Fortunato Gonzalez
- Listed as
- authorized agent-others, contractor, subcontractor
- Firm
- Sf Gonzalez Concrete Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Dec 2023
36 permits since 2000 (contractor on 35 permits, authorized agent-others on 1 permit, subcontractor on 1 permit): 12 completed, 2 in progress, 12 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 22, 2023 | In progress filed Dec 2023, not yet issued | 1582 Noe St | Sf Gonzalez Concrete Inc. | work within the front setback: replace concrete driveway (extends 3 ft into sidewalk area/r.o.w), remove concrete and add new concrete walls and planting areas.Details
work within the front setback: replace concrete driveway (extends 3 ft into sidewalk area/r.o.w), remove concrete and add new concrete walls and planting areas. | $18,500 |
| Oct 11, 2023 | Completed final sign-off Oct 2023 | 2150 Taraval St | Sf Gonzalez Concrete Inc. | revision to pa# 202207128281. to document public works dac reviewer (edward liu) requirement to provide level landing at entrance and to remove the power door operators from the scope.Details
revision to pa# 202207128281. to document public works dac reviewer (edward liu) requirement to provide level landing at entrance and to remove the power door operators from the scope. | |
| Jan 26, 2023 | Completed final sign-off Apr 2023 | 333 Winfield St | Sf Gonzalez Concrete Inc. | replace (e) concrete garage floor. no excavation.Details
replace (e) concrete garage floor. no excavation. | $10,000 |
| Jul 15, 2022 | Completed final sign-off Dec 2022 | 1690 38th Av | Sf Gonzalez Concrete Inc. | one new curb cut at moraga street.Details
one new curb cut at moraga street. | $8,500 |
| Jul 14, 2022 | In progress issued Apr 2024 | 225 Edgehill Wy | At6 Design Build | new exterior rear decks @ 1st & 2nd floor. replace 1 window @ 1st floor with door for access to new deck.Details
new exterior rear decks @ 1st & 2nd floor. replace 1 window @ 1st floor with door for access to new deck. | $80,000 |
| Jul 12, 2022 | Completed final sign-off Oct 2023 | 2150 Taraval St | Sf Gonzalez Concrete Inc. | to comply with abe# 201812143003. replace power door operator & actuators with one that facing sidewalk. redesign parking lot to include accessible van space. provide path of travel from accessible stall to entrance including regarding sidewalk, parking lot to recessed entrance. reduce curbcut.Details
to comply with abe# 201812143003. replace power door operator & actuators with one that facing sidewalk. redesign parking lot to include accessible van space. provide path of travel from accessible stall to entrance including regarding sidewalk, parking lot to recessed entrance. reduce curbcut. | $178,000 |
| Sep 10, 2021 | Never finaled issued Oct 2021, no final | 2362 Vallejo St | Sf Gonzalez Concrete Inc. | responce to nov# 201777411; rebuild retaining wall and future fence on property line at rearDetails
responce to nov# 201777411; rebuild retaining wall and future fence on property line at rear | $5,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Sf Gonzalez Concrete Inc. | structural work to permit #201809271660 for cost, see prior permit @ $90,000. no exteroir work under this permit. including minor plan changes, energy sheets & electrical plan.Details
structural work to permit #201809271660 for cost, see prior permit @ $90,000. no exteroir work under this permit. including minor plan changes, energy sheets & electrical plan. | $25,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 1707 Hayes St | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| May 21, 2019 | Never finaled issued May 2019, no final | 20 Lunado Wy | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| May 21, 2019 | Never finaled issued May 2019, no final | 1740 Sanchez St | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| May 21, 2019 | Never finaled issued May 2019, no final | 800 Corbett Av | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| Mar 14, 2018 | Expired or cancelled expired Oct 2025 | 627 Vallejo St | Sf Gonzalez Concrete Inc. | sidewalk repair over (e) basementDetails
sidewalk repair over (e) basement | $10,000 |
| Mar 14, 2018 | Expired or cancelled expired Mar 2026 | 2251 Chestnut St | Sf Gonzalez Concrete Inc. | sidewalk repair over (e) basementDetails
sidewalk repair over (e) basement | $10,000 |
| Oct 13, 2016 | Never finaled issued Oct 2016, no final | 2869 Union St | Sf Gonzalez Concrete Inc. | street space & sidewalkDetails
street space & sidewalk | |
| Apr 22, 2016 | Never finaled issued Oct 2016, no final | 450 Mission St | Sf Gonzalez Concrete Inc. | repair structural slab and supporting beam in a select area of the 1st floor due to corrosion of the reinforcing steel. n/a for maher.Details
repair structural slab and supporting beam in a select area of the 1st floor due to corrosion of the reinforcing steel. n/a for maher. | $6,000 |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 408 Elizabeth St | Sf Gonzalez Concrete Inc. | stret spaceDetails
stret space | |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 1311 Guerrero St | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 784 Stanyan St | Sf Gonzalez Concrete Inc. | street spaceDetails
street space | |
| May 16, 2013 | Completed final sign-off Jul 2013 | 2211 25th St | Sf Gonzalez Concrete Inc. | curb cut - per dpw standards 10" wide maxDetails
curb cut - per dpw standards 10" wide max | $4,650 |
| May 3, 2013 | Completed final sign-off Sep 2013 | 3166 16th St | Sf Gonzalez Concrete Inc. | basement level-repaier water leaking, install new retaining wall, replace 1st floor joists. no ada upgrades per ab-17Details
basement level-repaier water leaking, install new retaining wall, replace 1st floor joists. no ada upgrades per ab-17 | $50,000 |
| Mar 7, 2013 | Completed final sign-off Mar 2013 | 643 Natoma St | Sf Gonzalez Concrete Inc. | to obtain final inspection for work approved under pa#2011-08-12-2385. all work is complete.Details
to obtain final inspection for work approved under pa#2011-08-12-2385. all work is complete. | |
| Jun 5, 2012 | Never finaled issued Jul 2012, no final | 2450 Sutter St | Sf Gonzalez Concrete Inc. | replace topping slab at sidewalk. no structural work. waterproof & replace topping slab.Details
replace topping slab at sidewalk. no structural work. waterproof & replace topping slab. | $5,000 |
| May 15, 2012 | Completed final sign-off Jun 2012 | 1977 Silver Av | Sf Gonzalez Concrete Inc. | replace damaged walls @ left and right side of main entrance to house, repair in kind, vehicle damage @ entry pony wall.Details
replace damaged walls @ left and right side of main entrance to house, repair in kind, vehicle damage @ entry pony wall. | $4,000 |
| Aug 12, 2011 | Never finaled issued Aug 2011, no final | 643 Natoma St | Sf Gonzalez Concrete Inc. | new curb cut according to city standard specifications according to attached drawings.Details
new curb cut according to city standard specifications according to attached drawings. | $3,600 |
| Jun 10, 2010 | Completed final sign-off Sep 2010 | 538 Chenery St | Sf Gonzalez Concrete Inc. | repair 50% of front stairs.Details
repair 50% of front stairs. | $4,500 |
| May 25, 2007 | Expired or cancelled expired Oct 2008 | 637 Jackson St | Sf Gonzalez Concrete Inc. | renew pa#200509062122 for final inspection.Details
renew pa#200509062122 for final inspection. | |
| Apr 19, 2007 | Completed final sign-off Nov 2007 | 1260 California St | Sf Gonzalez Concrete Inc. | temporary vertical shoring for (e) building framming as shown on drawings.Details
temporary vertical shoring for (e) building framming as shown on drawings. | $20,000 |
| Feb 9, 2006 | Expired or cancelled expired Jan 2009 | 454 Collingwood St | Sf Gonzalez Concrete Inc. | remove & replace (e) retaining wall as shown on drawings. replace (e) concrete paving @ driveway.Details
remove & replace (e) retaining wall as shown on drawings. replace (e) concrete paving @ driveway. | $7,000 |
| Sep 22, 2005 | Expired or cancelled expired May 2007 | 1650 Octavia St | Sf Gonzalez Concrete Inc. | remove and replace concrete floor at courtyard 3000 sq ft flat work due to cracks/slope to drainDetails
remove and replace concrete floor at courtyard 3000 sq ft flat work due to cracks/slope to drain | $74,000 |
| Aug 24, 2005 | Completed final sign-off Sep 2005 | 1457 Masonic Av | Sf Gonzalez Concrete Inc. | raplace dryrot w/new pressure treated plywood @ side entrance to house area 6'x7'/replace 2 (e) flr.Details
raplace dryrot w/new pressure treated plywood @ side entrance to house area 6'x7'/replace 2 (e) flr. | $2,500 |
| Jan 21, 2004 | Expired or cancelled expired May 2006 | 277 London St | Sf Gonzalez Concrete Inc. | replacement: retaining wall and stairsDetails
replacement: retaining wall and stairs | $18,000 |
| Feb 22, 2002 | Expired or cancelled expired Aug 2002 | 187 Beaver St | Sf Gonzalez Concrete Inc. | replace (e) retaining wallDetails
replace (e) retaining wall | $7,000 |
| Aug 30, 2001 | Expired or cancelled expired Aug 2003 | 2873 23rd St | Sf Gonzalez Concrete Inc. | repl (e)floor beam(s)due to dry rotDetails
repl (e)floor beam(s)due to dry rot | $1,100 |
| Aug 4, 2001 | Expired or cancelled expired Feb 2002 | 2873 23rd St | Sf Gonzalez Concrete Inc. | remove and repl foundationDetails
remove and repl foundation | $18,000 |
| Oct 20, 2000 | Expired or cancelled expired Apr 2001 | 436 Capistrano Av | Sf Gonzalez Concrete Inc. | repair front,ext concrete existing stairway,water profing,remove concrete topping,Details
repair front,ext concrete existing stairway,water profing,remove concrete topping, | $6,700 |