Edgardo J. Diaz
- Listed as
- authorized agent-others, contractor
- Firm
- Diaz Construction
- Based in
- Menlo Park
- On San Francisco permits
- May 2014 to Jun 2026
17 permits since 2000 (contractor on 17 permits, authorized agent-others on 1 permit): 11 completed, 3 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jun 2026 | 2060 Greenwich St | Diaz Construction | like for like bathrooms remodels x 2. like for like kitchen remodelDetails
like for like bathrooms remodels x 2. like for like kitchen remodel | $35,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 2058 Greenwich St | Diaz Construction | like for like bathroom remodel. like for like kitchen remodel.Details
like for like bathroom remodel. like for like kitchen remodel. | $25,000 |
| Jun 17, 2025 | In progress issued Jun 2025 | 289 Nevada St | Diaz Construction | (2) like for like bathroom remodel. update lights and plumbing. (1) like for like kitchen renovation.Details
(2) like for like bathroom remodel. update lights and plumbing. (1) like for like kitchen renovation. | $26,000 |
| Jun 17, 2025 | Completed final sign-off Jan 2026 | 400 Detroit St | Diaz Construction | bathroom remodel including new light fixtures, new flooring, new vanity. bring bathroom up to code. like for like.Details
bathroom remodel including new light fixtures, new flooring, new vanity. bring bathroom up to code. like for like. | $8,000 |
| Nov 29, 2023 | Completed final sign-off Mar 2024 | 90 Westgate Dr | Diaz Construction | bathroom, tub & shower remodel. ceiling exhaust fan to be replace. (n) tub, (n) flooring, (n) water control valvesDetails
bathroom, tub & shower remodel. ceiling exhaust fan to be replace. (n) tub, (n) flooring, (n) water control valves | $15,000 |
| Dec 5, 2022 | Completed final sign-off Jan 2023 | 2230 Pacific Av | Diaz Construction | unit 303: partial bathroom remodel, in-kind. replcing tub like for like. install new tile in the (e) wet wall space.Details
unit 303: partial bathroom remodel, in-kind. replcing tub like for like. install new tile in the (e) wet wall space. | $6,000 |
| Dec 5, 2022 | Completed final sign-off Mar 2023 | 431 Capp St | Diaz Construction | demo (e) siding, waterproof exterior with tyvek paper. installation of fiber cement boards. work in common area.Details
demo (e) siding, waterproof exterior with tyvek paper. installation of fiber cement boards. work in common area. | $11,000 |
| Oct 18, 2022 | Completed final sign-off Mar 2023 | 640 Shotwell St | Diaz Construction | bathroom remodel in kind. no layout changes. replacing (e) fixture with new, toilet, sink vanity, shower, lighting fixtures. updating water pipes, vent pipes, and tiles in the bathroom. vent installation through roof, like for like repair of roof for vent.Details
bathroom remodel in kind. no layout changes. replacing (e) fixture with new, toilet, sink vanity, shower, lighting fixtures. updating water pipes, vent pipes, and tiles in the bathroom. vent installation through roof, like for like repair of roof for vent. | $7,000 |
| Jun 21, 2022 | Expired or cancelled withdrawn Jun 2023 | 465 30th St | Diaz Construction | main lvl - kitchen remodel. basement remodel - new laundry, new bathroom, relocate furnace & water heater, conversion of crawl space to living space. new staircase - basement to attic. window replacement & new sliding door to exterior. roof alterations - 4 new dormers.Details
main lvl - kitchen remodel. basement remodel - new laundry, new bathroom, relocate furnace & water heater, conversion of crawl space to living space. new staircase - basement to attic. window replacement & new sliding door to exterior. roof alterations - 4 new dormers. | $120,000 |
| Jun 16, 2022 | Completed final sign-off Mar 2023 | 3650 17th St | Diaz Construction | remodel (e) kitchen and bathroom. addition of (n) full bath. (n) skylights per plan.Details
remodel (e) kitchen and bathroom. addition of (n) full bath. (n) skylights per plan. | $250,000 |
| Apr 27, 2022 | Completed final sign-off Sep 2022 | 1325 11th Av | Diaz Construction | bathroom 1 - move sink vanity; add toilet; replace all fixtures; bathroom 2 - move partition wall; add sink; replace toilet; kitchen - replace refrigerator; replace hood (stove) and upgrade electrical and plumbing to codeDetails
bathroom 1 - move sink vanity; add toilet; replace all fixtures; bathroom 2 - move partition wall; add sink; replace toilet; kitchen - replace refrigerator; replace hood (stove) and upgrade electrical and plumbing to code | $21,000 |
| Apr 25, 2022 | Completed final sign-off Jan 2023 | 1143 Fell St | Diaz Construction | like for like bathroom remodel. like for like kitchen remodel. new lights location, new plumbing for bathroom fixtures.Details
like for like bathroom remodel. like for like kitchen remodel. new lights location, new plumbing for bathroom fixtures. | $40,000 |
| Mar 8, 2022 | Completed final sign-off Jun 2022 | 1236 19th St | Diaz Construction | bathroom remodel. like for like. update electrical and plumbing. remove and replace toilet and vanity. non structural.Details
bathroom remodel. like for like. update electrical and plumbing. remove and replace toilet and vanity. non structural. | $9,000 |
| Mar 8, 2022 | Completed final sign-off Jul 2022 | 639 17th Av | Diaz Construction | remodel (e) bathroom with layout changes. moving non-load bearing wall. add new shower. relocate double vanity. updating electrical & plumbing.Details
remodel (e) bathroom with layout changes. moving non-load bearing wall. add new shower. relocate double vanity. updating electrical & plumbing. | $9,000 |
| Jun 7, 2021 | Completed final sign-off Nov 2021 | 835 Dolores St | Diaz Construction | 2nd fl: bathroom remodel, addition of a full bath.Details
2nd fl: bathroom remodel, addition of a full bath. | $20,000 |
| Jun 4, 2021 | Never finaled issued Jun 2021, no final | 165 Moffitt St | Mickey Bailey Const., Diaz Construction | kitchen remodel: remove (e) cabinets & replace in kind. install new electric to bring kitche to code. replace plumbing for sink as needed. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3Details
kitchen remodel: remove (e) cabinets & replace in kind. install new electric to bring kitche to code. replace plumbing for sink as needed. no new wall & no existing wall relocation. new lighting shall comply with cec 150.0(k)3 | $30,000 |
| May 16, 2014 | Never finaled issued May 2014, no final | 101 Jefferson St | Diaz Construction | to comply with nov 201473313 tenant improvement, replace light fixtures from flourescent to recessed led, repair sink, paint celilingDetails
to comply with nov 201473313 tenant improvement, replace light fixtures from flourescent to recessed led, repair sink, paint celiling | $4,000 |