3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 10, 2023 | Completed final sign-off Aug 2023 | 2860 16th St | Cupertino Electric Inc. | revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detail 1 & detail 6.Details
revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detail 1 & detail 6. | |
| Feb 17, 2022 | Completed final sign-off Aug 2023 | 2860 16th St | Cupertino Electric Inc. | installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit for security system, access & telecom systems.Details
installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit for security system, access & telecom systems. | $1,580,530 |
| Apr 29, 2019 | Completed final sign-off Feb 2020 | 1101 Green St | Cupertino Electric Inc. | install 16 electric vehicle charging stations. electrical onlyDetails
install 16 electric vehicle charging stations. electrical only | $160,000 |