Frank Rollo
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Rollo & Ridley Geotechnical
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Oct 2022
8 permits since 2000 (engineer on 6 permits, architect on 1 permit, authorized agent-others on 1 permit): 4 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 25, 2022 | In progress issued May 2025 | 2915 Vallejo St | erect a 6-story(4 stories type 5b over 2-stories type 1a) w/o basement, 2 family dwellings per sb9.Details
erect a 6-story(4 stories type 5b over 2-stories type 1a) w/o basement, 2 family dwellings per sb9. | $10,000,000 | |
| Oct 25, 2022 | In progress issued May 2025 | 2915 Vallejo St | demolish a 3-story with basement, type 5b, single family building.Details
demolish a 3-story with basement, type 5b, single family building. | $60,000 | |
| Jul 11, 2022 | Completed final sign-off Apr 2026 | 2780 Broadway | Matarozzi/Pelsinger Builders Inc. | interior remodel,minor horizontal addition, and exterior elevations alterations to and existing 4 story,over basement single family residence.Details
interior remodel,minor horizontal addition, and exterior elevations alterations to and existing 4 story,over basement single family residence. | $2,000,000 |
| Sep 8, 2020 | Completed final sign-off Feb 2025 | 2765 Vallejo St | Ggd Inc. | below-grade horizontal addition at rear of building to expand garage level and first floor. no visible changes to facade from street. interior remodel at all floors with relocation of stair and (n) passenger elevator. (n) nfpa 13 fire sprinkler system under separate permit. maher applicable.Details
below-grade horizontal addition at rear of building to expand garage level and first floor. no visible changes to facade from street. interior remodel at all floors with relocation of stair and (n) passenger elevator. (n) nfpa 13 fire sprinkler system under separate permit. maher applicable. | $1,600,000 |
| Jan 28, 2016 | Never finaled issued Jul 2018, no final | 157 24th Av | alter site permit, revision to permit 2006-01-26-3118. remove roof, some walls, raise foundation, tuck new garage under & create vertical additon. this revision is a reduction in sq footage & mass.Details
alter site permit, revision to permit 2006-01-26-3118. remove roof, some walls, raise foundation, tuck new garage under & create vertical additon. this revision is a reduction in sq footage & mass. | ||
| Feb 20, 2015 | Completed final sign-off Dec 2016 | 1960 Jones St | Capomastro Group:Acalifornia Corp. | shoring. ref pa# 201404012176 s1.Details
shoring. ref pa# 201404012176 s1. | $10,000 |
| May 14, 2013 | Completed final sign-off Dec 2016 | 201 Folsom St | Drill Tech Drilling & Shoring Inc | temporary shoring & excavation for 201 folsom street.Details
temporary shoring & excavation for 201 folsom street. | $4,800,000 |
| Nov 1, 2001 | Expired or cancelled expired Jan 2003 | 5300 Mission St | change of use from store/restaurant to full restaurant, lower countertop, change door hardwareDetails
change of use from store/restaurant to full restaurant, lower countertop, change door hardware | $300 |