Eugene Ye
- Listed as
- architect, engineer
- On San Francisco permits
- Apr 2026 to Sep 2026
5 permits since 2000 (engineer on 3 permits, architect on 2 permits): 1 completed, 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access...Details
vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 1, 2026 | In progress issued Sep 2026 | 42 Seminole Av | Bmj Construction | 1/f: add bedroom, family room, bathroom mechanical room & storage; 2/f: remodel kitchen & bathroom and add (1) new powder.Details
1/f: add bedroom, family room, bathroom mechanical room & storage; 2/f: remodel kitchen & bathroom and add (1) new powder. | $145,000 |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 465 46th Av | 1st floor: add 1 bedroom, 1 closet, relocate bathroom, laundry area and interior staircase. 2nd floor: add 1 master bath, 1 master closet, 1 powder room, relocate kitchen. add new roof deck with roof hatch.Details
1st floor: add 1 bedroom, 1 closet, relocate bathroom, laundry area and interior staircase. 2nd floor: add 1 master bath, 1 master closet, 1 powder room, relocate kitchen. add new roof deck with roof hatch. | $250,000 | |
| Apr 24, 2026 | In progress issued May 2026 | 448 Nevada St | Jeff L Yang | basement: add n) bathroom, bedroom & closet. 1st/f: relocate kitchen & bath, remove staircase btw 1st/f & attic, add n) bedroom, closet & laundry. add n) intrerior connection btw basement & 1st/f. add 5 new window & replace 3 windows in kind. r & r retaining wall w/ n) concrete retaining wall frontDetails
basement: add n) bathroom, bedroom & closet. 1st/f: relocate kitchen & bath, remove staircase btw 1st/f & attic, add n) bedroom, closet & laundry. add n) intrerior connection btw basement & 1st/f. add 5 new window & replace 3 windows in kind. r & r retaining wall w/ n) concrete retaining wall front | $150,000 |
| Apr 15, 2026 | Completed final sign-off Jul 2026 | 1529 Mason St | Wan Li Construction Co | all work under unit 1533 1st floor: add new laundry area at (e) bathroom and remove non load bearing stud at kitchen area. upgrade and provide headroom clearence at (e) landing for egress corridor. remodel kitchen/bathroom.Details
all work under unit 1533 1st floor: add new laundry area at (e) bathroom and remove non load bearing stud at kitchen area. upgrade and provide headroom clearence at (e) landing for egress corridor. remodel kitchen/bathroom. | $45,000 |