Francis Malkham
- Listed as
- engineer
- Firm
- Design Everest Consulting
- Based in
- Mountain View
- On San Francisco permits
- Mar 2019 to Jul 2024
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2024 | Completed final sign-off Jun 2026 | 722 17th Av | Ray Foundation Construction Inc | remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater.Details
remodel area on the 1st fl. add 2 bedrooms, 1 family room, redo flooring. change 2nd floor floor plan. upgrade electrical meters fr0m 100 a to 200. redesign the floor plan w/ new roof plan, plumbing, lightings, hvac and water heater. | $290,000 |
| Jul 1, 2024 | Expired or cancelled expired Oct 2025 | 815 Joost Av | revision to pa# 2023-1018-8924 new concrete slab at lower fl. new double walls at the lower fl bedroom. change ceiling height to 8ft at lower floor. keep two existing windows at west wall on 2nd floor plan.Details
revision to pa# 2023-1018-8924 new concrete slab at lower fl. new double walls at the lower fl bedroom. change ceiling height to 8ft at lower floor. keep two existing windows at west wall on 2nd floor plan. | $100,000 | |
| Oct 18, 2023 | Completed final sign-off Nov 2025 | 815 Joost Av | Tech Line Construction Inc | re-plan layout of 1st & the lower fl. add total of (2) bedrm & (2) baths. add (n) family rm, (n) office lower fl. redesign illegal space lower fl to comply w/ regulations & increase living area. provide elec (n) equip, update elec meter from 100a to 200a. (n) plumb, ligthing, water heater, elecDetails
re-plan layout of 1st & the lower fl. add total of (2) bedrm & (2) baths. add (n) family rm, (n) office lower fl. redesign illegal space lower fl to comply w/ regulations & increase living area. provide elec (n) equip, update elec meter from 100a to 200a. (n) plumb, ligthing, water heater, elec | $250,000 |
| Oct 17, 2023 | In progress issued Jan 2025 | 2380 Franklin St | Y & K Inc, Team Metric Construction Corporation | legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec.Details
legalize 2nd unit at ground floor to jadu. add 2nd parking in (e) basement & reinforce foundation. add bedroom to 4th floor. add an elevator,doors & windows in the basement & 1st fl on th west elevation. new color for exterior,provide plu & elec. | $900,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2024 | 161 Delano Av | A2z Remodeling Inc. | condition basement space, w/a tall ceiling into liveable space2 bedrooms, shearlwall retrofit for basement; relocate laundry, 2 exterior doors, tiny addition for the staircase expansion, ac furnace - new; pg&e panel relocate to the outside flip at the same locationDetails
condition basement space, w/a tall ceiling into liveable space2 bedrooms, shearlwall retrofit for basement; relocate laundry, 2 exterior doors, tiny addition for the staircase expansion, ac furnace - new; pg&e panel relocate to the outside flip at the same location | $70,000 |
| Mar 12, 2019 | Completed final sign-off Aug 2019 | 1419 Palou Av | two 8'x8' dormers on roof per planning code with structural improvements to frame of house.Details
two 8'x8' dormers on roof per planning code with structural improvements to frame of house. | $35,000 |