Dpm Dpm
- Listed as
- architect
- On San Francisco permits
- May 2007 to May 2007
1 permit since 2000 (architect on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 4, 2007 | Completed final sign-off Feb 2008 | 201 11th St | Teevan Company | repairs to be performed in the basement concrete wall corner 11th street with howard street. fill in three windows at 11th street. replace one window at howard street. remove (e) damaged concrete clean steel. re-install the concrete. replace new door main entrance, install railings at 2nd exit stairDetails
repairs to be performed in the basement concrete wall corner 11th street with howard street. fill in three windows at 11th street. replace one window at howard street. remove (e) damaged concrete clean steel. re-install the concrete. replace new door main entrance, install railings at 2nd exit stair | $20,000 |