Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 216 Roanoke St | Mcdp Dba Geothersun Construction | replacement of existing foundation at the bedroom damage with water intrusionDetails
replacement of existing foundation at the bedroom damage with water intrusion | $25,000 |
| Jan 30, 2026 | In progress filed Jan 2026, not yet issued | 51 Jules Av | convert garage to new adu. relocate (e) water heater to back yard. relocate (e) furnace without the alteration of the ducts. add new electric heat pump water heater for adu. add new heat pump system for heating & cooling of the adu.Details
convert garage to new adu. relocate (e) water heater to back yard. relocate (e) furnace without the alteration of the ducts. add new electric heat pump water heater for adu. add new heat pump system for heating & cooling of the adu. | $120,000 | |
| Dec 24, 2025 | In progress filed Dec 2025, not yet issued | 242 Lobos St | Redwood Valley Construction Inc | remove back sunroom. install code comliant deck. lower half of resdience - change to legal adu. to comply with nov 202421854.Details
remove back sunroom. install code comliant deck. lower half of resdience - change to legal adu. to comply with nov 202421854. | $18,000 |
| Mar 26, 2024 | In progress filed Mar 2024, not yet issued | 2476 Diamond St | Ibuilders Design And Build Inc | install new hatch access point at roof top deck area. 460 sq ft new glass railing around the rooftop. interior remodel for new staircase access 90 sq ft of remodel areaDetails
install new hatch access point at roof top deck area. 460 sq ft new glass railing around the rooftop. interior remodel for new staircase access 90 sq ft of remodel area | $100,000 |
| Feb 14, 2024 | Completed final sign-off May 2024 | 1807 Lake St | Redwood Valley Construction Inc | bathroom repair and remodelDetails
bathroom repair and remodel | $25,000 |
| Aug 2, 2021 | Completed final sign-off Nov 2023 | 3425 Cabrillo St | reduction of scope to pa 201807023579 & 201801098194. only renovated the 1/f floor of (e) dwelling.Details
reduction of scope to pa 201807023579 & 201801098194. only renovated the 1/f floor of (e) dwelling. | ||
| Feb 2, 2021 | Completed final sign-off May 2022 | 80 Estero Av | backyard gazebo on reinforced concrete slab. hexagonal shape. d.i.y. kit. aluminum frame. high impact clear poly-carbonate walls & roof. electrical lighting & receptacles. ref 2020-010590var.Details
backyard gazebo on reinforced concrete slab. hexagonal shape. d.i.y. kit. aluminum frame. high impact clear poly-carbonate walls & roof. electrical lighting & receptacles. ref 2020-010590var. | $18,000 | |
| Jun 29, 2020 | Expired or cancelled cancelled Nov 2024 | 179 Caine Av | Redwood Valley Construction Inc | 221 sq ft rear deck complete replacement, rear stair complete replacement. new foundations for vertical posts, bottom of stairs, and new fire rated walls.Details
221 sq ft rear deck complete replacement, rear stair complete replacement. new foundations for vertical posts, bottom of stairs, and new fire rated walls. | $17,000 |
| Oct 21, 2019 | Expired or cancelled withdrawn Mar 2021 | 737 Naples St | Golden Gate Solar | horizontal addition to the rear of the building. existing unpermitted addition will be demolishedDetails
horizontal addition to the rear of the building. existing unpermitted addition will be demolished | $150,000 |
| Mar 21, 2019 | Completed final sign-off Aug 2019 | 1020 Goettingen St | rev to pa# 201811065201; reducing the number of columsDetails
rev to pa# 201811065201; reducing the number of colums | ||
| Nov 6, 2018 | Completed final sign-off Aug 2019 | 1020 Goettingen St | demolishing the existing stairwell in the back and build a deck in the back with spiral stair.Details
demolishing the existing stairwell in the back and build a deck in the back with spiral stair. | $12,000 | |
| Jul 11, 2018 | Completed final sign-off Dec 2019 | 988 Capp St | Chavarria Construction Inc | replace rotten header of garage, replace rotten beams & post w/ steal frame inside, add new drainage trench, garage upgrade fire rated sheet rock. no wall has been removed, no changes in structural system and lateral resisteive system. stairwell changed in kind.Details
replace rotten header of garage, replace rotten beams & post w/ steal frame inside, add new drainage trench, garage upgrade fire rated sheet rock. no wall has been removed, no changes in structural system and lateral resisteive system. stairwell changed in kind. | $15,000 |
| Feb 5, 2018 | Never finaled issued Jan 2019, no final | 11 El Sereno Ct | voluntary seismic retrofit the entire bldg.Details
voluntary seismic retrofit the entire bldg. | $15,000 | |
| Jan 18, 2018 | Expired or cancelled withdrawn Aug 2024 | 806 Russia Av | Arreglo Construction Inc | addition of (2) bedrooms on 1st floor; addition of (1) bedroom on 2nd floorDetails
addition of (2) bedrooms on 1st floor; addition of (1) bedroom on 2nd floor | $18,000 |
| Dec 13, 2017 | Completed final sign-off Jul 2019 | 80 Yerba Buena Av | to comply with nov 201716982. replace retaining wallDetails
to comply with nov 201716982. replace retaining wall | $15,000 | |
| Sep 29, 2017 | Completed final sign-off Sep 2018 | 3431 Cabrillo St | Handyman Heroes Inc. | to comply with #201793681. remove balcony, close door with siding. remove & replace back stairs.Details
to comply with #201793681. remove balcony, close door with siding. remove & replace back stairs. | $10,000 |
| Aug 24, 2017 | Expired or cancelled withdrawn Jun 2018 | 100 20th Av | soft story retrofit per sfebc chapter 4d. engineering criteria asce 41-13.Details