Feng Chen
- Listed as
- contractor, designer, pmt consultant/expediter
- Firm
- F C Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Jul 2026
111 permits since 2000 (contractor on 110 permits, designer on 5 permits, pmt consultant/expediter on 1 permit): 68 completed, 23 in progress, 11 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 111.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 392 Marietta Dr | F C Company | remodel 2 bathrooms in kind. no changes to layout and size.Details
remodel 2 bathrooms in kind. no changes to layout and size. | $40,000 |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 2735 Clay St | F C Company | permit to be in compliance with complaint #202653854 adding a new washer and dryer, renovation of an existing full bathroom, no reloction to existing exituresDetails
permit to be in compliance with complaint #202653854 adding a new washer and dryer, renovation of an existing full bathroom, no reloction to existing exitures | $5,000 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 27 Ceres St | F C Company | comply with complaint #202547103. remove unpermitted horizontal addition, add back the original garage door, replace the front steel stair back to wooden stair, lower the steel fence to 6 feet.Details
comply with complaint #202547103. remove unpermitted horizontal addition, add back the original garage door, replace the front steel stair back to wooden stair, lower the steel fence to 6 feet. | $8,000 |
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 422 32nd Av | F C Company | replace existing steel decking in kind, less than 50% repairs, back deck non street facing. approximately 45 sf.Details
replace existing steel decking in kind, less than 50% repairs, back deck non street facing. approximately 45 sf. | $5,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 2259 41st Av | F C Company | remodel bathroom in ground floor, update plumbing and electrical as needed; new toilet, vanity, tiles; replace furnace in garage.Details
remodel bathroom in ground floor, update plumbing and electrical as needed; new toilet, vanity, tiles; replace furnace in garage. | $30,000 |
| May 5, 2026 | In progress filed May 2026, not yet issued | 149 Goethe St | F C Company | add new retaining wall between 145 st & 149 goethe st. ref pa 202603167611 (145 goethe)Details
add new retaining wall between 145 st & 149 goethe st. ref pa 202603167611 (145 goethe) | $2,000 |
| Mar 16, 2026 | In progress filed Mar 2026, not yet issued | 145 Goethe St | F C Company | demo existing retaining wall & cmu fence, add a new permeable & grid apvers ramp for access from street, add new retaining wall between 145 & 149 goethe st.Details
demo existing retaining wall & cmu fence, add a new permeable & grid apvers ramp for access from street, add new retaining wall between 145 & 149 goethe st. | $4,000 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 714 Church St | F C Company | kitchen remodel in kind. no changes in layout. redo flooringDetails
kitchen remodel in kind. no changes in layout. redo flooring | $25,000 |
| Feb 19, 2026 | Completed final sign-off Mar 2026 | 749 Portola Dr | F C Company | to obtain final inspection for work approved under pa# 202501168456. all work is complete.Details
to obtain final inspection for work approved under pa# 202501168456. all work is complete. | |
| Feb 15, 2026 | In progress filed Feb 2026, not yet issued | 579 05th Av | F C Company | comply w/nov 202538644 & 202542838, rebuild 3-flrs fire damaged bldg (unit 579 & 579a). unit 579: add new bathroom & family room @ 1/f, replace 2-fixture bath w/ 3-fixture @ 1/f, add wetbar @ 1/f, replace tub w/shower @ 2/f. unit 579a: ext kitchen/living/dining to bdrm #3, replace tub w/shower @ 3/fDetails
comply w/nov 202538644 & 202542838, rebuild 3-flrs fire damaged bldg (unit 579 & 579a). unit 579: add new bathroom & family room @ 1/f, replace 2-fixture bath w/ 3-fixture @ 1/f, add wetbar @ 1/f, replace tub w/shower @ 2/f. unit 579a: ext kitchen/living/dining to bdrm #3, replace tub w/shower @ 3/f | $168,000 |
| Dec 31, 2025 | In progress filed Dec 2025, not yet issued | 27 Ceres St | F C Company | comply w/ nov 202547103, 202547105, & 202545833. remove unpermitted walls on ground/f. reduced unpermitted storage shed to 120 sf. reduce unpermitted fence height at front yardDetails
comply w/ nov 202547103, 202547105, & 202545833. remove unpermitted walls on ground/f. reduced unpermitted storage shed to 120 sf. reduce unpermitted fence height at front yard | $8,000 |
| Dec 18, 2025 | In progress issued May 2026 | 3250 Folsom St | F C Company | lv1: infill within existing footprint and into garage to add primary suite, stair access from foyer. lv2: update bathroom/kitchen; reconfigure stair for code compliance.lv3: convert unoccupied attic to a story, add bedroom and bathroom. whole house reroof, replace windows, structural upgrades mepDetails
lv1: infill within existing footprint and into garage to add primary suite, stair access from foyer. lv2: update bathroom/kitchen; reconfigure stair for code compliance.lv3: convert unoccupied attic to a story, add bedroom and bathroom. whole house reroof, replace windows, structural upgrades mep | $522,000 |
| Dec 12, 2025 | In progress issued May 2026 | 81 San Felipe Av | F C Company | construct a new deck with stairs in south side yard. not attaching to existing building.Details
construct a new deck with stairs in south side yard. not attaching to existing building. | $10,000 |
| Oct 30, 2025 | In progress issued Oct 2025 | 2714 Diamond St | F C Company | demo drywall at water damage area at bedroom replace drywall in kind. all work interior.Details
demo drywall at water damage area at bedroom replace drywall in kind. all work interior. | $2,000 |
| Sep 18, 2025 | Completed final sign-off Oct 2025 | 200 Olmstead St | F C Company | replace 2 front windows and 1 side window vinly. all windows to be replaced in kind in existing openings,Details
replace 2 front windows and 1 side window vinly. all windows to be replaced in kind in existing openings, | $3,000 |
| Sep 10, 2025 | In progress issued Sep 2025 | 579 05th Av | F C Company | comply w/nov 202538644, demo all fire damaged building assemblies included structural & non-structural components of floors, walls, roof system, protect & stabilize all salvageaable elements for furture reconstructionDetails
comply w/nov 202538644, demo all fire damaged building assemblies included structural & non-structural components of floors, walls, roof system, protect & stabilize all salvageaable elements for furture reconstruction | $5,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 850 Clement St | F C Company | replace total of 15 vinyl windows, all are street facing.Details
replace total of 15 vinyl windows, all are street facing. | $10,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 579 05th Av | F C Company | remove debris and abatement within the perimeter of the house to partially comply with nov 202538644 excluding structural upon evaluation and with plansDetails
remove debris and abatement within the perimeter of the house to partially comply with nov 202538644 excluding structural upon evaluation and with plans | $9,000 |
| Jul 18, 2025 | In progress issued Jul 2025 | 2131 28th Av | F C Company | 2nd flr kitchen & bathroom like to like remodel. convert ground flr storage space into living space(687 sqft):add one family room, one bedroom, one full bath and one half bath. relocate furnace, replace tank water heater to tankless water heater.Details
2nd flr kitchen & bathroom like to like remodel. convert ground flr storage space into living space(687 sqft):add one family room, one bedroom, one full bath and one half bath. relocate furnace, replace tank water heater to tankless water heater. | $127,000 |
| Jul 18, 2025 | In progress issued Sep 2025 | 2339 39th Av | F C Company | rear deck and stair. replace two windows at front elevation. replace two rear windows with doors.Details
rear deck and stair. replace two windows at front elevation. replace two rear windows with doors. | $25,000 |
| May 28, 2025 | Completed final sign-off Jun 2025 | 1539 39th Av | F C Company | replace 1 rear window with vinyl window, same size. (not street visible).Details
replace 1 rear window with vinyl window, same size. (not street visible). | $1,500 |
| May 28, 2025 | Completed final sign-off Sep 2025 | 582 22nd Av | F C Company | remodel 1 bathroom and kitchen on second fl in kind. no moving walls. bathroom approx. 40 sq ft. kitchen approx 96 sq ft.Details
remodel 1 bathroom and kitchen on second fl in kind. no moving walls. bathroom approx. 40 sq ft. kitchen approx 96 sq ft. | $40,000 |
| May 21, 2025 | Completed final sign-off Oct 2025 | 551 Taylor St | F C Company | replace front glass in kind. (front visible from street). u-factor <=0.58Details
replace front glass in kind. (front visible from street). u-factor <=0.58 | $2,000 |
| May 21, 2025 | In progress issued Jan 2026 | 1287 42nd Av | F C Company | demo (e) rear yard deck and expand 1st & 2nd flr to buildable line; relocate (e) kitchen/dining/family room 2nd fl to 1st fl. make a master bedroom after relocation. add a bedroom to 2nd fl and change (e) living to bedroom. alter (e) stairs. 1st &2nd flr. bath remodel. relocate laundry to 2nd floor.Details
demo (e) rear yard deck and expand 1st & 2nd flr to buildable line; relocate (e) kitchen/dining/family room 2nd fl to 1st fl. make a master bedroom after relocation. add a bedroom to 2nd fl and change (e) living to bedroom. alter (e) stairs. 1st &2nd flr. bath remodel. relocate laundry to 2nd floor. | $100,000 |
| May 14, 2025 | Completed final sign-off Nov 2025 | 986 Guerrero St | F C Company | replace front stair treads & risers landing in kind. no alteration to layout & structural work. may replace dryout as needed 50% lessDetails
replace front stair treads & risers landing in kind. no alteration to layout & structural work. may replace dryout as needed 50% less | $2,000 |
| Apr 16, 2025 | In progress issued May 2025 | 2339 39th Av | F C Company | 1st fl: add office, bedroom and bathroom. enclose entryway 2nd fl: remodel (e) kitchen and remove dividing wall btwn dining and kitchen. remodel two existing bathrooms. replace doors and windows at rear wall. refinish flooringDetails
1st fl: add office, bedroom and bathroom. enclose entryway 2nd fl: remodel (e) kitchen and remove dividing wall btwn dining and kitchen. remodel two existing bathrooms. replace doors and windows at rear wall. refinish flooring | $200,000 |
| Apr 9, 2025 | Completed final sign-off Jul 2025 | 371 Wawona St | F C Company | 2/fl- add (n) casework to (e) ktichen, demo freestanding bathtub and relocate vanity sink. infill wall opening between dining and foyer.Details
2/fl- add (n) casework to (e) ktichen, demo freestanding bathtub and relocate vanity sink. infill wall opening between dining and foyer. | $50,000 |
| Apr 3, 2025 | Completed final sign-off Jul 2025 | 1360 09th Av | F C Company | replace existing counter, cabinets and plumbing fixtures in kind replace flooring add resessed lights and paint office space no alteration to emp and layoutDetails
replace existing counter, cabinets and plumbing fixtures in kind replace flooring add resessed lights and paint office space no alteration to emp and layout | $18,000 |
| Mar 24, 2025 | Completed final sign-off Aug 2026 | 1851 40th Av | F C Company | remodel 1st and 2nd floors. addition of 299 sf at first floor within (e) envelope. (n) bedroom,bathroom, and laundry room. install (n) sliding glass door and windows at rear facade. install (n) siding at rear facade. upgrade main panel and remove interior (e) fireplaceDetails
remodel 1st and 2nd floors. addition of 299 sf at first floor within (e) envelope. (n) bedroom,bathroom, and laundry room. install (n) sliding glass door and windows at rear facade. install (n) siding at rear facade. upgrade main panel and remove interior (e) fireplace | $180,000 |
| Mar 20, 2025 | Completed final sign-off Jul 2025 | 5041 Geary Bl | F C Company | propose to stranghten the existing front entrance corner entrance door approved under pa 202312223018Details
propose to stranghten the existing front entrance corner entrance door approved under pa 202312223018 | $1,000 |
| Feb 27, 2025 | Completed final sign-off May 2025 | 1955 42nd Av | F C Company | remodel kitchen and bathroom on 2nd floor in kind. no alteration to (e) layout. reuse (e) plumbing and electrical circuit.Details
remodel kitchen and bathroom on 2nd floor in kind. no alteration to (e) layout. reuse (e) plumbing and electrical circuit. | $15,000 |
| Feb 27, 2025 | Completed final sign-off May 2025 | 231 Oxford St | Shao Fat Construction Inc | to comply w/nov 202298456 to remove front window on ground/f. to remove range & hood on ground/f.Details
to comply w/nov 202298456 to remove front window on ground/f. to remove range & hood on ground/f. | $1,500 |
| Feb 21, 2025 | In progress issued Mar 2025 | 81 San Felipe Av | F C Company | revision to pa 202210144440- remove fireplace in 2 floors. add walls around elevator shaft in 4 floors. change size of 11 windows. infill 7 windows. change 1 sliding door to 1 window. correction of (e) basement fl plan. add a wall with doors to separate yoga room & media room. add ventilationDetails
revision to pa 202210144440- remove fireplace in 2 floors. add walls around elevator shaft in 4 floors. change size of 11 windows. infill 7 windows. change 1 sliding door to 1 window. correction of (e) basement fl plan. add a wall with doors to separate yoga room & media room. add ventilation | $30,000 |
| Jan 16, 2025 | Expired or cancelled expired Mar 2026 | 749 Portola Dr | F C Company | to comply with nov# 22432152: car drove into building repair the damage in-kind repair/replace front exterior wall, store front planter, patch broken meter pipe under bar counters, install power assisted door operatorDetails
to comply with nov# 22432152: car drove into building repair the damage in-kind repair/replace front exterior wall, store front planter, patch broken meter pipe under bar counters, install power assisted door operator | $35,000 |
| Jan 14, 2025 | In progress issued Mar 2025 | 1707 40th Av | F C Company | on ground level: add one family room and one full bath. on 2nd floor: kitchen remodel and bath room remodel. upgrade electrical main to 200 amp.Details
on ground level: add one family room and one full bath. on 2nd floor: kitchen remodel and bath room remodel. upgrade electrical main to 200 amp. | $95,000 |
| Nov 4, 2024 | In progress issued Jan 2025 | 448 Judson Av | F C Company | resolve nov case from previous owner: 202177415; demolish unpermitted works at basement. kitchen remodel, remove non-load bearing wall. add new bathroom and existing bathroom remodel. electrical rewire for kitchen/bathrooms per current electrical code.Details
resolve nov case from previous owner: 202177415; demolish unpermitted works at basement. kitchen remodel, remove non-load bearing wall. add new bathroom and existing bathroom remodel. electrical rewire for kitchen/bathrooms per current electrical code. | $60,000 |
| Oct 24, 2024 | Completed final sign-off Oct 2024 | 866 25th Av | F C Company | replace 8 front windows in kind- wood/ aluminum clad. same size, same location u.30 maxDetails
replace 8 front windows in kind- wood/ aluminum clad. same size, same location u.30 max | $4,000 |
| Aug 22, 2024 | Completed final sign-off Dec 2025 | 1539 39th Av | F C Company | 1/f: interior remodel - add a bedroom, a media room, relocate bathroom and family room.Details
1/f: interior remodel - add a bedroom, a media room, relocate bathroom and family room. | $80,000 |
| May 21, 2024 | Completed final sign-off Dec 2024 | 659 02nd Av | F C Company | kitchen remodel (inkind) finishing only. remodel 2 bathrooms (inkind), finishing only, install new flooring. paint exterior walls. repair drywall for electrical work. no alteration to layout and framing in kind remodelDetails
kitchen remodel (inkind) finishing only. remodel 2 bathrooms (inkind), finishing only, install new flooring. paint exterior walls. repair drywall for electrical work. no alteration to layout and framing in kind remodel | $70,000 |
| Mar 5, 2024 | Completed final sign-off Jul 2024 | 272 Arlington St | F C Company | rev to pa# 2023-0901-5848; remove one post in garage, add a wall, a door and a storage shelf to (p) storage, relocate (e) furnace and (e) water heater to crawl spaceDetails
rev to pa# 2023-0901-5848; remove one post in garage, add a wall, a door and a storage shelf to (p) storage, relocate (e) furnace and (e) water heater to crawl space | $2,000 |
| Feb 26, 2024 | Completed final sign-off Jul 2024 | 1466 31st Av | F C Company | replace 5 front wnidows wood clad/aluminums, single casement style in existing openings.Details
replace 5 front wnidows wood clad/aluminums, single casement style in existing openings. | $3,000 |
| Feb 8, 2024 | In progress filed Feb 2024, not yet issued | 850 Clement St | F C Company | replace 14 front facing windows in kind- aluminum wood cladDetails
replace 14 front facing windows in kind- aluminum wood clad | $5,000 |
| Jan 3, 2024 | In progress issued Mar 2025 | 1 Gennessee St | F C Company | horizontal addition at rear- add two bedrooms, two baths and family room, deck and spriral stairs to grade.Details
horizontal addition at rear- add two bedrooms, two baths and family room, deck and spriral stairs to grade. | $350,000 |
| Dec 22, 2023 | Completed final sign-off Mar 2024 | 300 03rd St | F C Company | unit # 711: (1) kitchen remodel, (1) bathroom remodel, finish remodel, replace trim and new light fixturesDetails
unit # 711: (1) kitchen remodel, (1) bathroom remodel, finish remodel, replace trim and new light fixtures | $2,000 |
| Nov 21, 2023 | Completed final sign-off Sep 2025 | 2347 39th Av | F C Company | develop gr/f rooms for a guest bedroom, family rm, full bath and laundry room, remove e utility stairs btw flrs, remodel kitchen on 2/f: open wall add beam, remodel 2 e baths on 2/f, create a masterbedrm ensuite, insulate throughout where accessible. general mep upgrades.Details
develop gr/f rooms for a guest bedroom, family rm, full bath and laundry room, remove e utility stairs btw flrs, remodel kitchen on 2/f: open wall add beam, remodel 2 e baths on 2/f, create a masterbedrm ensuite, insulate throughout where accessible. general mep upgrades. | $165,992 |
| Oct 30, 2023 | In progress issued Sep 2024 | 201 Christopher Dr | F C Company | interior layout change on the 1/f and 2/f, upstairs changes include kitchen remodel and removal of wall and installing skylights, downstairs remodel will include bedroom, bathroom, walk-in closet, entry way, laundry area and bonus area, the central heating system and water heater will be replaceDetails
interior layout change on the 1/f and 2/f, upstairs changes include kitchen remodel and removal of wall and installing skylights, downstairs remodel will include bedroom, bathroom, walk-in closet, entry way, laundry area and bonus area, the central heating system and water heater will be replace | $100,000 |
| Sep 25, 2023 | Never finaled issued Sep 2023, no final | 72 Tucker Av | F C Company | revision to pa 2023-0421-6218 by adding storage to garage; proposed (n) bath from 60 sf to 43 sfDetails
revision to pa 2023-0421-6218 by adding storage to garage; proposed (n) bath from 60 sf to 43 sf | $800 |
| Sep 1, 2023 | Completed final sign-off Jul 2024 | 272 Arlington St | F C Company | reduce existing mezzanine area in existing garage for larger parking, lower existing mezzanine level to creat a workshop, lower side yard grade for new mezzanine access.Details
reduce existing mezzanine area in existing garage for larger parking, lower existing mezzanine level to creat a workshop, lower side yard grade for new mezzanine access. | $70,000 |
| Jun 16, 2023 | Completed final sign-off Sep 2023 | 5015 Diamond Heights Bl | F C Company | replacement of e concrete driveway and replace supporting framingDetails
replacement of e concrete driveway and replace supporting framing | $5,000 |
| May 30, 2023 | Never finaled issued Aug 2023, no final | 294 Hale St | F C Company | 1/f: add a bedroom & bathroom. add interior stairwell connecting to 2/f. 2/f: (e) bath resurface including relocate one window. remove walls per plan and remodel living room. switch (e) kitchen with dining room.Details
1/f: add a bedroom & bathroom. add interior stairwell connecting to 2/f. 2/f: (e) bath resurface including relocate one window. remove walls per plan and remodel living room. switch (e) kitchen with dining room. | $80,000 |
| May 25, 2023 | Completed final sign-off Dec 2024 | 72 Tucker Av | F C Company | add a deck in rear yard extending from 2/f connecting to groundDetails
add a deck in rear yard extending from 2/f connecting to ground | $5,000 |
| May 15, 2023 | Completed final sign-off Jul 2023 | 1359 32nd Av | F C Company | bathroom remodel on 2nd floor. finish remodel only. no alteration to emp no layout change. no structural work. no wall/framing modifications.Details
bathroom remodel on 2nd floor. finish remodel only. no alteration to emp no layout change. no structural work. no wall/framing modifications. | $5,000 |
| Apr 21, 2023 | Never finaled issued Sep 2023, no final | 72 Tucker Av | F C Company | add a bedroom with a 3 fixture bath to g/f. add a 3 fixture bath and a storage to g/f.Details
add a bedroom with a 3 fixture bath to g/f. add a 3 fixture bath and a storage to g/f. | $25,000 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 2446 Fulton St | F C Company | install electrical dryer and electrical washer in the yard on concrete patio.Details
install electrical dryer and electrical washer in the yard on concrete patio. | $1,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1222 Noriega St | F C Company | to comply with accessible business entrance program ord 51-16. install power door. ref abe 201902145299Details
to comply with accessible business entrance program ord 51-16. install power door. ref abe 201902145299 | $3,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 310 Sutter St | F C Company | to comply with accessible business entrance program ord. 51-16. repave walkway. ref abe 202206302040Details
to comply with accessible business entrance program ord. 51-16. repave walkway. ref abe 202206302040 | $3,000 |
| Nov 7, 2022 | Completed final sign-off May 2023 | 15 Stillman St | F C Company | remodel 1 unit lower level (1st fl) relocate and remodel kitchen and living areas open in 20 lin ft. of (e) wall add 2 baths remodel 2 (e) baths, total 4 baths, 2 bedrooms, 1 den, 1 office, 1 laundry closet no additonal area added (e) furnance and water heater in basement upgrad mepDetails
remodel 1 unit lower level (1st fl) relocate and remodel kitchen and living areas open in 20 lin ft. of (e) wall add 2 baths remodel 2 (e) baths, total 4 baths, 2 bedrooms, 1 den, 1 office, 1 laundry closet no additonal area added (e) furnance and water heater in basement upgrad mep | $96,328 |
| Oct 21, 2022 | Completed final sign-off Apr 2023 | 149 Robinhood Dr | F C Company | remodel one kitchen & half bath in kind. finishing remodel only. no alteration to existing rough electrical, plumbing & mechanical work. non structural.Details
remodel one kitchen & half bath in kind. finishing remodel only. no alteration to existing rough electrical, plumbing & mechanical work. non structural. | $20,000 |
| Oct 14, 2022 | Never finaled issued Aug 2023, no final | 81 San Felipe Av | F C Company | 2/f: relocate (e) bathroom & new walkin closet.1/f: relocate & remodel (e) kitchen, bath, bed & dining rooms.reconfig (e) laundry & powder room. basement fl: (n) master bed/bath,reconfig (e) master bed/bath. new powder rm,office, remodel (e) family room, sub-basement floor: convert storage to mediaDetails
2/f: relocate (e) bathroom & new walkin closet.1/f: relocate & remodel (e) kitchen, bath, bed & dining rooms.reconfig (e) laundry & powder room. basement fl: (n) master bed/bath,reconfig (e) master bed/bath. new powder rm,office, remodel (e) family room, sub-basement floor: convert storage to media | $165,000 |
| Oct 4, 2022 | Completed final sign-off Jan 2023 | 850 Clement St | F C Company | retile kitchen 325 sq ft. no change and alteration to plumbing and electrical layout.Details
retile kitchen 325 sq ft. no change and alteration to plumbing and electrical layout. | $3,500 |
| Sep 8, 2022 | Completed final sign-off Jan 2023 | 658 40th Av | F C Company | add two skylights to existing active permit 202203210426 (revision)Details
add two skylights to existing active permit 202203210426 (revision) | $1,000 |
| Jul 29, 2022 | Completed final sign-off Feb 2023 | 1679 29th Av | F C Company | legalize poured concrete in front of property. comply with nov202282808.Details
legalize poured concrete in front of property. comply with nov202282808. | |
| Jul 22, 2022 | Completed final sign-off Mar 2023 | 2166 25th Av | F C Company | replace (2) exterior, street facing windows with marvin signature ultimate windows.Details
replace (2) exterior, street facing windows with marvin signature ultimate windows. | $1,000 |
| Jul 19, 2022 | Expired or cancelled cancelled Jan 2026 | 852 Clement St | F C Company | retile 283 sqft of kitchen flooring. no alteration to layout, plumbing or electrical work.Details
retile 283 sqft of kitchen flooring. no alteration to layout, plumbing or electrical work. | $2,000 |
| Jul 18, 2022 | Completed final sign-off Jan 2023 | 1722 29th Av | F C Company | 2/f: kitchen remodel. r/r (e) kitchen cabs,sink,d/w, stove & add island. install new recess lights.reconfig 1 bath to 2 baths.infill bathroom lightwell.replce front & rear windows in-kind. 1/f: reconfig garage to add 1 b3ed, 1 bathroom, family room.Details
2/f: kitchen remodel. r/r (e) kitchen cabs,sink,d/w, stove & add island. install new recess lights.reconfig 1 bath to 2 baths.infill bathroom lightwell.replce front & rear windows in-kind. 1/f: reconfig garage to add 1 b3ed, 1 bathroom, family room. | $120,000 |
| Jun 23, 2022 | Completed final sign-off Nov 2023 | 1916 Hyde St | F C Company | to comply with abe program per ord 51-16. replace concrete walkway. install power handicap door opener. abe 201812313672Details
to comply with abe program per ord 51-16. replace concrete walkway. install power handicap door opener. abe 201812313672 | $5,000 |
| Jun 23, 2022 | Never finaled issued Nov 2022, no final | 2253 Bay St | F C Company | add new stairs from 1st floor to 2nd floor. change window into new french door leadin gto backyard. remove load bearing wall 1st floor. add w/d, relocate hvac; remove potential udu on gfDetails
add new stairs from 1st floor to 2nd floor. change window into new french door leadin gto backyard. remove load bearing wall 1st floor. add w/d, relocate hvac; remove potential udu on gf | $60,000 |
| May 26, 2022 | Never finaled issued May 2022, no final | 72 Tucker Av | F C Company | demo existing ground floor and bring up to code. remove wall between kitchen and living room. remodel existing bathroom. add a new bathroom. remodel kitchen. update electrical work.Details
demo existing ground floor and bring up to code. remove wall between kitchen and living room. remodel existing bathroom. add a new bathroom. remodel kitchen. update electrical work. | $50,000 |
| Mar 28, 2022 | Completed final sign-off Aug 2022 | 2195 32nd Av | F C Company | remodel 2nd floor bathroom in kind. finish remodel only. no alteration to framing work.Details
remodel 2nd floor bathroom in kind. finish remodel only. no alteration to framing work. | $10,000 |
| Mar 28, 2022 | Completed final sign-off Aug 2022 | 1647 47th Av | F C Company | repair front stair in kind. replace railing and bring up to code.Details
repair front stair in kind. replace railing and bring up to code. | $7,000 |
| Mar 25, 2022 | Completed final sign-off Jun 2022 | 1721 Ulloa St | F C Company | revision under pa #202110150545: relocate wall between garage & media room. water heater change to tankless & ceiling mount furnace at g/f.Details
revision under pa #202110150545: relocate wall between garage & media room. water heater change to tankless & ceiling mount furnace at g/f. | |
| Mar 21, 2022 | Completed final sign-off Jan 2023 | 658 40th Av | F C Company | remodel extg kitchen, remodel extg bathroom. infill skylights as shown on plan.Details
remodel extg kitchen, remodel extg bathroom. infill skylights as shown on plan. | $40,000 |
| Mar 11, 2022 | Completed final sign-off Apr 2022 | 2446 Fulton St | F C Company | replace 400sf of siding in the rear side of the house. east side with hardie plank. all work non-street visible.Details
replace 400sf of siding in the rear side of the house. east side with hardie plank. all work non-street visible. | $10,000 |
| Feb 28, 2022 | Completed final sign-off May 2023 | 2166 25th Av | F C Company | kitchen remodel. remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island, and install recessed lights. convert (e) window to sliding door. add rear deck in master bedroom.Details
kitchen remodel. remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island, and install recessed lights. convert (e) window to sliding door. add rear deck in master bedroom. | $60,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2022 | 279 18th Av | F C Company | remove and replace damage pine sidings with hardie planks. total area of siding on the right rear side 1570 sqft. lightwell siding on left rear side 720 sqft.Details
remove and replace damage pine sidings with hardie planks. total area of siding on the right rear side 1570 sqft. lightwell siding on left rear side 720 sqft. | $30,000 |
| Jan 4, 2022 | Never finaled issued Jan 2022, no final | 1721 Ulloa St | F C Company | revision under pa #202110150545: under-pin existing footing & replace two (e) post w/ new.Details
revision under pa #202110150545: under-pin existing footing & replace two (e) post w/ new. | $30,000 |
| Jan 4, 2022 | Never finaled issued Jan 2022, no final | 31 Loehr St | F C Company | remodel one non structural 2nd fl bathroom in-kind. convert tub to shower.Details
remodel one non structural 2nd fl bathroom in-kind. convert tub to shower. | $15,000 |
| Dec 10, 2021 | Completed final sign-off May 2023 | 2162 Mission St | F C Company | to comply with ada work requirement in front door and sidewalk. level pavering and install auto self closing door.Details
to comply with ada work requirement in front door and sidewalk. level pavering and install auto self closing door. | $2,500 |
| Oct 19, 2021 | Completed final sign-off Jul 2025 | 1290 42nd Av | F C Company | provide new bedroom, family and bathroom @ 1st floor; provide new entrance w/new door, lobby and laundry room @ 1st flooor; remove door @ stair @ 2nd floor; new water heater and new floor heating systemDetails
provide new bedroom, family and bathroom @ 1st floor; provide new entrance w/new door, lobby and laundry room @ 1st flooor; remove door @ stair @ 2nd floor; new water heater and new floor heating system | $73,016 |
| Oct 15, 2021 | Completed final sign-off Jun 2022 | 1721 Ulloa St | F C Company | construct 1 bedroom, 1 full bath, & media room at g/f.Details
construct 1 bedroom, 1 full bath, & media room at g/f. | $72,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 476 Filbert St | F C Company | install new tiles to kitchen 187 sq ft. install new flooring 118 sq ft. paint interior walls.Details
install new tiles to kitchen 187 sq ft. install new flooring 118 sq ft. paint interior walls. | $8,000 |
| Aug 23, 2021 | Completed final sign-off Mar 2023 | 2450 Rivera St | F C Company | infill 2nd fl bath lightwell apprx 7 sf. enlarge e skylight in bath. provide 1 hr f.r. roof and infill, insulate ref 202106152406 int remodelDetails
infill 2nd fl bath lightwell apprx 7 sf. enlarge e skylight in bath. provide 1 hr f.r. roof and infill, insulate ref 202106152406 int remodel | $1,000 |
| Jul 1, 2021 | Completed final sign-off Jul 2022 | 986 Guerrero St | F C Company | widen (e) detached garage door - a historic resourceDetails
widen (e) detached garage door - a historic resource | $8,000 |
| Jun 28, 2021 | Completed final sign-off Jan 2022 | 230 Madrid St | F C Company | replace 150sf of rotten siding board with cedar siding board. repair 100sf stucco. street facing.Details
replace 150sf of rotten siding board with cedar siding board. repair 100sf stucco. street facing. | $5,000 |
| Apr 12, 2021 | Completed final sign-off Aug 2021 | 2574 40th Av | F C Company | new deck in rear yard extending from 2nd fl with a stair to ground. change 2nd fl window to a door opening to the deck.Details
new deck in rear yard extending from 2nd fl with a stair to ground. change 2nd fl window to a door opening to the deck. | $5,000 |
| Apr 12, 2021 | Completed final sign-off Jan 2022 | 1466 31st Av | F C Company | demo (e) game room and bathroom. add 1 master bedroom and a full bath. add 1 bedroom and a half bath. relocate (e) water heater and furnace.Details
demo (e) game room and bathroom. add 1 master bedroom and a full bath. add 1 bedroom and a half bath. relocate (e) water heater and furnace. | $80,000 |
| Nov 13, 2020 | Completed final sign-off Jul 2021 | 2164 Mission St | F C Company | re-tile 660 sf of tile. no layout change, no change of use, no configuration. no alteration of electrical, plumbing, and framing. comply w/ nov 202046991.Details
re-tile 660 sf of tile. no layout change, no change of use, no configuration. no alteration of electrical, plumbing, and framing. comply w/ nov 202046991. | $4,000 |
| Oct 28, 2020 | Completed final sign-off Feb 2021 | 673 Guerrero St | F C Company | add a bath, laundry room, remodel existing bathDetails
add a bath, laundry room, remodel existing bath | $30,000 |
| Oct 16, 2020 | Completed final sign-off Dec 2021 | 1590 33rd Av | F C Company | 2/f: remodel kitchen counter per plans, remove walls between dining, media and living room for open design. add new sliding door & counter in courtyard. add new closet & new bath in (e) bedroom. infill lightwell on 2/f.Details
2/f: remodel kitchen counter per plans, remove walls between dining, media and living room for open design. add new sliding door & counter in courtyard. add new closet & new bath in (e) bedroom. infill lightwell on 2/f. | $30,000 |
| Sep 12, 2020 | Completed final sign-off Mar 2021 | 2571 39th Av | F C Company | build an exterior deck in rear yard extending from 2nd flr with a stair to ground. change 2 2nd flr windows to door opening to deck.Details
build an exterior deck in rear yard extending from 2nd flr with a stair to ground. change 2 2nd flr windows to door opening to deck. | $8,000 |
| May 27, 2020 | Expired or cancelled cancelled Feb 2021 | 1647 47th Av | F C Company | front exterior stair is rotten & unsafe. replace all steps and handrail, in-kind, no changes to any configuration and structural work. all work in-kind, less than 50% repair/replacement.Details
front exterior stair is rotten & unsafe. replace all steps and handrail, in-kind, no changes to any configuration and structural work. all work in-kind, less than 50% repair/replacement. | $8,000 |
| Mar 4, 2020 | Expired or cancelled expired Aug 2023 | 85 Pope St | F C Company | legalize 2nd floor wd deck & partial building envelope which were not shown on 2004 sanborn map. (site permit only)Details
legalize 2nd floor wd deck & partial building envelope which were not shown on 2004 sanborn map. (site permit only) | $5,000 |
| Feb 27, 2020 | Completed final sign-off Jan 2021 | 850 Clement St | F C Company | mandatory disability access improvement, install power door operator for unit 852 and techincal infeasibility request for unit 850 to comply with abe ordinance 51-16Details
mandatory disability access improvement, install power door operator for unit 852 and techincal infeasibility request for unit 850 to comply with abe ordinance 51-16 | $1,000 |
| Feb 26, 2020 | Expired or cancelled cancelled Jan 2026 | 3107 Clement St | F C Company | to comply with abe ord 51-16 demolish (e) interior entry loading & level landingDetails
to comply with abe ord 51-16 demolish (e) interior entry loading & level landing | $500 |
| Feb 11, 2020 | Completed final sign-off Aug 2022 | 550 27th Av | F C Company | add one unit to a two unit. to comply with complaint #201981441Details
add one unit to a two unit. to comply with complaint #201981441 | $25,000 |
| Dec 31, 2019 | Never finaled issued Apr 2022, no final | 2215 38th Av | F C Company | 2-story rear addition & recongigure rooms layout at ground & 2nd fl; including 1 new office, study, laundry & bath at ground fl. add 1 new bath & reconfigure (e) kitchen & bath at 2nd fl.Details
2-story rear addition & recongigure rooms layout at ground & 2nd fl; including 1 new office, study, laundry & bath at ground fl. add 1 new bath & reconfigure (e) kitchen & bath at 2nd fl. | $110,000 |
| Dec 23, 2019 | Completed final sign-off Jan 2020 | 323 06th Av | F C Company | repair and level ramp to comply with abe program 51-16.Details
repair and level ramp to comply with abe program 51-16. | $3,000 |
| Dec 17, 2019 | Completed final sign-off Feb 2023 | 716 41st Av | F C Company, Seapoint Construction | comply w/ nov #201995372: leglaize bedroom & bathroom on ground floor and rear deck. check plumbing & electrical work are to current code. restore gargage door opening to a min. 7'-6" width.Details
comply w/ nov #201995372: leglaize bedroom & bathroom on ground floor and rear deck. check plumbing & electrical work are to current code. restore gargage door opening to a min. 7'-6" width. | $8,500 |
| Dec 4, 2019 | Expired or cancelled withdrawn Jan 2020 | 466 Elmira St | F C Company | ground floor improvement, demo (e) storage rooms, add 1 master bedroom, add 1 guest bedroom, add 1 full bathroomDetails
ground floor improvement, demo (e) storage rooms, add 1 master bedroom, add 1 guest bedroom, add 1 full bathroom | $60,000 |
| Sep 3, 2019 | Completed final sign-off Jun 2020 | 1359 32nd Av | F C Company | 1st fl remodel. demo e storage rooms, add 1 master bedroom, add 1 office, add 2 bath, relocate and replace e water heater and furnaceDetails
1st fl remodel. demo e storage rooms, add 1 master bedroom, add 1 office, add 2 bath, relocate and replace e water heater and furnace | $140,000 |