Felix Liu
- Listed as
- contractor, designer
- Firm
- F Liu Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to May 2026
45 permits since 2000 (contractor on 45 permits, designer on 2 permits): 39 completed, 3 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | In progress issued Jul 2026 | 1982 44th Av | F Liu Construction | convert 377sf (e) garage to conditioned space, home office, wet bar, full bathroom, and rec. room (infill ). relocate (e) laundry room, furnace, and water heater.Details
convert 377sf (e) garage to conditioned space, home office, wet bar, full bathroom, and rec. room (infill ). relocate (e) laundry room, furnace, and water heater. | $60,000 |
| May 8, 2026 | In progress issued May 2026 | 2524 03rd St | F Liu Construction | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $10,561 |
| Mar 13, 2026 | In progress issued Jun 2026 | 1433 Taraval St | F Liu Construction | ground floor unit 1433 food service. construct new store front and automatic door opener. new point of sales counter. adjustments to (e) restrooms for ada. infill opening wall to 2/f for unit 1435 office. new full bath. new wet bar and interior partition walls.Details
ground floor unit 1433 food service. construct new store front and automatic door opener. new point of sales counter. adjustments to (e) restrooms for ada. infill opening wall to 2/f for unit 1435 office. new full bath. new wet bar and interior partition walls. | $30,000 |
| Nov 10, 2025 | Completed final sign-off Aug 2026 | 301 De Long St | F Liu Construction | 1)convert an existing storage room (approx 197 sq ft on the ground floor to a bedroom. 2)add a wetbar (approx. 44 sqft). 3)relocate laundry to front of entry.Details
1)convert an existing storage room (approx 197 sq ft on the ground floor to a bedroom. 2)add a wetbar (approx. 44 sqft). 3)relocate laundry to front of entry. | $2,000 |
| Jan 8, 2025 | Completed final sign-off Jul 2026 | 2714 Noriega St | F Liu Construction | remodel (e) 1st floor (rooms down) conditioned space. remodel (e) 2nd floor kitchen & bathrooms. wall removal between kitchen / dining & living room. (e) gas gurn & gas wh to remain. new vinyl replacement windows. new interior doors & entry door unit with sidelight.Details
remodel (e) 1st floor (rooms down) conditioned space. remodel (e) 2nd floor kitchen & bathrooms. wall removal between kitchen / dining & living room. (e) gas gurn & gas wh to remain. new vinyl replacement windows. new interior doors & entry door unit with sidelight. | $120,000 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 530 Niagara Av | F Liu Construction | to obtain final inspection for work approved under pa# 201811196206. all work is complete.Details
to obtain final inspection for work approved under pa# 201811196206. all work is complete. | |
| Jul 30, 2024 | Completed final sign-off Apr 2025 | 481 Sawyer St | F Liu Construction | gr fl remodel: 1/2 bath, full bath, media room with wet bar and 2 bedrooms. 2 new 48 x 48 single hung at rear bedrooms, 36" clear door opening at front entrance to garage. relocate e water heater and furnaceDetails
gr fl remodel: 1/2 bath, full bath, media room with wet bar and 2 bedrooms. 2 new 48 x 48 single hung at rear bedrooms, 36" clear door opening at front entrance to garage. relocate e water heater and furnace | $20,000 |
| Jun 18, 2024 | Completed final sign-off Sep 2024 | 2837 Santiago St | F Liu Construction | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 2 shower pan(s). alteration of service equipment. | $31,700 |
| Apr 17, 2024 | Completed final sign-off Apr 2024 | 767 North Point St | F Liu Construction | to comply with nov 202420632: replace the post and gate to restore it. it is reputed original configuration and requested by the prior. nov and that post was an emergency repair to halt the growing tree which was causing structural damage to the railing.Details
to comply with nov 202420632: replace the post and gate to restore it. it is reputed original configuration and requested by the prior. nov and that post was an emergency repair to halt the growing tree which was causing structural damage to the railing. | $300 |
| Dec 13, 2023 | Completed final sign-off Apr 2024 | 767 North Point St | F Liu Construction | replace dryrot hand rail at street facing stair, replace in kind, less than 50 in-kind of entire stair, approx 8 linear feet of handrail.Details
replace dryrot hand rail at street facing stair, replace in kind, less than 50 in-kind of entire stair, approx 8 linear feet of handrail. | $150 |
| Mar 22, 2023 | Completed final sign-off Oct 2023 | 33 Olympia Wy | F Liu Construction | grd fl addition ~632sf: 1 bedrm, 1 bathrm, 1 fam rm, & mudrm, new 24x36 window, new 60x80 patio dr, relocate (e) 90x48 window. 2nd fl: new 24x48 skylight @ stairDetails
grd fl addition ~632sf: 1 bedrm, 1 bathrm, 1 fam rm, & mudrm, new 24x36 window, new 60x80 patio dr, relocate (e) 90x48 window. 2nd fl: new 24x48 skylight @ stair | $30,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2023 | 924 Rolph St | F Liu Construction | 2nd fl. work only- no structural: add master bathroom w/2x3 sky light, swap location of (e) dinning rm and living rm w/ location of bedroom 3, all new electrical thru out buildingDetails
2nd fl. work only- no structural: add master bathroom w/2x3 sky light, swap location of (e) dinning rm and living rm w/ location of bedroom 3, all new electrical thru out building | $10,000 |
| Dec 20, 2022 | Completed final sign-off Apr 2023 | 2340 34th Av | F Liu Construction | revision to pa 2022-0602-5480, ground fl - added half bath & wetbar; 2nd fl - added solar tubes in bathrooms & stair, stair location revision; deck - shorten deckDetails
revision to pa 2022-0602-5480, ground fl - added half bath & wetbar; 2nd fl - added solar tubes in bathrooms & stair, stair location revision; deck - shorten deck | $3,000 |
| Dec 6, 2022 | Completed final sign-off Mar 2023 | 924 Rolph St | F Liu Construction | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $10,561 |
| Sep 29, 2022 | Completed final sign-off Oct 2022 | 616 08th Av | F Liu Construction | replace siding (fiber cement siding) in kind at rear of building approx 450 sq ft.Details
replace siding (fiber cement siding) in kind at rear of building approx 450 sq ft. | $10,000 |
| Jun 2, 2022 | Completed final sign-off Apr 2023 | 2340 34th Av | F Liu Construction | ground floor addition: 2 bedrooms, family room, and bathroom. 2nf fl renovation: remodel bathroom & kitchen. add new master bedroom and master bath. relocate interior stair to ground floor. demo (e) deck. reconstruct new deck with stair to rear yard. front window replace in-kind, replace stuccoDetails
ground floor addition: 2 bedrooms, family room, and bathroom. 2nf fl renovation: remodel bathroom & kitchen. add new master bedroom and master bath. relocate interior stair to ground floor. demo (e) deck. reconstruct new deck with stair to rear yard. front window replace in-kind, replace stucco | $70,000 |
| May 12, 2022 | Completed final sign-off Aug 2022 | 350 Vienna St | F Liu Construction | revision to pa# 202111232993. relocate bathroom & wetbar sink & cabinetry. new windows at rear 48x48sl(2).Details
revision to pa# 202111232993. relocate bathroom & wetbar sink & cabinetry. new windows at rear 48x48sl(2). | |
| Apr 21, 2022 | Completed final sign-off Sep 2022 | 3515 20th St | F Liu Construction | to comply with planning complaint # 2021-012254enf. sinage correction under separate permit. ground fl: security gate installed at store front. 3rd fl: original windows replaced with (n) aluminum wood clad (24x84 sh)Details
to comply with planning complaint # 2021-012254enf. sinage correction under separate permit. ground fl: security gate installed at store front. 3rd fl: original windows replaced with (n) aluminum wood clad (24x84 sh) | $3,000 |
| Dec 6, 2021 | Completed final sign-off Feb 2022 | 1310 15th Av | F Liu Construction | replace kitchen cabinetryDetails
replace kitchen cabinetry | $3,000 |
| Nov 23, 2021 | Completed final sign-off Aug 2022 | 350 Vienna St | F Liu Construction | legalize gr/fl addition: recreation rm w/sink/cabinetry & bedrm, construct (n)bedrm & bath gr/fl. approx 602 sqft. 2/f renovation: relocate/renovate kitchen, remove internal stair,enlarge(e) bath.construct(n) master bath & walk-in closet. legalize rear deck & stair, rebuild w/fire wallDetails
legalize gr/fl addition: recreation rm w/sink/cabinetry & bedrm, construct (n)bedrm & bath gr/fl. approx 602 sqft. 2/f renovation: relocate/renovate kitchen, remove internal stair,enlarge(e) bath.construct(n) master bath & walk-in closet. legalize rear deck & stair, rebuild w/fire wall | $25,000 |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 2335 20th Av | F Liu Construction | no structural work. 2nd floor only: 1)remodel extg bathroom, add new master bathroom with shower. 2) replace in kind aluminum wood clad windows at front fasadeDetails
no structural work. 2nd floor only: 1)remodel extg bathroom, add new master bathroom with shower. 2) replace in kind aluminum wood clad windows at front fasade | $15,000 |
| Oct 25, 2021 | Completed final sign-off Mar 2022 | 2335 20th Av | F Liu Construction | remodel kitchen includes replacing countertops, cabinetry, new electrical and plumbing for dishwasher and ice dispenser. no structural work.Details
remodel kitchen includes replacing countertops, cabinetry, new electrical and plumbing for dishwasher and ice dispenser. no structural work. | $5,000 |
| Aug 4, 2021 | Completed final sign-off Sep 2021 | 1595 21st Av | F Liu Construction | replace exterior wood siding at rear of house approx. 550 sf.Details
replace exterior wood siding at rear of house approx. 550 sf. | $2,000 |
| Aug 4, 2021 | Completed final sign-off Sep 2021 | 1601 21st Av | F Liu Construction | replace exterior wood siding at rear of house approx. 850 sf.Details
replace exterior wood siding at rear of house approx. 850 sf. | $4,000 |
| Aug 4, 2021 | Completed final sign-off Oct 2021 | 2730 Franklin St | F Liu Construction | unit 1: replace kitchen cabinetry, no plumbing, no electrical.Details
unit 1: replace kitchen cabinetry, no plumbing, no electrical. | $2,000 |
| Jun 17, 2021 | Completed final sign-off Oct 2022 | 662 Naples St | F Liu Construction | comply w/ nov 202060474 ground flr. revert to configuration under permit 9513954. legalize wet bar. 2nd fl- legalize full bathroom addition at rear of house. legalize new opening at side to rear yard and demo unpermitted stair construct (n) stair w/ firewall.Details
comply w/ nov 202060474 ground flr. revert to configuration under permit 9513954. legalize wet bar. 2nd fl- legalize full bathroom addition at rear of house. legalize new opening at side to rear yard and demo unpermitted stair construct (n) stair w/ firewall. | $3,000 |
| Jan 26, 2021 | Completed final sign-off Mar 2022 | 165 Stonecrest Dr | F Liu Construction | demolish wall between extg dinging and extg kitchen and demolish wall between extg hallway and extg dining room. remodel kitchen include new cabinetry, plumbing and electrical island with sink, wet bar, demo extg windows and install sliding door and windows.Details
demolish wall between extg dinging and extg kitchen and demolish wall between extg hallway and extg dining room. remodel kitchen include new cabinetry, plumbing and electrical island with sink, wet bar, demo extg windows and install sliding door and windows. | $50,000 |
| Jun 10, 2020 | Expired or cancelled cancelled Jan 2026 | 2730 Franklin St | F Liu Construction | unit #2: replace kitchen cabinetry and tile flooring in-kind. no plumbing or electrical.Details
unit #2: replace kitchen cabinetry and tile flooring in-kind. no plumbing or electrical. | $3,000 |
| Dec 12, 2019 | Never finaled issued Dec 2022, no final | 2275 18th Av | F Liu Construction | horizontal addition to ground & second floor, and vertical addition to add third floor, add adu to ground floor. kitchen & bathrooms remodel. replace (e) front elevation window in kind & the other ex windows with vinly windows.Details
horizontal addition to ground & second floor, and vertical addition to add third floor, add adu to ground floor. kitchen & bathrooms remodel. replace (e) front elevation window in kind & the other ex windows with vinly windows. | $300,000 |
| Nov 15, 2019 | Completed final sign-off Sep 2025 | 141 Maynard St | F Liu Construction | accessory dwelling unit, legalize bathroom, bedroom and media room on ground fl per ordinance 162-16. construct new kitchen.Details
accessory dwelling unit, legalize bathroom, bedroom and media room on ground fl per ordinance 162-16. construct new kitchen. | $15,000 |
| Nov 19, 2018 | Expired or cancelled expired Aug 2024 | 530 Niagara Av | F Liu Construction | comply w/ n.o.v 201885951. demo unpermitted storage structure at side of propertyDetails
comply w/ n.o.v 201885951. demo unpermitted storage structure at side of property | $1,000 |
| Oct 26, 2018 | Completed final sign-off Jan 2019 | 3200 Judah St | F Liu Construction | comply w/ n.o.v's 201890651 & 201888601. remove unpermitted half bath at 3rd flr. cut & cap all utilities. legalize bedrm 2 & bedrm 3 that were prev the living rm & dining rm. fix thermostat & kitchen floor covering. remove deadbolt on bedroom 1 door allowing access to fire escapeDetails
comply w/ n.o.v's 201890651 & 201888601. remove unpermitted half bath at 3rd flr. cut & cap all utilities. legalize bedrm 2 & bedrm 3 that were prev the living rm & dining rm. fix thermostat & kitchen floor covering. remove deadbolt on bedroom 1 door allowing access to fire escape | $500 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 218 Gambier St | F Liu Construction | remodel existing residence to construct new deck and stairs at rear. relocate existing garage door. revision to pa 201712126207Details
remodel existing residence to construct new deck and stairs at rear. relocate existing garage door. revision to pa 201712126207 | $8,000 |
| Mar 22, 2018 | Completed final sign-off Jul 2018 | 1326 11th Av | John Woo Constructionllc, F Liu Construction | comply with nov item #1 201780381, 201783091 (1) remove 3rd story sunroom and revert back to approved deck per bldg. pa 200204184333 & remove unpermitted attached deck on 3rd and 2nd floor that extends approx 7' into rear yard in compliance with nov 201780381 and 201318211. permit for electricalDetails
comply with nov item #1 201780381, 201783091 (1) remove 3rd story sunroom and revert back to approved deck per bldg. pa 200204184333 & remove unpermitted attached deck on 3rd and 2nd floor that extends approx 7' into rear yard in compliance with nov 201780381 and 201318211. permit for electrical | $5,000 |
| Mar 22, 2018 | Completed final sign-off Apr 2018 | 1630 Geneva Av | F Liu Construction | revision to app#201712146487 to clarify mislabeled extg to new of ground floor 2 bedrooms, 2 bathrooms and one recreation room.Details
revision to app#201712146487 to clarify mislabeled extg to new of ground floor 2 bedrooms, 2 bathrooms and one recreation room. | |
| Jan 26, 2018 | Completed final sign-off Oct 2021 | 1310 44th Av | F Liu Construction | legalize unpermitted unit on the ground flr per ord 43-14: 1 hr fire rated ceiling between new unit & upper unit. legalize & renovate full bathroom. legalize living room. add new dedicated bicycle parking. ground flr only (approx 247 sf)Details
legalize unpermitted unit on the ground flr per ord 43-14: 1 hr fire rated ceiling between new unit & upper unit. legalize & renovate full bathroom. legalize living room. add new dedicated bicycle parking. ground flr only (approx 247 sf) | $5,950 |
| Jan 4, 2018 | Completed final sign-off Oct 2018 | 630 19th Av | F Liu Construction | unit 2 remodel (e) kitche - new tiles,countertops & cabinets remodel (e) 2 full baths - new tiles, toilet, vanity, tub shower replace electrical wiring throughout unit. new switches, wiring, recpt/ replace broken furnanceDetails
unit 2 remodel (e) kitche - new tiles,countertops & cabinets remodel (e) 2 full baths - new tiles, toilet, vanity, tub shower replace electrical wiring throughout unit. new switches, wiring, recpt/ replace broken furnance | $20,000 |
| Dec 14, 2017 | Completed final sign-off Apr 2018 | 1630 Geneva Av | F Liu Construction | ground floor, approx 700 sq ft - construct 2 (n) bedrooms, 2 (n) full baths and a (n) recreation room. relocate (e) water heater & (e) furnace. construct (n) laundry area; 2nd fl - demo (e) closet in living room & construct (n) full bathDetails
ground floor, approx 700 sq ft - construct 2 (n) bedrooms, 2 (n) full baths and a (n) recreation room. relocate (e) water heater & (e) furnace. construct (n) laundry area; 2nd fl - demo (e) closet in living room & construct (n) full bath | $30,000 |
| Dec 12, 2017 | Completed final sign-off Jun 2018 | 218 Gambier St | F Liu Construction | remodel 2nd floor, add new bath to master bedroom. layout changes. first floor convert storage to 2 bedrooms and 2 baths. replace front windows. restucco exterior. new deck and stairs at rear.Details
remodel 2nd floor, add new bath to master bedroom. layout changes. first floor convert storage to 2 bedrooms and 2 baths. replace front windows. restucco exterior. new deck and stairs at rear. | $70,000 |
| Nov 13, 2017 | Completed final sign-off Jun 2018 | 218 Gambier St | F Liu Construction | bathroom remodel, kitchen remodel: new tiles, fixtures, vanity in bathroom; new countertops, cabinets and fixtures in kitchenDetails
bathroom remodel, kitchen remodel: new tiles, fixtures, vanity in bathroom; new countertops, cabinets and fixtures in kitchen | $5,000 |
| Sep 6, 2017 | Completed final sign-off Aug 2018 | 1310 44th Av | F Liu Construction | 2nd floor: remodel (e) kitchen & remove (e) wall between living room & kitchen. remodel (e) bathroom, demo (e) shower.Details
2nd floor: remodel (e) kitchen & remove (e) wall between living room & kitchen. remodel (e) bathroom, demo (e) shower. | $20,000 |
| Jul 28, 2016 | Completed final sign-off Dec 2016 | 2690 24th Av | F Liu Construction | gr fl only. approx 866 sf infill e door and 2 e windows rear wall, new bedroom,rec room, full bath w/laundry,n 72x80 glass sliding door in n bedrm,2 30x48 windows in rec room, relocate e furnace and water heater,Details
gr fl only. approx 866 sf infill e door and 2 e windows rear wall, new bedroom,rec room, full bath w/laundry,n 72x80 glass sliding door in n bedrm,2 30x48 windows in rec room, relocate e furnace and water heater, | $30,000 |
| May 6, 2014 | Completed final sign-off Sep 2014 | 3421 Scott St | F Liu Construction | construct (n) bathroom in place of (e) lightwell. compliance with ordinance no 155-13 not required.Details
construct (n) bathroom in place of (e) lightwell. compliance with ordinance no 155-13 not required. | $5,000 |
| Feb 5, 2014 | Completed final sign-off Jul 2014 | 1795 40th Av | F Liu Construction | construct 1 family room, 2 full baths, 1 study, 1 bedroom, 1 storage at gr fl. relocate e furnace and wtr htr, replace 3 windows with new door @north wall. replace in kind 3 windows facing entrance, new window @ west wall, new door east wall. 2nd fl: remove e bath, e closet @ mstr bedrm, 2 new fullDetails
construct 1 family room, 2 full baths, 1 study, 1 bedroom, 1 storage at gr fl. relocate e furnace and wtr htr, replace 3 windows with new door @north wall. replace in kind 3 windows facing entrance, new window @ west wall, new door east wall. 2nd fl: remove e bath, e closet @ mstr bedrm, 2 new full | $20,000 |
| Aug 12, 2013 | Completed final sign-off Nov 2013 | 309 Peninsula Av | F Liu Construction | relocate both (e) furnace & (e) water heater, (e) water heater replace w/tankless, replace in-kind 2-ground floor windows, install (n) 3x3 window. construct 36" wide door openign @ east wall, additoin of 1-bedroom, 1 storage room, 1 laundry room, (n) bathroom @ gorund level.Details
relocate both (e) furnace & (e) water heater, (e) water heater replace w/tankless, replace in-kind 2-ground floor windows, install (n) 3x3 window. construct 36" wide door openign @ east wall, additoin of 1-bedroom, 1 storage room, 1 laundry room, (n) bathroom @ gorund level. | $15,000 |