Enrique T. Soliven
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Facilities Design Group
- Based in
- Pleasant Hill
- On San Francisco permits
- Sep 2003 to Feb 2026
21 permits since 2000 (architect on 20 permits, authorized agent-others on 1 permit, engineer on 1 permit): 15 completed, 1 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2026 | In progress issued May 2026 | 24 San Benito Wy | interior remodel to existing kitchen, dining, family and bathroomDetails
interior remodel to existing kitchen, dining, family and bathroom | $50,000 | |
| Aug 28, 2018 | Never finaled filed Aug 2018, never issued | 1450 Clay St | Z M Sayo Const.Repair | convert (e) storage & unused area @ basement floor into (2) new accessory dwelling units (adu) per ordinance #162-16 for a building total of 25 units.Details
convert (e) storage & unused area @ basement floor into (2) new accessory dwelling units (adu) per ordinance #162-16 for a building total of 25 units. | $50,000 |
| May 12, 2016 | Never finaled issued Jan 2017, no final | 1230 Chestnut St | add new bathroom & hall to (e) ground floor unit to be legalized per ordinance 43-14 per pa201605127307Details
add new bathroom & hall to (e) ground floor unit to be legalized per ordinance 43-14 per pa201605127307 | $5,000 | |
| May 12, 2016 | Completed final sign-off Jul 2017 | 1230 Chestnut St | legalization of (e) unit at ground floor per ordinance 43-14Details
legalization of (e) unit at ground floor per ordinance 43-14 | ||
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 3331 Divisadero St | renovation of unit #3331 divisadero (2nd floor) - replacement of non visible of the 22 existing aluminum windows with vinyl.front windows with aluminum wood clad only. new master suite (bedroom/bath) @ ground floor with stair.Details
renovation of unit #3331 divisadero (2nd floor) - replacement of non visible of the 22 existing aluminum windows with vinyl.front windows with aluminum wood clad only. new master suite (bedroom/bath) @ ground floor with stair. | $70,000 | |
| Jan 21, 2014 | Completed final sign-off May 2014 | 2255 Francisco St | remodel unit 2255, 2nd fl. renovate e bathrooms and kitchen. compliance with ord no 155-13 not required. add 1 bathroom, repair deck less than 50%.Details
remodel unit 2255, 2nd fl. renovate e bathrooms and kitchen. compliance with ord no 155-13 not required. add 1 bathroom, repair deck less than 50%. | $20,000 | |
| Nov 15, 2013 | Completed final sign-off Aug 2014 | 1870 Church St | remodel master suite at ground floor per plan attached. add bathroom & relcoate utility area.Details
remodel master suite at ground floor per plan attached. add bathroom & relcoate utility area. | $40,000 | |
| May 8, 2012 | Completed final sign-off May 2012 | 2255 Francisco St | comply with inspection report cc-7100Details
comply with inspection report cc-7100 | ||
| Jul 29, 2011 | Completed final sign-off Dec 2011 | 3108 Franklin St | revision to appl #201007166828: to reflect existing roof framing conditional & proposed roof framing.Details
revision to appl #201007166828: to reflect existing roof framing conditional & proposed roof framing. | ||
| Jul 16, 2010 | Completed final sign-off Dec 2011 | 3108 Franklin St | rear addition & interior renovation per plans attached.Details
rear addition & interior renovation per plans attached. | $100,000 | |
| Oct 16, 2008 | Completed final sign-off Nov 2009 | 1554 25th Av | ground floor: add 1 full t/b + 1/2 toilet, family room, master bedroom, den/study, rear windows, door at garage side front entrance. replace water heater/furnace/ductworks, new floor/wall finish electrical/plumbing. add 2x2 skylight on roof.Details
ground floor: add 1 full t/b + 1/2 toilet, family room, master bedroom, den/study, rear windows, door at garage side front entrance. replace water heater/furnace/ductworks, new floor/wall finish electrical/plumbing. add 2x2 skylight on roof. | $35,000 | |
| Oct 3, 2008 | Completed final sign-off Dec 2008 | 2915 Laguna St | addition work to extg approved app# 200608099053 to include roof access stairs and patio on roofDetails
addition work to extg approved app# 200608099053 to include roof access stairs and patio on roof | $10,000 | |
| Nov 26, 2007 | Completed final sign-off May 2008 | 1879 20th Av | He & Kuang Inc | add bathroom, remodel upper bath, remodel kitchen, convert laundry room to den, convert family room to mstr bedroom, add sliding doors at rear, replace (e) deck, (n) sectional garage door, (n) furnace & wtr heater.Details
add bathroom, remodel upper bath, remodel kitchen, convert laundry room to den, convert family room to mstr bedroom, add sliding doors at rear, replace (e) deck, (n) sectional garage door, (n) furnace & wtr heater. | $35,000 |
| May 1, 2007 | Completed final sign-off Jan 2008 | 7004 California St | renovation of unit #7004 per plans attached. add a bathroom in (e) closet and raise ceiling in kitchen & living room.Details
renovation of unit #7004 per plans attached. add a bathroom in (e) closet and raise ceiling in kitchen & living room. | $30,000 | |
| Feb 27, 2007 | Expired or cancelled expired Jan 2008 | 7002 California St | revision to pa# 200612119562-reflect correction in framing to (e) site conditions per attached plans. new 4x12 ceiling header. work in unit #7006.Details
revision to pa# 200612119562-reflect correction in framing to (e) site conditions per attached plans. new 4x12 ceiling header. work in unit #7006. | $1,000 | |
| Aug 15, 2006 | Expired or cancelled expired May 2008 | 1855 Greenwich St | renovation of kitchen & bathroom and miscellaneous framing per attached plans in lower unit.Details
renovation of kitchen & bathroom and miscellaneous framing per attached plans in lower unit. | $35,000 | |
| May 24, 2006 | Completed final sign-off Oct 2006 | 446 Lake St | renovation per plan including remodel kitchen & 2 (e) bathrooms. construction of additional bedroom & bathroom @g/f level. new roof deck @ rear.Details
renovation per plan including remodel kitchen & 2 (e) bathrooms. construction of additional bedroom & bathroom @g/f level. new roof deck @ rear. | $70,000 | |
| May 2, 2006 | Completed final sign-off Mar 2007 | 1220 Chestnut St | install 1 new window in unit #1224 (top unit) a@ property line wall per plans attached.Details
install 1 new window in unit #1224 (top unit) a@ property line wall per plans attached. | $2,500 | |
| May 2, 2006 | Completed final sign-off Mar 2007 | 1220 Chestnut St | renovation of unit 1224 per plans attached. bathroom & kitchen renovation with no layout change.Details
renovation of unit 1224 per plans attached. bathroom & kitchen renovation with no layout change. | $25,000 | |
| May 12, 2005 | Expired or cancelled cancelled Sep 2006 | 2610 Sacramento St | renovation for attached plans for all levels.Details
renovation for attached plans for all levels. | $100,000 | |
| Sep 24, 2003 | Completed final sign-off Sep 2003 | 2115 Broadway | renew app #200205217123/200212042748/200302046687Details
renew app #200205217123/200212042748/200302046687 |