207279402, corrected (e) fl elevation relative to sidewalk, corrvcted window tag ref and related window schedule, propose location of gas meter for pg&e, corrected note for existing sanitary sewage line, comply w/nov 202306138Details
revision to pa# 202207279402, corrected (e) fl elevation relative to sidewalk, corrvcted window tag ref and related window schedule, propose location of gas meter for pg&e, corrected note for existing sanitary sewage line, comply w/nov 202306138 | |
| Jul 27, 2022 | Completed final sign-off Feb 2025 | 1714 Grant Av | Acri Ddc | revision to pa#201801027720 to reduce scope, includes less excavation, no bay window build out on front.eliminate proprosed facade extention at floor 2, replace with exterior balcany. demolition of rear build out currently indisrepair. remove proposed skylights. maintain extg lightwell to the southDetails
revision to pa#201801027720 to reduce scope, includes less excavation, no bay window build out on front.eliminate proprosed facade extention at floor 2, replace with exterior balcany. demolition of rear build out currently indisrepair. remove proposed skylights. maintain extg lightwell to the south | |
| Feb 27, 2020 | Completed final sign-off Mar 2021 | 35 Temescal Tr | Eco Logic Construction & Design Inc. | update facade - replace windows, new stucco, repair dryrot on front facade - non structural. note, all work is replacement in "like-kind" or equivalent.Details
update facade - replace windows, new stucco, repair dryrot on front facade - non structural. note, all work is replacement in "like-kind" or equivalent. | $30,000 |
| Feb 11, 2019 | Completed final sign-off Oct 2019 | 434 Lisbon St | Eco Logic Construction & Design Inc. | add conditioned space at ground level & attic (add dormer & 2 bathrooms), remodel (e) kitchen & bathroom main level. new rear deck.Details
add conditioned space at ground level & attic (add dormer & 2 bathrooms), remodel (e) kitchen & bathroom main level. new rear deck. | $225,000 |
| Feb 16, 2018 | Completed final sign-off May 2018 | 62 Allston Wy | B Birmingham Inc. | revision to 201602109230. eliminate interior walls. rebuild scope of work.Details
revision to 201602109230. eliminate interior walls. rebuild scope of work. | |
| Feb 10, 2016 | Completed final sign-off May 2018 | 62 Allston Wy | B Birmingham Inc. | voluntary strengthening demo (e) interior stair add new interior stair for future chair lift add lower bthrm. relocate (e) interior utilities, add windows, replace windows, relocate garage dor. add french drain for site drainageDetails
voluntary strengthening demo (e) interior stair add new interior stair for future chair lift add lower bthrm. relocate (e) interior utilities, add windows, replace windows, relocate garage dor. add french drain for site drainage | $250,000 |
| Jan 26, 2016 | Completed final sign-off Oct 2018 | 365 Day St | Eco Logic Construction & Design Inc. | new seismic upgrade foundation throughout. renovate kitchen & bath @ main level. expand upper level to add new master bedroom & bath plus additional bathroom. renovate garage to convert partial livable space. new communicating stair between all levels.Details
new seismic upgrade foundation throughout. renovate kitchen & bath @ main level. expand upper level to add new master bedroom & bath plus additional bathroom. renovate garage to convert partial livable space. new communicating stair between all levels. | $650,000 |
| Dec 13, 2012 | Never finaled issued Dec 2012, no final | 1258 South Van Ness Av | Eco Logic Construction & Design Inc. | revision to pa# 201210242748 to replace stucco facade with wood siding, visible from street.Details
revision to pa# 201210242748 to replace stucco facade with wood siding, visible from street. | $2,000 |
| Oct 23, 2009 | Completed final sign-off Aug 2010 | 170 Clara St | Kevin Slagle Design & Build | revision to pa# 2007.12.31.1629. fur walls, level floor, reduce scope of deck wall. non structural work.Details
revision to pa# 2007.12.31.1629. fur walls, level floor, reduce scope of deck wall. non structural work. | $8,500 |