Permit GraphShortlistSan Francisco building permits since 2000

Emmanuel Memdo

License
E21937
Look the license up with the state
Listed as
engineer
Firm
Cupertino Electric Inc
Based in
San Jose
On San Francisco permits
Apr 2019 to Jan 2023

3 permits since 2000 (engineer on 3 permits): 3 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 10, 2023Completed
final sign-off Aug 2023
2860 16th StCupertino Electric Inc.revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detail 1 & detail 6.
Details
Permit
202301109980
Status
complete
Filed
Jan 10, 2023
Permit issued
Jul 14, 2023
Final sign-off
Aug 2, 2023
Address
2860 16th St

revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detail 1 & detail 6.

Open the permit page

Feb 17, 2022Completed
final sign-off Aug 2023
2860 16th StCupertino Electric Inc.installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit for security system, access & telecom systems.
Details
Permit
202202178216
Status
complete
Filed
Feb 17, 2022
Permit issued
Oct 20, 2022
Final sign-off
Aug 2, 2023
Declared cost
$1,580,530
Address
2860 16th St

installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit for security system, access & telecom systems.

Open the permit page

$1,580,530
Apr 29, 2019Completed
final sign-off Feb 2020
1101 Green StCupertino Electric Inc.install 16 electric vehicle charging stations. electrical only
Details
Permit
201904299158
Status
complete
Filed
Apr 29, 2019
Permit issued
Jun 4, 2019
Final sign-off
Feb 11, 2020
Declared cost
$160,000
Address
1101 Green St

install 16 electric vehicle charging stations. electrical only

Open the permit page

$160,000