58 permits since 2000 (contractor on 58 permits, authorized agent-others on 9 permits): 29 completed, 8 in progress, 21 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 146 Jordan Av | Derry Casey Builders Inc | kitchen & bathroom remodel, replace fixtures in kind. all work in kind. interior onlyDetails
kitchen & bathroom remodel, replace fixtures in kind. all work in kind. interior only | $100,000 |
| May 7, 2026 | In progress issued Jun 2026 | 450 Sutter St | Derry Casey Builders Inc | interior workl 24th fl, ste 2428 interior ti to a vacant dental office space. new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work performed on a design build basis as required and submitted as separate permit. no exterior workDetails
interior workl 24th fl, ste 2428 interior ti to a vacant dental office space. new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work performed on a design build basis as required and submitted as separate permit. no exterior work | $300,000 |
| Mar 31, 2026 | In progress issued Apr 2026 | 325 Mason St | Derry Casey Builders Inc | address nov # 202652881: repair (e) 2 hour rated wall at g/f egress stairwell. damage due to vehicular impact. repair wall in-kind.Details
address nov # 202652881: repair (e) 2 hour rated wall at g/f egress stairwell. damage due to vehicular impact. repair wall in-kind. | $3,000 |
| Mar 23, 2026 | In progress issued Jun 2026 | 450 Sutter St | Derry Casey Builders Inc | ste 2118 21st floor: interior work tenant improvement to an (e) dental office space. scope of work includes new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work prerformed on a design-build basis as required & submitted as...Details
ste 2118 21st floor: interior work tenant improvement to an (e) dental office space. scope of work includes new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work prerformed on a design-build basis as required & submitted as... | $225,000 |
| Jun 23, 2025 | In progress issued Jun 2025 | 2257 Filbert St | Derry Casey Builders Inc | replace in kind finishes in 1 kitchen and 1 bathroom. new fixtures including sink and faucets and millwork. no walls moved, removed. no change in existing layout.Details
replace in kind finishes in 1 kitchen and 1 bathroom. new fixtures including sink and faucets and millwork. no walls moved, removed. no change in existing layout. | $90,000 |
| Feb 27, 2025 | In progress issued May 2025 | 2100 Webster St | Derry Casey Builders Inc | 3/fl-suite 331-332- ti for medical offices to include non structrual partitions, finishes, fixtures, equipment and mepDetails
3/fl-suite 331-332- ti for medical offices to include non structrual partitions, finishes, fixtures, equipment and mep | $250,000 |
| Feb 6, 2025 | In progress issued Apr 2025 | 2100 Webster St | Derry Casey Builders Inc | suite 405 on 4/f - creating new non bearing partition walls for reception desk, pre-post op and one operationg room. office includes one accessible all gender toilet. facility includes a medical gas piping system. mep work is included.Details
suite 405 on 4/f - creating new non bearing partition walls for reception desk, pre-post op and one operationg room. office includes one accessible all gender toilet. facility includes a medical gas piping system. mep work is included. | $110,696 |
| Feb 6, 2025 | In progress issued Feb 2025 | 2100 Webster St | Derry Casey Builders Inc | suite 100 - ti to remove and replace (n) finishes, lighting, partition walls and equipmentDetails
suite 100 - ti to remove and replace (n) finishes, lighting, partition walls and equipment | $500,000 |
| May 5, 2023 | Never finaled issued Jul 2023, no final | 450 Sutter St | Derry Casey Builders Inc | dividing an (e)dental office in 2 suites. construct new dmising wall, split suite 2500 and 2550. relocate entry door provide new door for new suite 2550 not occupied presently. rearrange (e) cabinetry and provide accessible sink at staff lounge.Details
dividing an (e)dental office in 2 suites. construct new dmising wall, split suite 2500 and 2550. relocate entry door provide new door for new suite 2550 not occupied presently. rearrange (e) cabinetry and provide accessible sink at staff lounge. | $80,000 |
| Feb 2, 2023 | Completed final sign-off Feb 2024 | 450 Sutter St | Derry Casey Builders Inc | 26/f: revision to pa# 202205194637. new exam room, new restroom, new utility room. reorganize pre-op room layout.Details
26/f: revision to pa# 202205194637. new exam room, new restroom, new utility room. reorganize pre-op room layout. | $50,000 |
| Dec 28, 2022 | Never finaled issued Feb 2023, no final | 350 Ofarrell St | Derry Casey Builders Inc | accessible business entrance program per oridinance 51-16. abe #202207112514. reconfiguration of (e) entry door for d.a. compliance.Details
accessible business entrance program per oridinance 51-16. abe #202207112514. reconfiguration of (e) entry door for d.a. compliance. | $1,000 |
| Dec 28, 2022 | Never finaled issued Feb 2023, no final | 301 Mason St | Derry Casey Builders Inc | accessible business entrance program per oridinance 51-15. abe #202206241710. addition of d.a. call button for attendant and customer interaction.Details
accessible business entrance program per oridinance 51-15. abe #202206241710. addition of d.a. call button for attendant and customer interaction. | $600 |
| May 19, 2022 | Completed final sign-off Feb 2024 | 450 Sutter St | Derry Casey Builders Inc | 26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor.Details
26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor. | $571,360 |
| Mar 18, 2022 | Completed final sign-off Apr 2022 | 2100 Webster St | Derry Casey Builders Inc | interior work: operational permit, new rated gas closet for oxygen & medical air system. reference approved t.i. pa#202006028073. no exterior workDetails
interior work: operational permit, new rated gas closet for oxygen & medical air system. reference approved t.i. pa#202006028073. no exterior work | |
| Mar 11, 2022 | Never finaled issued Feb 2023, no final | 450 Sutter St | Derry Casey Builders Inc | floors 3, 7 thru 26. d.a. compliance w/future ti documentation see included ab-056. technical and infeasibility for main historic entry upper floor restrooms and exit path widths disabled access barrier removals for all gender signage and detectable warnings pads and parking signageDetails
floors 3, 7 thru 26. d.a. compliance w/future ti documentation see included ab-056. technical and infeasibility for main historic entry upper floor restrooms and exit path widths disabled access barrier removals for all gender signage and detectable warnings pads and parking signage | |
| Sep 27, 2021 | Completed final sign-off Mar 2022 | 801 Bush St | Derry Casey Builders Inc | t.i. demo replace extg bar fixture and finishes, new wall and ceiling. new floor accessible upgrade to entry and toilet. clear complaint #202044723,202181658. no change in occupancyDetails
t.i. demo replace extg bar fixture and finishes, new wall and ceiling. new floor accessible upgrade to entry and toilet. clear complaint #202044723,202181658. no change in occupancy | $94,000 |
| Aug 30, 2021 | Completed final sign-off Feb 2023 | 1851 Filbert St | Derry Casey Builders Inc | comply with mandatory seismic retrofit program. 2019 s.f. building code section 4dDetails
comply with mandatory seismic retrofit program. 2019 s.f. building code section 4d | $83,000 |
| Jun 25, 2021 | Never finaled issued Jul 2021, no final | 450 Sutter St | Derry Casey Builders Inc | 20th flr - deferred mep submittal for 2019-1112-6964. sprinkler and fire alarm under sep permits.Details
20th flr - deferred mep submittal for 2019-1112-6964. sprinkler and fire alarm under sep permits. | |
| Mar 17, 2021 | Never finaled issued Jul 2021, no final | 450 Sutter St | Derry Casey Builders Inc | 6th fl: (n) non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. (n) accessible restroom. (n) procedure room & associated service rooms. (n) fire rated common corridor connecting teannt space to egress stair with (n) finishes & light fixtures. no exterior work.Details
6th fl: (n) non-bearing partitions, gypboard & suspended ceiling, casework, fixture & finishes. (n) accessible restroom. (n) procedure room & associated service rooms. (n) fire rated common corridor connecting teannt space to egress stair with (n) finishes & light fixtures. no exterior work. | $700,000 |
| Dec 11, 2020 | Completed final sign-off Mar 2021 | 2190 46th Av | Derry Casey Builders Inc | revision to pa #202008111526 - to clarify existing room name to "storage." no other changesDetails
revision to pa #202008111526 - to clarify existing room name to "storage." no other changes | |
| Aug 11, 2020 | Completed final sign-off Mar 2021 | 2190 46th Av | Derry Casey Builders Inc | in-kind renovation of existing family room and bathroom on level 1. replace plumbing fixtures and cabinets in same location, new finishes and flooring. no changes to the exterior.Details
in-kind renovation of existing family room and bathroom on level 1. replace plumbing fixtures and cabinets in same location, new finishes and flooring. no changes to the exterior. | $18,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 250 Ashton Av | Derry Casey Builders Inc | replace rotten fence. 6' tall.Details
replace rotten fence. 6' tall. | $20,000 |
| Jul 10, 2020 | Completed final sign-off Apr 2022 | 2100 Webster St | Derry Casey Builders Inc | suite # 520: no fire tated partition wall removal, demo partition walls only. finish base floor. exploratory demo remove (10) 3s3 sheatrock holes to explore structural members.Details
suite # 520: no fire tated partition wall removal, demo partition walls only. finish base floor. exploratory demo remove (10) 3s3 sheatrock holes to explore structural members. | $20,000 |
| Jun 2, 2020 | Completed final sign-off Apr 2022 | 2100 Webster St | Derry Casey Builders Inc | suite: 520-interior work: new partitions, gypboard and suspended ceiling, casework and finishes, new accessible restroom, new operating room and associated service rooms for tenant improvement on fifth floor. associated mechanical, electrical, plumbing work. no exterior work.Details
suite: 520-interior work: new partitions, gypboard and suspended ceiling, casework and finishes, new accessible restroom, new operating room and associated service rooms for tenant improvement on fifth floor. associated mechanical, electrical, plumbing work. no exterior work. | $750,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 1269 Howard St | Derry Casey Builders Inc | rev to pa# 201810123039; new lavatory in ground floor accessible restroomDetails
rev to pa# 201810123039; new lavatory in ground floor accessible restroom | |
| Nov 12, 2019 | Never finaled issued Apr 2021, no final | 450 Sutter St | Derry Casey Builders Inc | interior t.i converting (e) suite into 3 smaller suites, work includes demo (e) partitons, installing new partitons doors and sinkDetails
interior t.i converting (e) suite into 3 smaller suites, work includes demo (e) partitons, installing new partitons doors and sink | $120,000 |
| Nov 8, 2019 | Completed final sign-off Dec 2020 | 166 Geary St | Derry Casey Builders Inc | 13th fl: ti of an (e) business space for doctor's office & treatment rooms. interior non-bearing partitions, millwork & interior finishes. mep under separate permit.Details
13th fl: ti of an (e) business space for doctor's office & treatment rooms. interior non-bearing partitions, millwork & interior finishes. mep under separate permit. | $65,000 |
| Sep 30, 2019 | Never finaled issued Oct 2019, no final | 166 Geary St | Derry Casey Builders Inc | ti to unit 1006 on 10th fl create 3 facial room and a break roomDetails
ti to unit 1006 on 10th fl create 3 facial room and a break room | $26,000 |
| Jun 12, 2019 | Completed final sign-off Mar 2021 | 2190 46th Av | Derry Casey Builders Inc | capturing attic level as additonal new habitable space renovation of (e) single family home to include inteiorrenovations, replacement of (2) existing dormers w/(2) new dormers, new windows, new skylights, (2) new interior stairs & new deck & stairs to the rear yard.Details
capturing attic level as additonal new habitable space renovation of (e) single family home to include inteiorrenovations, replacement of (2) existing dormers w/(2) new dormers, new windows, new skylights, (2) new interior stairs & new deck & stairs to the rear yard. | $402,873 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 450 Sutter St | Derry Casey Builders Inc | suite 2225: title 24 compliance. defferred electrical submittal for pa201806262999. maher n/a.Details
suite 2225: title 24 compliance. defferred electrical submittal for pa201806262999. maher n/a. | |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 450 Sutter St | Derry Casey Builders Inc | suite 1212: title 24 compliance. defferred lighting submittal for pa201812148447. maher n/a.Details
suite 1212: title 24 compliance. defferred lighting submittal for pa201812148447. maher n/a. | |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 450 Sutter St | Derry Casey Builders Inc | suite 2414: title 24 compliance. defferred mechanical submittal for pa201809261523. maher n/a.Details
suite 2414: title 24 compliance. defferred mechanical submittal for pa201809261523. maher n/a. | |
| Dec 14, 2018 | Never finaled issued Jan 2019, no final | 450 Sutter St | Derry Casey Builders Inc | 12th fl - suite 1212 interior ti including (n) non-bearing partition, fixtures & finishes in (e) tenant suite to accomodate a medical office. no change of use. mech, elec, plumb, light & life safety work performed on a design-build basis as required & submitted as sep. permits. no ext work. no oshpdDetails
12th fl - suite 1212 interior ti including (n) non-bearing partition, fixtures & finishes in (e) tenant suite to accomodate a medical office. no change of use. mech, elec, plumb, light & life safety work performed on a design-build basis as required & submitted as sep. permits. no ext work. no oshpd | $244,988 |
| Oct 18, 2018 | Never finaled issued Oct 2018, no final | 450 Sutter St | Derry Casey Builders Inc | suite 2314. deferred mep submittal, ref 201806131799Details
suite 2314. deferred mep submittal, ref 201806131799 | |
| Oct 18, 2018 | Never finaled issued Oct 2018, no final | 450 Sutter St | Derry Casey Builders Inc | suite 2340. deferred mep submittal, ref 201806131799Details
suite 2340. deferred mep submittal, ref 201806131799 | |
| Oct 12, 2018 | Completed final sign-off Mar 2020 | 1269 Howard St | Derry Casey Builders Inc | relocate lavatory in ground floor restroom. no other construction. no electrical, lighting, or mechanical. n/a for maherDetails
relocate lavatory in ground floor restroom. no other construction. no electrical, lighting, or mechanical. n/a for maher | $500 |
| Sep 26, 2018 | Never finaled issued Dec 2018, no final | 450 Sutter St | Derry Casey Builders Inc | ste 2414 - a tenant improvement for a dental clinic. new non-load bearing walls and ceiling. partitions for offices, lab, staff & storage rooms, a new split hvac system with distribution, new sinks for treatment areas to be plumbed and electrical systems & lightingDetails
ste 2414 - a tenant improvement for a dental clinic. new non-load bearing walls and ceiling. partitions for offices, lab, staff & storage rooms, a new split hvac system with distribution, new sinks for treatment areas to be plumbed and electrical systems & lighting | $280,000 |
| Aug 20, 2018 | Completed final sign-off Jun 2019 | 2452 Hyde St | Derry Casey Builders Inc | rebuild (e) roof deck @ 2nd floor lightwell to address water damageDetails
rebuild (e) roof deck @ 2nd floor lightwell to address water damage | $8,000 |
| Jun 26, 2018 | Completed final sign-off Aug 2019 | 450 Sutter St | Derry Casey Builders Inc | 22nd flr, suite 2225: ti - 341 sq ft area new non bearing partitions, fixtures, finishes in (e) tenant suite to accomodate medical office. mep/lighting/life saftey under sep permit. no ext work, no oshfdDetails
22nd flr, suite 2225: ti - 341 sq ft area new non bearing partitions, fixtures, finishes in (e) tenant suite to accomodate medical office. mep/lighting/life saftey under sep permit. no ext work, no oshfd | $43,218 |
| Jun 18, 2018 | Completed final sign-off Mar 2019 | 1070 Green St | Derry Casey Builders Inc | replace glazing in (e) steel window frames. new glazing is new energy glass. all work in unit #1402 replace glazing only. no structural change.Details
replace glazing in (e) steel window frames. new glazing is new energy glass. all work in unit #1402 replace glazing only. no structural change. | $30,000 |
| Jun 18, 2018 | Completed final sign-off Mar 2019 | 1070 Green St | Derry Casey Builders Inc | replace glazing in (e) steel window frames. new glazing is low energy glass. all work in unit #502. replace glazing only, no structural change.Details
replace glazing in (e) steel window frames. new glazing is low energy glass. all work in unit #502. replace glazing only, no structural change. | $20,000 |
| Jun 13, 2018 | Never finaled issued Jul 2018, no final | 450 Sutter St | Derry Casey Builders Inc | 23rd fl,suite 2340 - interior ti including (n) non-bearing partitions, fixtures & finishes in (e) medical office. no change of use. mech. plumbing, lighting, & fire alarm submitted as separate permits. no ext work, not oshpd.Details
23rd fl,suite 2340 - interior ti including (n) non-bearing partitions, fixtures & finishes in (e) medical office. no change of use. mech. plumbing, lighting, & fire alarm submitted as separate permits. no ext work, not oshpd. | $84,536 |
| Mar 14, 2018 | Completed final sign-off Aug 2019 | 450 Sutter St | Derry Casey Builders Inc, Derry Casey Builders | 8th flr, suite 808, ~1100 sq ft - ti non bearing partitions, finishes & fixtures in (e) tenant suite to accomodate a dental office - relocation of tenant from another suite w/in bld. mep/loghting/life safety under sep permit as builts. no exteriot work. not oshpd, fire/med gas under separate permitDetails
8th flr, suite 808, ~1100 sq ft - ti non bearing partitions, finishes & fixtures in (e) tenant suite to accomodate a dental office - relocation of tenant from another suite w/in bld. mep/loghting/life safety under sep permit as builts. no exteriot work. not oshpd, fire/med gas under separate permit | $81,444 |
| Mar 5, 2018 | Never finaled issued Dec 2018, no final | 258 09th St | Derry Casey Builders Inc | remove mezzanine in the front. soft demo for extg warehouse. remove unpermitted partitions, stairs & plmg. ada compliance deferred per ab-017. to comply to complaint #201723701.n/a for maherDetails
remove mezzanine in the front. soft demo for extg warehouse. remove unpermitted partitions, stairs & plmg. ada compliance deferred per ab-017. to comply to complaint #201723701.n/a for maher | $10,000 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 450 Sutter St | Derry Casey Builders Inc | unit 1338: deferred lighting t 24 for bpa#201711214478 maher not reqDetails
unit 1338: deferred lighting t 24 for bpa#201711214478 maher not req | |
| Feb 26, 2018 | Completed final sign-off May 2018 | 450 Sutter St | Derry Casey Builders Inc | unit 825: deferred mechanical for 201710201770Details
unit 825: deferred mechanical for 201710201770 | |
| Feb 1, 2018 | Completed final sign-off Dec 2018 | 2299 Post St | Derry Casey Builders Inc, Derry Casey Builders | interior remodel to create 3 offices and upgrade existing non ada restroom to ada complianceDetails
interior remodel to create 3 offices and upgrade existing non ada restroom to ada compliance | $84,000 |
| Jan 30, 2018 | Never finaled issued Feb 2018, no final | 166 Geary St | Derry Casey Builders Inc, Derry Casey Builders | 13th fl - ti of a physician's private office. scope to include new milwork, countertops and fixtures. new finishes throughout, paint; new power, lighting and controlsDetails
13th fl - ti of a physician's private office. scope to include new milwork, countertops and fixtures. new finishes throughout, paint; new power, lighting and controls | $75,000 |
| Dec 6, 2017 | Completed final sign-off May 2018 | 450 Sutter St | Derry Casey Builders Inc, Derry Casey Builders | #825. deferred submittal for electrical t24 for bpa 2017-1020-1770Details
#825. deferred submittal for electrical t24 for bpa 2017-1020-1770 | |
| Nov 21, 2017 | Completed final sign-off May 2018 | 450 Sutter St | Derry Casey Builders Inc, Derry Casey Builders | suite #1338: interior t.i. including (n) non-bearing partitions, fixtures & finishes in (e) tenant suite on 13th fl to accomodate a medical office build out. mep & lighting & life safety work performed on a design build basis as required & submitted as sep. permits. no exterior work. maher naDetails
suite #1338: interior t.i. including (n) non-bearing partitions, fixtures & finishes in (e) tenant suite on 13th fl to accomodate a medical office build out. mep & lighting & life safety work performed on a design build basis as required & submitted as sep. permits. no exterior work. maher na | $25,290 |
| Oct 20, 2017 | Completed final sign-off May 2018 | 450 Sutter St | Derry Casey Builders Inc, Derry Casey Builders | unit 825: interior tenant improvement including new non bearing partitions, fixtures, finishes in e tenant suite on 8th fl to accommodate new dermatology office. mep lighting, life safety on desisn build basis as req and submitted as separate permits. no exterior work. maher n/a.Details
unit 825: interior tenant improvement including new non bearing partitions, fixtures, finishes in e tenant suite on 8th fl to accommodate new dermatology office. mep lighting, life safety on desisn build basis as req and submitted as separate permits. no exterior work. maher n/a. | $71,107 |
| Oct 12, 2017 | Completed final sign-off Jun 2019 | 1070 Green St | Derry Casey Builders Inc, Derry Casey Builders | interior remodel of kitchen, master bath, bath 1 and bath 2. add new closet. new lighting, elec at remodeled areasDetails
interior remodel of kitchen, master bath, bath 1 and bath 2. add new closet. new lighting, elec at remodeled areas | $500,000 |
| Oct 6, 2017 | Completed final sign-off May 2018 | 1770 Lombard St | Derry Casey Builders Inc, Derry Casey Builders | soft story retrofit performed in accordance to 2012 iebc appendix chapter a4Details
soft story retrofit performed in accordance to 2012 iebc appendix chapter a4 | $150,000 |
| Jul 28, 2017 | Completed final sign-off Mar 2019 | 1070 Green St | Derry Casey Builders Inc, Derry Casey Builders | remove finishes, floor, base, cabinets, incl. soft demo exploratory. demo for sturctural observation 500 sq ft. no structural work. no wall modification.Details
remove finishes, floor, base, cabinets, incl. soft demo exploratory. demo for sturctural observation 500 sq ft. no structural work. no wall modification. | $30,000 |
| Jun 6, 2017 | Completed final sign-off Jun 2019 | 1070 Green St | Derry Casey Builders Inc, Derry Casey Builders | demo (e) non bearing partitions, cabinetry, finishes. replace in kind aluminum windows, install new windows at northeast corner,install (n) windows at northeast corner, enlarge (e) northwest balcony, install new sliding doors and windows at northwest balcony.Details
demo (e) non bearing partitions, cabinetry, finishes. replace in kind aluminum windows, install new windows at northeast corner,install (n) windows at northeast corner, enlarge (e) northwest balcony, install new sliding doors and windows at northwest balcony. | $200,000 |
| Oct 28, 2016 | Completed final sign-off Mar 2019 | 1070 Green St | Derry Casey Builders Inc, Derry Casey Builders | exploratory demo to locate structural members. maintain all fire resistance rating at all times.Details
exploratory demo to locate structural members. maintain all fire resistance rating at all times. | $500 |
| Jan 30, 2014 | Never finaled issued Sep 2014, no final | 220 Battery St | Derry Casey Builders Inc, Derry Casey Builders | revision to pa#2012-05-30-1433. repaired store front system matching (e) in kind. new elevator penthouse. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
revision to pa#2012-05-30-1433. repaired store front system matching (e) in kind. new elevator penthouse. compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | $50,000 |
| Aug 29, 2013 | Never finaled issued Sep 2013, no final | 220 Battery St | Derry Casey Builders Inc, Derry Casey Builders | exploratory demolition of dry walls - to investigate structural members for future seismic uprade; remove floor material, tile, trim, ceiling panel, random locations of demolition of drywalls.Details
exploratory demolition of dry walls - to investigate structural members for future seismic uprade; remove floor material, tile, trim, ceiling panel, random locations of demolition of drywalls. | $30,000 |