Fumio Suda
- Listed as
- architect, designer
- Firm
- Fumio Suda Architect
- Based in
- Berekely
- On San Francisco permits
- Nov 2005 to Jun 2026
29 permits since 2000 (architect on 28 permits, designer on 1 permit): 21 completed, 3 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 704 Larkin St | provide non structural interior partitons, comply with ada toilet.Details
provide non structural interior partitons, comply with ada toilet. | $12,000 | |
| Sep 13, 2024 | Completed final sign-off Apr 2025 | 3325 24th St | Najjar Construction Inc | convert front portion of convenient store retail sales area to food cooking/sandwich preparation and take out area including kitchen equipment, install type 1 hood, and gas cook line.Details
convert front portion of convenient store retail sales area to food cooking/sandwich preparation and take out area including kitchen equipment, install type 1 hood, and gas cook line. | $27,000 |
| Sep 3, 2024 | Completed final sign-off May 2026 | 225 Stanyan St | J A P Construction | remove portion of structure walls, create larger kitchen. convert (e) living room to a bedroom with bathroom.Details
remove portion of structure walls, create larger kitchen. convert (e) living room to a bedroom with bathroom. | $78,800 |
| Aug 27, 2024 | Completed final sign-off Nov 2024 | 508 Valencia St | Acmc Construction Inc | g/f -legalize non permitted work - install 4' x 7' walk in cooler; convert (e) toilet to storage relocate hand sink. additional combustion equipment.Details
g/f -legalize non permitted work - install 4' x 7' walk in cooler; convert (e) toilet to storage relocate hand sink. additional combustion equipment. | $12,500 |
| Jun 4, 2024 | In progress filed Jun 2024, not yet issued | 3400 Mission St | fire recovery preserve storefront. replace walk in cooler, sinks, toilet, fixtures. provide (n) prep sink, hvac differed submittal.Details
fire recovery preserve storefront. replace walk in cooler, sinks, toilet, fixtures. provide (n) prep sink, hvac differed submittal. | $312,000 | |
| Mar 28, 2024 | In progress issued Jun 2024 | 321 West Portal Av | Acmc Construction Inc | to comply w/ nov# 202420977 non structural commercial interior remodel (tenant improvement). mep deferred: type 1 kitchen hood to be legalized on a later permit.Details
to comply w/ nov# 202420977 non structural commercial interior remodel (tenant improvement). mep deferred: type 1 kitchen hood to be legalized on a later permit. | $5,500 |
| Nov 10, 2023 | Completed final sign-off Feb 2025 | 1020 Valencia St | J A P Construction | tenant improvement. type 1 hood installation & gas cook line, walk in ref, update ada toiletDetails
tenant improvement. type 1 hood installation & gas cook line, walk in ref, update ada toilet | $66,500 |
| Jul 6, 2023 | Expired or cancelled withdrawn Sep 2023 | 4951 Mission St | clarification for pa# 202212168562. ada compliance: install automatic door opener at main entrance. fix conc landing as required. abe# 202211305382.Details
clarification for pa# 202212168562. ada compliance: install automatic door opener at main entrance. fix conc landing as required. abe# 202211305382. | ||
| Mar 18, 2021 | Never finaled filed Mar 2021, never issued | 258 Flood Av | demolish portion of existing house and build new 3 story single residence with 2 car garageDetails
demolish portion of existing house and build new 3 story single residence with 2 car garage | $650,000 | |
| Feb 12, 2020 | Expired or cancelled cancelled Jan 2026 | 2149 Chestnut St | provide elect cooking line for (e) candy store.Details
provide elect cooking line for (e) candy store. | $18,000 | |
| Feb 12, 2020 | Expired or cancelled cancelled Jan 2026 | 2340 Chestnut St | remodel (e) movie concession stand & lobby w/upgrade ada restrooms, new prep kitchen per plan, no exterior work, no change of use.Details
remodel (e) movie concession stand & lobby w/upgrade ada restrooms, new prep kitchen per plan, no exterior work, no change of use. | $48,000 | |
| Jun 13, 2017 | Completed final sign-off Mar 2018 | 2934 24th St | create bread baking area in (e) market.Details
create bread baking area in (e) market. | $18,000 | |
| Aug 19, 2016 | Completed final sign-off May 2017 | 6 Longview Ct | revision to approved plan #201605036426. provide structural beam where interior wall to be removed. provide a window 1st floor back wall.Details
revision to approved plan #201605036426. provide structural beam where interior wall to be removed. provide a window 1st floor back wall. | $4,500 | |
| May 3, 2016 | Completed final sign-off May 2017 | 6 Longview Ct | remodel e kitchen and baths. close 1 window, replace 2 windows with new, legalize bedroom, office, bath at gr flDetails
remodel e kitchen and baths. close 1 window, replace 2 windows with new, legalize bedroom, office, bath at gr fl | $20,000 | |
| Oct 8, 2015 | Completed final sign-off Jan 2016 | 901 South Van Ness Av | J A P Construction | revision to 2015-0915-6981. provide 1 ada complying unisex toilet instead of new men and womens. (e) toilet to remain as unisex toiletDetails
revision to 2015-0915-6981. provide 1 ada complying unisex toilet instead of new men and womens. (e) toilet to remain as unisex toilet | $9,000 |
| Sep 15, 2015 | Completed final sign-off Jan 2016 | 901 South Van Ness Av | J A P Construction | provide automatic door opeer for entry door, remodel (e) toilets to comply with ada, no change in kitchen & dining, no exterior change.Details
provide automatic door opeer for entry door, remodel (e) toilets to comply with ada, no change in kitchen & dining, no exterior change. | $15,000 |
| Oct 8, 2014 | Completed final sign-off Mar 2015 | 341 05th Av | Tan's Construction Co | comply with nov 201497571, remodel kitchen and bath, new bath.Details
comply with nov 201497571, remodel kitchen and bath, new bath. | $15,000 |
| Mar 28, 2014 | Completed final sign-off May 2014 | 584 Washington St | Shaum Mehra Construction | revision 201312063585: clarification by architect: 1. soffit framing plan; 2. locations of ada automatic door open switch. compliance with ordinance #155-13 not required.Details
revision 201312063585: clarification by architect: 1. soffit framing plan; 2. locations of ada automatic door open switch. compliance with ordinance #155-13 not required. | |
| Dec 6, 2013 | Completed final sign-off May 2014 | 584 Washington St | Shaum Mehra Construction | storefront remodelDetails
storefront remodel | $30,000 |
| Nov 4, 2013 | Completed final sign-off May 2014 | 584 Washington St | Shaum Mehra Construction | replace (e) bar counter with accessible counter; reroute (e) accessible ramp; provide (n) light fixture and (n) sinks & floor sinks. ** maher: compliance with ordinance no# 155-13 not required **Details
replace (e) bar counter with accessible counter; reroute (e) accessible ramp; provide (n) light fixture and (n) sinks & floor sinks. ** maher: compliance with ordinance no# 155-13 not required ** | $38,000 |
| Oct 29, 2012 | Completed final sign-off May 2013 | 354 Clement St | C T W Mechanical | remodel 2 restrooms, dining area, kitchen area, change exterior door configuration on 5th ave.Details
remodel 2 restrooms, dining area, kitchen area, change exterior door configuration on 5th ave. | $35,000 |
| Aug 28, 2012 | Completed final sign-off Feb 2013 | 2525 16th St | Shaum Mehra Construction | construct partition walls within existing space. install sink for office t.iDetails
construct partition walls within existing space. install sink for office t.i | $42,000 |
| May 20, 2009 | Completed final sign-off Sep 2009 | 2482 42nd Av | Nakai Construction | replace existing windows, provide new landing and stairs at rear of bldg, provide 1 hr wall.Details
replace existing windows, provide new landing and stairs at rear of bldg, provide 1 hr wall. | $8,200 |
| Apr 6, 2007 | Completed final sign-off Jul 2007 | 1600 Portola Dr | revision to approved pa# 2006/12/04/9107. increase floor area for massage room by 80 sq. ft.Details
revision to approved pa# 2006/12/04/9107. increase floor area for massage room by 80 sq. ft. | $5,000 | |
| Dec 4, 2006 | Completed final sign-off Jul 2007 | 1600 Portola Dr | create a massage room & bathroom for home business at garage level with occupancy separation.Details
create a massage room & bathroom for home business at garage level with occupancy separation. | $18,000 | |
| Oct 31, 2006 | Completed final sign-off Mar 2007 | 64 Sunview Dr | craft room with bathroom in garage (existing).Details
craft room with bathroom in garage (existing). | $15,000 | |
| Sep 29, 2006 | Expired or cancelled cancelled Nov 2007 | 1063 Market St | change of use. change of occupancy. non structural interior remodel for take out restaurant, provide 2 handicap toilets.Details
change of use. change of occupancy. non structural interior remodel for take out restaurant, provide 2 handicap toilets. | $150,000 | |
| Feb 14, 2006 | Completed final sign-off Jun 2006 | 64 Sunview Dr | Nakai Construction | revision to appl#200602063870 submit drawing for scope of work-kitchen remodel:repalce cabinet,countertop.bathroom remodel:replace bath tub, toilet bowl,vanity,shower pan,tile,replace all sheetrock,replace 10 windows,no change opening size.replace 2 garage doors.install insulation wall & ceiling &Details
revision to appl#200602063870 submit drawing for scope of work-kitchen remodel:repalce cabinet,countertop.bathroom remodel:replace bath tub, toilet bowl,vanity,shower pan,tile,replace all sheetrock,replace 10 windows,no change opening size.replace 2 garage doors.install insulation wall & ceiling & | |
| Nov 28, 2005 | Completed final sign-off Mar 2006 | 148 Park St | Nakai Construction | revision to 200506296401:remove rear sunroom and omit masterbed room closetDetails
revision to 200506296401:remove rear sunroom and omit masterbed room closet |