Eric Matthew Owen
- Listed as
- authorized agent-others, contractor
- Firm
- Bradshaw Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2024 to Aug 2026
9 permits since 2000 (contractor on 9 permits, authorized agent-others on 1 permit): 2 completed, 7 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Sep 2026 | 303 02nd St | Bradshaw Group Inc | ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibmDetails
ste - n115: ti project, renovation of (e) b occupancy space. no change in occupancy ref bpa: 201603182443 stamp new recive pages ibm | $140,000 |
| Mar 24, 2026 | In progress issued Aug 2026 | 303 02nd St | Bradshaw Group Inc | deferred electrcial for 202507211257.Details
deferred electrcial for 202507211257. | $94,384 |
| Feb 20, 2026 | Completed final sign-off Aug 2026 | 555 California St | Bradshaw Group Inc | revisions to 202510227850 (ref permit 202409110535). revisions to proposed ev panel board increase from 1200a to 1600a.Details
revisions to 202510227850 (ref permit 202409110535). revisions to proposed ev panel board increase from 1200a to 1600a. | |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Bradshaw Group Inc | ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.Details
ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work. | $250,000 |
| Jan 27, 2026 | In progress issued Jan 2026 | 201 Spear St | Bradshaw Group Inc | g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017Details
g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017 | $15,000 |
| Oct 22, 2025 | In progress issued Oct 2025 | 555 California St | Bradshaw Group Inc | revision 202409110535 - to augment scope to replace 7 (e) parking stalls with 2 ev chargin stalls and 2 ada charging stalls. 3 standard parking stalls to be removed to install electrical equipmentDetails
revision 202409110535 - to augment scope to replace 7 (e) parking stalls with 2 ev chargin stalls and 2 ada charging stalls. 3 standard parking stalls to be removed to install electrical equipment | |
| Jul 21, 2025 | In progress issued Nov 2025 | 303 02nd St | Bradshaw Group Inc | #105: interior tenant improvement including renovation of non bearing interiror partitoins and finishes,modification to the lighting, modiifcation to the electrical and data,modification to the plumbing and fixtures,new kitchen equipment, with no change to building envelope or shear bracing walls.Details
#105: interior tenant improvement including renovation of non bearing interiror partitoins and finishes,modification to the lighting, modiifcation to the electrical and data,modification to the plumbing and fixtures,new kitchen equipment, with no change to building envelope or shear bracing walls. | $916,112 |
| Feb 20, 2025 | In progress issued Apr 2026 | 65 Oak Grove St | Bradshaw Group Inc | new exterior facade main entry and paint around. maintain andupdate the (e) g/f interior parking and including a new 2-story entry lobby including (n) elevator and grand stair to 2/f. ti on 2/f:reception,offices, conference room areas,meeting room,restrooms and office support areas. skylight and pv.Details
new exterior facade main entry and paint around. maintain andupdate the (e) g/f interior parking and including a new 2-story entry lobby including (n) elevator and grand stair to 2/f. ti on 2/f:reception,offices, conference room areas,meeting room,restrooms and office support areas. skylight and pv. | $2,000,000 |
| Sep 11, 2024 | In progress issued Oct 2025 | 555 California St | Bradshaw Group Inc | replace 9 (e) parking stalls w/ 4 ev charging stalls & 2 accessible ev charging stalls. 3 standard stalls to be removed to install electric equip. demo (e) surfaces to install ev chargers. confirmation of surfaces associated with evse to comply with ada. 1 kempower single port rempower ev chargers.Details
replace 9 (e) parking stalls w/ 4 ev charging stalls & 2 accessible ev charging stalls. 3 standard stalls to be removed to install electric equip. demo (e) surfaces to install ev chargers. confirmation of surfaces associated with evse to comply with ada. 1 kempower single port rempower ev chargers. | $240,000 |