Eric Kreager
- Listed as
- engineer
- Firm
- Mkm & Associates
- Based in
- Rhonert Park
- On San Francisco permits
- Jun 2013 to Jun 2026
13 permits since 2000 (engineer on 13 permits): 7 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 5 Clarendon Av | remove drywall and reinstall. relocate minor wall partition. update arc fault in bedroom. replace kitchen and 4 baths. install new navien on demeand gas w/h. replace hvac with samsung heat pump furnace. replace gas fireplace insert. replace rolled roofing. permit to comply w nov 2026-57469.Details
remove drywall and reinstall. relocate minor wall partition. update arc fault in bedroom. replace kitchen and 4 baths. install new navien on demeand gas w/h. replace hvac with samsung heat pump furnace. replace gas fireplace insert. replace rolled roofing. permit to comply w nov 2026-57469. | $160,008 | |
| May 28, 2026 | In progress issued May 2026 | 1033 Dolores St | voluntary partial seismic upgrade at crawspace & accessible level 1 area, floor diaphram stengthening, 1 replace window (rear), 1 new window at level 1 (rear), foundation vents, relocated crawspace access.Details
voluntary partial seismic upgrade at crawspace & accessible level 1 area, floor diaphram stengthening, 1 replace window (rear), 1 new window at level 1 (rear), foundation vents, relocated crawspace access. | $75,000 | |
| Dec 18, 2025 | In progress issued Jan 2026 | 625 Market St | installation of one marble ceiling panel in building lobby of 625 market st including structural support. replacement of entry door threshold with new accessible threshold. no other changes to (e) lobby under this permit. no changes to building use, egress, or occupancy.Details
installation of one marble ceiling panel in building lobby of 625 market st including structural support. replacement of entry door threshold with new accessible threshold. no other changes to (e) lobby under this permit. no changes to building use, egress, or occupancy. | $7,000 | |
| Jul 16, 2025 | Completed final sign-off Nov 2025 | 64 Golden Gate Av | revision to pa# 202012241726: additional seismic structural hardware added.Details
revision to pa# 202012241726: additional seismic structural hardware added. | $2,000 | |
| Jun 23, 2025 | In progress issued Dec 2025 | 26 Mizpah St | Lackey Construction Inc | 310 sf horizontal addition at rear, new dormers, remodel throughout the three floors, electrical service upgrade.Details
310 sf horizontal addition at rear, new dormers, remodel throughout the three floors, electrical service upgrade. | $790,000 |
| May 20, 2025 | Expired or cancelled cancelled May 2025 | 2762 Octavia St | conversion on level 2 of (e) office space to 3 apartment units.Details
conversion on level 2 of (e) office space to 3 apartment units. | $250,000 | |
| Jul 30, 2024 | Completed final sign-off Nov 2024 | 2006 Sloat Bl | A M G Construction | remodel bathroom, add new bathroom, remove wall, remodel kitchenDetails
remodel bathroom, add new bathroom, remove wall, remodel kitchen | $125,000 |
| Nov 28, 2023 | Completed final sign-off Oct 2024 | 151 Warriors Wy | Pacific Wide Builders Inc. | suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permitDetails
suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permit | $2,250,000 |
| Oct 19, 2023 | Completed final sign-off Dec 2023 | 462 Green St | Turnd Inc. | repair 4 story stairway in kind - less than 50% of the total structureDetails
repair 4 story stairway in kind - less than 50% of the total structure | $100,000 |
| Jan 24, 2022 | Completed final sign-off Feb 2022 | 432 Jackson St | Aidan Collins & Sons Inc | repair and replace area on 1st fl subfloor because of discolored rot. work in addition to pa 202011309841 and 202109239030Details
repair and replace area on 1st fl subfloor because of discolored rot. work in addition to pa 202011309841 and 202109239030 | $4,000 |
| Jun 27, 2016 | Never finaled issued Jul 2016, no final | 2045 Broadway | Aidan Collins & Sons Inc | revision to app#201509177304. add res elevator to access 3 levels. renovate storage and laundry on ground level. reorder master bath mlv 2 & 3 . remove entry wall lv2. n/a for maher.Details
revision to app#201509177304. add res elevator to access 3 levels. renovate storage and laundry on ground level. reorder master bath mlv 2 & 3 . remove entry wall lv2. n/a for maher. | $160,000 |
| Mar 3, 2014 | Completed final sign-off Feb 2015 | 3426 Broderick St | Colindres & Associates | rev. pa# 201305025982, clarifications or added details based on found conditions of this remodel project. compliance with ordinance no. 155-13 not required.Details
rev. pa# 201305025982, clarifications or added details based on found conditions of this remodel project. compliance with ordinance no. 155-13 not required. | |
| Jun 17, 2013 | Completed final sign-off Jun 2013 | 2446 Green St | Paul White Construction Inc | revision to app#201208227987. reduce size of existing deck and eliminate new footings for deck.Details
revision to app#201208227987. reduce size of existing deck and eliminate new footings for deck. |