Evan Raabe
- Listed as
- architect
- On San Francisco permits
- Jun 2025 to Aug 2026
10 permits since 2000 (architect on 10 permits): 1 completed, 9 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Sep 2026 | 301 Toland St | Skyline Construction | repair of existing stuctural roof trusses.Details
repair of existing stuctural roof trusses. | $175,000 |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 301 Toland St | t.i. of (e) 96193.9 sf building to incorporate private electric fleet vehicle service repair w/ accessory office use. (e) accessory office to be expanded. to incorporate individual offices and shared workspace, a breakroom, restrooms, and reception area.Details
t.i. of (e) 96193.9 sf building to incorporate private electric fleet vehicle service repair w/ accessory office use. (e) accessory office to be expanded. to incorporate individual offices and shared workspace, a breakroom, restrooms, and reception area. | $1,000,000 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 3550 03rd St | /(n) reconfigured parking lot striping and expansion of parking strip as approved by za for employee parking and pre maintenance vechiles free standing vacuum stations with canopy new motorized vechiular gates, new guard shack. work in building includes new meeting rooms and restrooms. indoor vacuumDetails
/(n) reconfigured parking lot striping and expansion of parking strip as approved by za for employee parking and pre maintenance vechiles free standing vacuum stations with canopy new motorized vechiular gates, new guard shack. work in building includes new meeting rooms and restrooms. indoor vacuum | $700,000 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 175 Quint St | (n) reconfigured parking lot striping and expansion of parking strip as approved by za. new canopy new fencing and landscaping at property line. new motorized vehicular gates at custer ave. new gauard shade. new site lighting and prtection bollards.Details
(n) reconfigured parking lot striping and expansion of parking strip as approved by za. new canopy new fencing and landscaping at property line. new motorized vehicular gates at custer ave. new gauard shade. new site lighting and prtection bollards. | $350,000 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 141 Quint St | new reconfigured parking lot stripping and expansion of pakring stripping as approved by 2a. new free standing shade canopies. new perimeter fencinig + landscaping at property line. new it data structure. new site lighting and protection bolland.Details
new reconfigured parking lot stripping and expansion of pakring stripping as approved by 2a. new free standing shade canopies. new perimeter fencinig + landscaping at property line. new it data structure. new site lighting and protection bolland. | $250,000 | |
| Apr 28, 2026 | In progress issued Aug 2026 | 301 Toland St | Skyline Construction | work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular liftDetails
work to include structural demo; new accessible pedestrian stair & ramp @ fixture reception; new vehicular ingress/exit including high speed overhead door located at (1) hundson & (1) along toland; new canopy; new egress stair and exterior door; new topping slab; footings, for fixture vehicular lift | $300,000 |
| Mar 2, 2026 | Completed final sign-off May 2026 | 301 Toland St | Skyline Construction | demo office space adjacent to toland st. floor, framing & finishes. demo non structural demising partitions. demo interior rooms & plumbing fixtures at central tenant space. ab017Details
demo office space adjacent to toland st. floor, framing & finishes. demo non structural demising partitions. demo interior rooms & plumbing fixtures at central tenant space. ab017 | $80,000 |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 150 14th St | structural anchorage of automatic vehicle charging system. non-street facing.Details
structural anchorage of automatic vehicle charging system. non-street facing. | $6,000 | |
| Aug 12, 2025 | In progress filed Aug 2025, not yet issued | 2225 Jerrold Av | mep for light manufacturing/warehouse tenat improvement. reference#202506178846Details
mep for light manufacturing/warehouse tenat improvement. reference#202506178846 | ||
| Jun 17, 2025 | In progress issued Aug 2025 | 2225 Jerrold Av | Devcon Construction, Bcci Construction Company | new manufacturing restrooms. new door hardware on (e) doors. re-stripe (e) parking lot for 37 parking space off mckinnon ave. new accessible ramp to main entry. replacement of 3 overhead loading doors. new accessible parking off jerrold aveDetails
new manufacturing restrooms. new door hardware on (e) doors. re-stripe (e) parking lot for 37 parking space off mckinnon ave. new accessible ramp to main entry. replacement of 3 overhead loading doors. new accessible parking off jerrold ave | $700,000 |