Dawn Ma
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Q Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Sep 2026
252 permits since 2000 (engineer on 183 permits, architect on 65 permits, authorized agent-others on 4 permits, designer on 2 permits, attorney on 1 permit): 128 completed, 36 in progress, 33 never finaled, 55 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 252.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 535 Brazil Av | revision to permit #202012211450: legalize 1/f unit under state adu program.Details
revision to permit #202012211450: legalize 1/f unit under state adu program. | $100,000 | |
| Jul 30, 2026 | In progress issued Aug 2026 | 227 Roosevelt Wy | Wolfe Painting Co | add 1 (n) wet bar, 1 (remodel) full bath and 1 (n) bedroom on 1st floor. remodel one new full bath.Details
add 1 (n) wet bar, 1 (remodel) full bath and 1 (n) bedroom on 1st floor. remodel one new full bath. | $22,000 |
| Jul 17, 2026 | In progress filed Jul 2026, not yet issued | 2384 Fulton St | revision to bpa: 201911127090 - to remove planned windows at fulton st. side due to back space for last units.Details
revision to bpa: 201911127090 - to remove planned windows at fulton st. side due to back space for last units. | ||
| Jul 13, 2026 | In progress issued Jul 2026 | 655 Corbett Av | Empnc Inc. Dba Empire Community Painting | repair (e) 3 level exterior walkways by removing (e) conc. topping & sheathing with (n) waterproofing deck coating system over (n) sheating. replace (e) wood guard railings w/ metal.Details
repair (e) 3 level exterior walkways by removing (e) conc. topping & sheathing with (n) waterproofing deck coating system over (n) sheating. replace (e) wood guard railings w/ metal. | $150,000 |
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 650 Broderick St | add 4/f to upper unit (#652) create a unit w/ 4 bedrooms and 5 bathrooms. add adu on g/f behind a 2-car garage & storage room. remove (e) exterior stair at grid 2 & c. provide 1-hr rated exit-passageway from rear yard to front sidewalk. (n) rear stairs & deck. revise deck/stair to #202506168801.Details
add 4/f to upper unit (#652) create a unit w/ 4 bedrooms and 5 bathrooms. add adu on g/f behind a 2-car garage & storage room. remove (e) exterior stair at grid 2 & c. provide 1-hr rated exit-passageway from rear yard to front sidewalk. (n) rear stairs & deck. revise deck/stair to #202506168801. | $275,000 | |
| May 11, 2026 | Completed final sign-off Jun 2026 | 2241 Jackson St | refer to bpa: 202311201096 - front windows replacement (24) with metal- clad wood casement.Details
refer to bpa: 202311201096 - front windows replacement (24) with metal- clad wood casement. | ||
| Mar 20, 2026 | Completed final sign-off Sep 2026 | 681 Rockdale Dr | remove (1) existing sink and (1) existing bath tub on g/f. no exterior work, to comply with nov 202545959Details
remove (1) existing sink and (1) existing bath tub on g/f. no exterior work, to comply with nov 202545959 | $1,500 | |
| Feb 26, 2026 | In progress issued Sep 2026 | 112 Sussex St | Peter J. Thomas Construction | convert (e) storage & garage in (e) rear building to (1) adu under state adu program (ca govt. codesection 66314 through 66333). ref #202411144974 & 202109077891Details
convert (e) storage & garage in (e) rear building to (1) adu under state adu program (ca govt. codesection 66314 through 66333). ref #202411144974 & 202109077891 | $5,000 |
| Jan 8, 2026 | Completed final sign-off May 2026 | 4226 23rd St | Salgo Constructions | revision to 202511189886, provide drawings to replace rear stairs.Details
revision to 202511189886, provide drawings to replace rear stairs. | |
| Dec 31, 2025 | Expired or cancelled suspend Aug 2026 | 527 Holly Park Cr | add 1-story addition to inclu new office, 2 bathrooms, 2 bedrooms & interior stairs. interior remodel on basement flr mech room & 2nd flr office room. remove driveway & curb cut. vertical 2/f addition above (e) bldg inclu 74 sqft non-complaint w/sec 242(e).2.c.1 & 16sqft beyond 25% setback. legalizeDetails
add 1-story addition to inclu new office, 2 bathrooms, 2 bedrooms & interior stairs. interior remodel on basement flr mech room & 2nd flr office room. remove driveway & curb cut. vertical 2/f addition above (e) bldg inclu 74 sqft non-complaint w/sec 242(e).2.c.1 & 16sqft beyond 25% setback. legalize | $500,000 | |
| Dec 10, 2025 | In progress filed Dec 2025, not yet issued | 2379 27th Av | convert (e) storage on g/f to adu. provide 1-hr fire rated ceiling & wall. provide 1-hr rated exit-passageway from rear yard to front sidewalk. defferal permit for sprinkler/fire alarm system.Details
convert (e) storage on g/f to adu. provide 1-hr fire rated ceiling & wall. provide 1-hr rated exit-passageway from rear yard to front sidewalk. defferal permit for sprinkler/fire alarm system. | $100,000 | |
| Nov 18, 2025 | In progress issued Feb 2026 | 2870 California St | Crown Construction San Francisco | ref to permits 202506138726, 202311060288. interior revisions (reduce scope). remove non-bearing wall on gl3.1 and 3.3. remove (1) kitchenette. remove restroom #106, remove door# 103c. reconfigure restroom #104.Details
ref to permits 202506138726, 202311060288. interior revisions (reduce scope). remove non-bearing wall on gl3.1 and 3.3. remove (1) kitchenette. remove restroom #106, remove door# 103c. reconfigure restroom #104. | |
| Nov 12, 2025 | Completed final sign-off Jan 2026 | 2137 Grove St | Xspace Builder | #2137: add 2 (n)pocket doors at master bathroom & living room. install shear wall at bathroom. electrical and plumbing work for washer and dryerDetails
#2137: add 2 (n)pocket doors at master bathroom & living room. install shear wall at bathroom. electrical and plumbing work for washer and dryer | $4,600 |
| Nov 6, 2025 | Completed final sign-off May 2026 | 2713 Sutter St | A M K Builders | add a dwelling unit on 1/f under zoning density, provide 1hr fire rated wall and ceiling.Details
add a dwelling unit on 1/f under zoning density, provide 1hr fire rated wall and ceiling. | $2,500 |
| Nov 5, 2025 | In progress filed Nov 2025, not yet issued | 14 30th St | erect rear 2-story type vb detached aduDetails
erect rear 2-story type vb detached adu | $150,000 | |
| Oct 27, 2025 | In progress filed Oct 2025, not yet issued | 14 30th St | Prague Property Management Inc | 1) restore building after fire including a 4th floor verical addition and rear addition.2) extend/repair front entry and steps.3) abate complaint 2019-013357enf.4) deferred submittals: sprinklers (nfpa 13) and fire alarm (separate permit).Details
1) restore building after fire including a 4th floor verical addition and rear addition.2) extend/repair front entry and steps.3) abate complaint 2019-013357enf.4) deferred submittals: sprinklers (nfpa 13) and fire alarm (separate permit). | $1,000,000 |
| Oct 22, 2025 | In progress issued Oct 2025 | 1391 Revere Av | revision to pa#2025-0624-9386 existing building lacking stem wall and footing at rear of building. site: storage first floor and sunroom second floor. add non bearing partition in garage and move door to storage.Details
revision to pa#2025-0624-9386 existing building lacking stem wall and footing at rear of building. site: storage first floor and sunroom second floor. add non bearing partition in garage and move door to storage. | $1,500 | |
| Oct 21, 2025 | In progress issued Jun 2026 | 4451 24th St | Peter J. Thomas Construction | revision permit to #202409181062. to change the mechanical room door location on 1/f.Details
revision permit to #202409181062. to change the mechanical room door location on 1/f. | $800 |
| Oct 2, 2025 | In progress issued Dec 2025 | 571 Monterey Bl | Ideal Builders | upper floor - kitchen and bathroom remodel. removal of powder room. lower floor - bathroom remodel. removal of kitchenette and replace with laundry closet.Details
upper floor - kitchen and bathroom remodel. removal of powder room. lower floor - bathroom remodel. removal of kitchenette and replace with laundry closet. | $400,000 |
| Sep 10, 2025 | In progress issued Nov 2025 | 129 Cabrillo St | Kyle Wong Construction | add 2 skylights on roof.Details
add 2 skylights on roof. | $1,000 |
| Jul 15, 2025 | Completed final sign-off Jul 2025 | 114 Sussex St | Peter J. Thomas Construction | revise windows sizes & redesign rear shearwalls to remove pull test requirement. ref pa # 2020-1109-8467Details
revise windows sizes & redesign rear shearwalls to remove pull test requirement. ref pa # 2020-1109-8467 | |
| Jul 8, 2025 | Completed final sign-off Mar 2026 | 2258 47th Av | Mc Gowan Builders | construct 9'-3" tall new deck with 2 firewall in rear deck.Details
construct 9'-3" tall new deck with 2 firewall in rear deck. | $3,500 |
| Jul 1, 2025 | Completed final sign-off Aug 2025 | 1595 Treat Av | revision to pa#202504073804, addition of 1 layer of drywall. revision on new acoustic sealant by green glue and new one layer 5/8 type x g.w.b.Details
revision to pa#202504073804, addition of 1 layer of drywall. revision on new acoustic sealant by green glue and new one layer 5/8 type x g.w.b. | ||
| Jun 23, 2025 | In progress filed Jun 2025, not yet issued | 3515 Judah St | 1- renovate (e) 2 dwelling units w/ (n) 4th fl additions.2- add 1 (n) unit on 3rd & 4th flr,add 1(n) unit on 1st flr pursuant to legislation/density exception.3- add exit passagewy & rebuild common stairs to meet code.4- add (n) bicycle storage at entrance & trash enclosure @ rear yard.nov201726791.Details
1- renovate (e) 2 dwelling units w/ (n) 4th fl additions.2- add 1 (n) unit on 3rd & 4th flr,add 1(n) unit on 1st flr pursuant to legislation/density exception.3- add exit passagewy & rebuild common stairs to meet code.4- add (n) bicycle storage at entrance & trash enclosure @ rear yard.nov201726791. | $500,000 | |
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 1546 Dolores St | rebuild e wood rear stairs and replace existing fence as needed at valley st. no interior work.Details
rebuild e wood rear stairs and replace existing fence as needed at valley st. no interior work. | $8,000 | |
| Jun 16, 2025 | In progress issued Jul 2025 | 650 Broderick St | construct rear decks and stairs for (e) second and third floors within required rear yard setback. no work at front facade, no interior work.Details
construct rear decks and stairs for (e) second and third floors within required rear yard setback. no work at front facade, no interior work. | $20,000 | |
| Jun 16, 2025 | Completed final sign-off Dec 2025 | 1617 09th Av | revision to approved permit 202506168781. construct all weather cover over deck. compy with no compliant#: 202181193Details
revision to approved permit 202506168781. construct all weather cover over deck. compy with no compliant#: 202181193 | $1,500 | |
| Jun 13, 2025 | In progress issued Aug 2025 | 2870 California St | Crown Construction San Francisco | revision 202311060288, interior: mech rm/commercial restroom layout revision. front facade revision gr fl, revised commerial storefront windows, stl post layout.front brick facade 2nd/3rd fl,window opening repair, mech/elec revision, new mech heat pump system w rtu structuDetails
revision 202311060288, interior: mech rm/commercial restroom layout revision. front facade revision gr fl, revised commerial storefront windows, stl post layout.front brick facade 2nd/3rd fl,window opening repair, mech/elec revision, new mech heat pump system w rtu structu | $65,000 |
| Apr 7, 2025 | Completed final sign-off Jul 2025 | 1595 Treat Av | to permit basement full bathroom bathtub & wet bar - conversion of entretainment room to new bedroom on the ground floorDetails
to permit basement full bathroom bathtub & wet bar - conversion of entretainment room to new bedroom on the ground floor | $350 | |
| Mar 26, 2025 | In progress filed Mar 2025, not yet issued | 645 Pacheco St | add (n) 1-story attached adu with 2-bedroom over garage at the front of property, remove (e) roof, add 2-bedrooms and 2-bathrooms on 3/f, add (n) 2-car garage. deferred fire sprinklers, mech, elec & pump.Details
add (n) 1-story attached adu with 2-bedroom over garage at the front of property, remove (e) roof, add 2-bedrooms and 2-bathrooms on 3/f, add (n) 2-car garage. deferred fire sprinklers, mech, elec & pump. | $500,000 | |
| Mar 13, 2025 | In progress issued Dec 2025 | 2870 California St | Crown Construction San Francisco | revision to 202311060288. remove sprinkler notes on sheet co2. existing bldg not sprinklered. sprinklers not required.Details
revision to 202311060288. remove sprinkler notes on sheet co2. existing bldg not sprinklered. sprinklers not required. | |
| Mar 13, 2025 | In progress issued Sep 2025 | 1990 Lombard St | T Prior Building Co | a per planning code sec 712 nc-5 change of use from 1/f restaurant to entertainment/nighttime.Details
a per planning code sec 712 nc-5 change of use from 1/f restaurant to entertainment/nighttime. | |
| Mar 7, 2025 | In progress filed Mar 2025, not yet issued | 970 Folsom St | renovate existing floor office to co-working space. add 2nd exit. add new urinal, add new mop sink, add new entry platform, and modify existing steps at platform.Details
renovate existing floor office to co-working space. add 2nd exit. add new urinal, add new mop sink, add new entry platform, and modify existing steps at platform. | $8,500 | |
| Mar 5, 2025 | In progress issued Mar 2025 | 2870 California St | Crown Construction San Francisco | replace 8 front window in kind.Details
replace 8 front window in kind. | $25,000 |
| Mar 4, 2025 | In progress issued Mar 2025 | 2384 Fulton St | Kobuksan Construction | first floor (ref 202211176715) - to include adding hardie siding. unit a- addition of 1 (n) window opening located in kitchen. unit b- relocate kitchen . second floor (ref 202009204569) unit 1 - 2x bathroom remodel to include relocate sinks and toilets.Details
first floor (ref 202211176715) - to include adding hardie siding. unit a- addition of 1 (n) window opening located in kitchen. unit b- relocate kitchen . second floor (ref 202009204569) unit 1 - 2x bathroom remodel to include relocate sinks and toilets. | $5,000 |
| Jan 21, 2025 | Expired or cancelled cancelled Feb 2025 | 14 30th St | construct detached rear adu, single family dwelling, 2-story, type 5b, with 2-bedrooms. deferred new fire sprinklers & fire alarm under separate permit.Details
construct detached rear adu, single family dwelling, 2-story, type 5b, with 2-bedrooms. deferred new fire sprinklers & fire alarm under separate permit. | $150,000 | |
| Jan 15, 2025 | Completed final sign-off Jan 2025 | 2505 24th St | this permit is for the change of use from the former laundry business to retail professional service d.b.a ww consulting service, under sfpc sec 763. business involves dental career and business consultation and are avail to the public. the cou is to abate planning enforcement case 2004-00737 enf.Details
this permit is for the change of use from the former laundry business to retail professional service d.b.a ww consulting service, under sfpc sec 763. business involves dental career and business consultation and are avail to the public. the cou is to abate planning enforcement case 2004-00737 enf. | ||
| Jan 15, 2025 | Completed final sign-off Nov 2025 | 831 38th Av | Shelter Cove Construction | interior kitchen remodel including removal of walls at 2nd fl. no exterior workDetails
interior kitchen remodel including removal of walls at 2nd fl. no exterior work | $25,000 |
| Dec 23, 2024 | Completed final sign-off Feb 2025 | 2162 Union St | g/f -remove 3 non-load bearing interior partition walls in vacant retail space per sfdbi ab-017. no construction proposed or authorized, no change of use or occupancy, vacant retail space to remain. soft demo.Details
g/f -remove 3 non-load bearing interior partition walls in vacant retail space per sfdbi ab-017. no construction proposed or authorized, no change of use or occupancy, vacant retail space to remain. soft demo. | $10,000 | |
| Dec 17, 2024 | In progress issued Aug 2025 | 80 Linares Av | Curran & Associates General Contractors | raise (e) roof to increase ceiling height to 9'-0", thereby increasing the roof ridge line 7'-0" from (e), add (2) bedrooms, (1) bathroom & living space. replace all windows w/ alum-clad wood casement with mullionsDetails
raise (e) roof to increase ceiling height to 9'-0", thereby increasing the roof ridge line 7'-0" from (e), add (2) bedrooms, (1) bathroom & living space. replace all windows w/ alum-clad wood casement with mullions | $350,000 |
| Nov 12, 2024 | In progress issued Nov 2024 | 651 03rd Av | fire place demolition on all three stories.Details
fire place demolition on all three stories. | $9,000 | |
| Nov 11, 2024 | In progress issued Jul 2025 | 4451 24th St | Peter J. Thomas Construction | legalize (1) dwelling unit on 1/f (under state adu program). (n) sprinklers under separate permit per sfbc 2022. provide nfpa 13 sprinklersDetails
legalize (1) dwelling unit on 1/f (under state adu program). (n) sprinklers under separate permit per sfbc 2022. provide nfpa 13 sprinklers | $7,500 |
| Oct 29, 2024 | Completed final sign-off Apr 2025 | 515 Jersey St | Platinum Premier Construction Inc | remodel existing kitchen: reface cabinets, new countertops,new appliances, open wall between dining and kitchen.Details
remodel existing kitchen: reface cabinets, new countertops,new appliances, open wall between dining and kitchen. | $7,500 |
| Aug 27, 2024 | In progress issued Nov 2024 | 129 Cabrillo St | Kyle Wong Construction | revision to pa#: 202404260913 due to site discovery: shared footing w/adju bldg (gl a). (e) floor jorst are 2x10; revise beams #103, 108, 113, 114; reference geogrout permit 2024-1022-3443 (123 cabrillo st)Details
revision to pa#: 202404260913 due to site discovery: shared footing w/adju bldg (gl a). (e) floor jorst are 2x10; revise beams #103, 108, 113, 114; reference geogrout permit 2024-1022-3443 (123 cabrillo st) | |
| Aug 8, 2024 | In progress issued Aug 2024 | 2384 Fulton St | Kobuksan Construction | revision to previously approved soft story pa 201710252274 based on site revisions and approved adu permit 201911127090.Details
revision to previously approved soft story pa 201710252274 based on site revisions and approved adu permit 201911127090. | |
| Aug 1, 2024 | In progress issued Sep 2024 | 2241 Jackson St | Apex America Gc Inc | ref adu pa#202403087376 & 202311201096. this permit is to amend all structural work under prev. approved adu permit to support the approved condition. the struct. scope include: 1. (n) plywd shearwall on 2nd and 3rd floor, 2. rebuild (e) side egress stair 3. provide (n)ftg for 1-hr rated wallDetails
ref adu pa#202403087376 & 202311201096. this permit is to amend all structural work under prev. approved adu permit to support the approved condition. the struct. scope include: 1. (n) plywd shearwall on 2nd and 3rd floor, 2. rebuild (e) side egress stair 3. provide (n)ftg for 1-hr rated wall | |
| Jun 25, 2024 | Expired or cancelled suspend Apr 2025 | 970 Folsom St | change of use from warehouse (f) to office (b). add a new interior ada ramp, add a second exit behind an existing garage door for a new cafeDetails
change of use from warehouse (f) to office (b). add a new interior ada ramp, add a second exit behind an existing garage door for a new cafe | $100,000 | |
| Jun 6, 2024 | Expired or cancelled cancelled Jul 2024 | 645 Pacheco St | add (n) 1-story detached adu w/ 2 bed over garage at the front of property. remove (e) roof, add 2 bed & 2 bath on 3/f, add rear roof deck on 2/f. add (n) 2-car garage. deferred permits:1.fire sprinklers 2.mech, elec & pumpDetails
add (n) 1-story detached adu w/ 2 bed over garage at the front of property. remove (e) roof, add 2 bed & 2 bath on 3/f, add rear roof deck on 2/f. add (n) 2-car garage. deferred permits:1.fire sprinklers 2.mech, elec & pump | $500,000 | |
| Apr 26, 2024 | In progress issued Jul 2024 | 129 Cabrillo St | Kyle Wong Construction | ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground flDetails
ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground fl | $175,000 |
| Mar 21, 2024 | In progress issued Jun 2024 | 2241 Jackson St | Apex America Gc Inc | ab1114 - separate (e) merge unit (pa# 787852) into 2 by creating new unit #2 on 2/f under adu state program. rebuild stair on 1/f & add a new 1-hr rated fire wall. deferred submittals: (n) sprinklers per sfbc 2022 & nfpa 13 sprinkler per cbc 1028.Details
ab1114 - separate (e) merge unit (pa# 787852) into 2 by creating new unit #2 on 2/f under adu state program. rebuild stair on 1/f & add a new 1-hr rated fire wall. deferred submittals: (n) sprinklers per sfbc 2022 & nfpa 13 sprinkler per cbc 1028. | $225,000 |
| Mar 5, 2024 | Completed final sign-off Nov 2024 | 3369 Cesar Chavez St | revision to pa 202207158642 remove sprinkler requirement at exit passageway as existing bldg is not sprinklered. removed the laundry doorDetails
revision to pa 202207158642 remove sprinkler requirement at exit passageway as existing bldg is not sprinklered. removed the laundry door | ||
| Jan 29, 2024 | Completed final sign-off Jun 2024 | 239 Chattanooga St | Luxury Construction Llc | revision to 202204262988. repair and replace front yard retaining wall foundation and related dryrot in wood framingDetails
revision to 202204262988. repair and replace front yard retaining wall foundation and related dryrot in wood framing | $7,598 |
| Jan 5, 2024 | Expired or cancelled cancelled Mar 2024 | 652 Broderick St | construct rear decks and stairs for (e) second and third floors w/in req. rear setback. stairs to roof for solar panels maintenance (to be installed). no work at front facade, no interior work.Details
construct rear decks and stairs for (e) second and third floors w/in req. rear setback. stairs to roof for solar panels maintenance (to be installed). no work at front facade, no interior work. | $50,000 | |
| Jan 3, 2024 | Completed final sign-off Jul 2026 | 212 Head St | add: 1 adu on basement-unit#3.(n) 1-hr rated exit passageway to public right of way. abate complaints: 2020-001593enf change of use from sfd to 2 units, 201802361 leagalization of unit, 202011915 obtain abatement permit, 202011611 leagalization of unit, g202014131 legalize (e) rear fire escape.Details
add: 1 adu on basement-unit#3.(n) 1-hr rated exit passageway to public right of way. abate complaints: 2020-001593enf change of use from sfd to 2 units, 201802361 leagalization of unit, 202011915 obtain abatement permit, 202011611 leagalization of unit, g202014131 legalize (e) rear fire escape. | $10,000 | |
| Dec 26, 2023 | Completed final sign-off Oct 2024 | 219 06th Av | Seth Bernstein | extg composite beam connection reinforcement from site-discoveryDetails
extg composite beam connection reinforcement from site-discovery | $2,500 |
| Nov 30, 2023 | Completed final sign-off Sep 2024 | 3369 Cesar Chavez St | Peter J. Thomas Construction | convert a 10' -7' x 15' -0" garage (e) garage door and curb cut to remain. revert to last legal condition approx 158 sq ft garageDetails
convert a 10' -7' x 15' -0" garage (e) garage door and curb cut to remain. revert to last legal condition approx 158 sq ft garage | $7,500 |
| Nov 20, 2023 | In progress issued Mar 2024 | 2241 Jackson St | Apex America Gc Inc | to comply with nov# 202315477: (3) units remodeling (#1, 3, 5) interior works only. replace all windows in kind.Details
to comply with nov# 202315477: (3) units remodeling (#1, 3, 5) interior works only. replace all windows in kind. | $210,000 |
| Nov 14, 2023 | Completed final sign-off Sep 2024 | 360 Elizabeth St | Skye's The Limit Construction | rebuild (e) front stairs. in-kind, new end at stairsDetails
rebuild (e) front stairs. in-kind, new end at stairs | $6,500 |
| Nov 14, 2023 | Completed final sign-off Apr 2024 | 970 Folsom St | Tom Can Construction | add an approximately 14ft x 21 ft with 10 ft ceiling for an interior storage room.Details
add an approximately 14ft x 21 ft with 10 ft ceiling for an interior storage room. | $7,500 |
| Nov 9, 2023 | Completed final sign-off Dec 2024 | 2241 Jackson St | soft story upgrade in compliance with mandatory ordinance per sfc ch.34b to comply with nov 201989501Details
soft story upgrade in compliance with mandatory ordinance per sfc ch.34b to comply with nov 201989501 | $65,000 | |
| Nov 6, 2023 | In progress issued Mar 2025 | 2870 California St | Crown Construction San Francisco | voluntary structural improvement @ 1st & basement levels.(n) bldg storage @ basement. add ada ramp inside storefront in compliance w/ abe program,install 2 (n) unisex restrm, 1 janitor closet, 2 kitchenette, replace 6 (e) skylight, add 2 skylight, create a rated passagDetails
voluntary structural improvement @ 1st & basement levels.(n) bldg storage @ basement. add ada ramp inside storefront in compliance w/ abe program,install 2 (n) unisex restrm, 1 janitor closet, 2 kitchenette, replace 6 (e) skylight, add 2 skylight, create a rated passag | $1,000,000 |
| Sep 27, 2023 | Completed final sign-off Oct 2023 | 1214 47th Av | Shelter Cove Construction | revision to 202205114004. remove work at entry foyer. add 1 window at rear office on 1st sf. reduce shearwalls at rear wallDetails
revision to 202205114004. remove work at entry foyer. add 1 window at rear office on 1st sf. reduce shearwalls at rear wall | |
| Aug 14, 2023 | Completed final sign-off Sep 2023 | 263 16th Av | Freemodel Inc. | revision to pa202209162643. moving kitchen sink location. moving microwave location. converting double vanity to single. engineering revision (minor).Details
revision to pa202209162643. moving kitchen sink location. moving microwave location. converting double vanity to single. engineering revision (minor). | |
| Aug 11, 2023 | Completed final sign-off Jul 2026 | 2555 Leavenworth St | Current Construction | legalize and extend the roof deck to 406 sf. (<500 sf). provide 2 means of egress from roof deck to existing egress stairs and fire escape facing leavenworth st. provide handrails along both egress paths on roof. ref #202507211261 for fire escape.Details
legalize and extend the roof deck to 406 sf. (<500 sf). provide 2 means of egress from roof deck to existing egress stairs and fire escape facing leavenworth st. provide handrails along both egress paths on roof. ref #202507211261 for fire escape. | $35,000 |
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 150 Bocana St | 1/f: add new bathroomDetails
1/f: add new bathroom | $9,000 | |
| May 8, 2023 | Completed final sign-off Jan 2024 | 2147 Mason St | Mireles Construction Inc | remove 1 post in kitchen and replace with a beam reomve half counter wall, extend cabinets from (e) to far wall, replace (e) cabinets in-kind with newDetails
remove 1 post in kitchen and replace with a beam reomve half counter wall, extend cabinets from (e) to far wall, replace (e) cabinets in-kind with new | $4,300 |
| May 3, 2023 | Completed final sign-off Jun 2023 | 2223 47th Av | legalize (1) wet bar on ground floor.Details
legalize (1) wet bar on ground floor. | ||
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 2384 Fulton St | to comply with nov# 202304299 (ref pa# 202211176715 & 201911127090), permeable grouting is required at adj neighbor bldgs prior to retaining wall installation along gridlines a&7, provide lagging & bracing @ property line, revise retaining wall adj to north property.Details
to comply with nov# 202304299 (ref pa# 202211176715 & 201911127090), permeable grouting is required at adj neighbor bldgs prior to retaining wall installation along gridlines a&7, provide lagging & bracing @ property line, revise retaining wall adj to north property. | $3,500 | |
| Feb 6, 2023 | Completed final sign-off Jun 2023 | 65 Greenwood Av | Pacific Construction Company Inc | revision to pa 2022-0106-5456; add (n) footing & slab under entry stairs to support entry porch only; remove work in attic. no changes in ceiling in area of work.Details
revision to pa 2022-0106-5456; add (n) footing & slab under entry stairs to support entry porch only; remove work in attic. no changes in ceiling in area of work. | |
| Feb 2, 2023 | Completed final sign-off Sep 2023 | 263 16th Av | Freemodel Inc. | revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel.Details
revision to no plan pa# 202209162643. moving wall 6" and adding toilet to bathroom. expanding w.c. into bedroom closet to add bathtub + sink. powder room moving sink, replacing toilet. kitchen taking down wall between kitchen & dining. full kitchen remodel. | |
| Nov 17, 2022 | Never finaled issued Mar 2023, no final | 2384 Fulton St | revision to pa# 201911127090. revision to kitchen and bath location in adu. no change in unit.Details
revision to pa# 201911127090. revision to kitchen and bath location in adu. no change in unit. | $5,000 | |
| Nov 16, 2022 | In progress issued Aug 2025 | 119 16th Av | add 1 story to upper unit (119 16th ave). add 3 bedrooms and 2 bathrooms on ground floor (121 16th ave) behind garage with interior connecting stairs. 13'-8" rear extebsion on ground floor only. add (n) rear deck on 3/f upper unit with spiral stairs. relocate rear deck stairs.Details
add 1 story to upper unit (119 16th ave). add 3 bedrooms and 2 bathrooms on ground floor (121 16th ave) behind garage with interior connecting stairs. 13'-8" rear extebsion on ground floor only. add (n) rear deck on 3/f upper unit with spiral stairs. relocate rear deck stairs. | $300,000 | |
| Oct 28, 2022 | Completed final sign-off Jun 2023 | 1860 Mcallister St | (n) opening between (e) kitchen & living room.Details
(n) opening between (e) kitchen & living room. | $7,500 | |
| Oct 13, 2022 | Completed final sign-off Apr 2023 | 652 Guerrero St | Flmc Development Corp Dba Adamo Campagna | site revision to previous boa 2021-1029-1438 1st floor work only; relocate water heaters; reconfigure bathroom, wetbar & storage layout; exterior changes @ rearDetails
site revision to previous boa 2021-1029-1438 1st floor work only; relocate water heaters; reconfigure bathroom, wetbar & storage layout; exterior changes @ rear | |
| Oct 12, 2022 | Never finaled issued Apr 2023, no final | 2823 Laguna St | Plus One Construction Inc, Gil Construction & Assoc Inc. | 3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf.Details
3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf. | $15,000 |
| Sep 26, 2022 | Completed final sign-off Mar 2023 | 1978 Filbert St | M And R Home Remodeling Inc | interior remodel kitchen & bath. interior finishes to be replaced, electrical to be updated. insulate walls. seismic update to support remodel of kitchen.Details
interior remodel kitchen & bath. interior finishes to be replaced, electrical to be updated. insulate walls. seismic update to support remodel of kitchen. | $180,000 |
| Jul 15, 2022 | Completed final sign-off Feb 2025 | 3369 Cesar Chavez St | create 1 hour rated exit passageway in front of building. ref 202205164297 for rear cottage legalization in process. def sumittal: 1 new sprinlkersDetails
create 1 hour rated exit passageway in front of building. ref 202205164297 for rear cottage legalization in process. def sumittal: 1 new sprinlkers | $5,000 | |
| May 25, 2022 | Completed final sign-off Jun 2023 | 80 Linares Av | Curran & Associates General Contractors | revision to 202112144383. revision to rear deck due to site conditions. abatemenet of 2022004507 enf & complaint 202290110. this revision set applies to rear deck only. no changes to buildingDetails
revision to 202112144383. revision to rear deck due to site conditions. abatemenet of 2022004507 enf & complaint 202290110. this revision set applies to rear deck only. no changes to building | $10,000 |
| May 16, 2022 | Completed final sign-off Feb 2025 | 3369 Cesar Chavez St | legalization of rear unit structure 396sf with 1 bathroom, kitchenette, bedroom. new 1h exit passageway through front 2-story building under pa#202403057131. 2023-1130-1688. to comply with nov20218376 his nov penalty. (ref 202311301688 coverting e garage)Details
legalization of rear unit structure 396sf with 1 bathroom, kitchenette, bedroom. new 1h exit passageway through front 2-story building under pa#202403057131. 2023-1130-1688. to comply with nov20218376 his nov penalty. (ref 202311301688 coverting e garage) | $20,000 | |
| May 11, 2022 | Completed final sign-off Oct 2023 | 1214 47th Av | Shelter Cove Construction | 1st floor remodel within existing footprint. changing existing 1st fl to office/ laundry/ bathroom. new rear windows & doors. raise fl @ bedroom closet @ 2nd fl.Details
1st floor remodel within existing footprint. changing existing 1st fl to office/ laundry/ bathroom. new rear windows & doors. raise fl @ bedroom closet @ 2nd fl. | $95,000 |
| Apr 26, 2022 | Completed final sign-off Jun 2024 | 239 Chattanooga St | Seth Bernstein | proposed revision to bpa 2021-0317-6777 (adu) to repair & replace 35' of foundation, beam & posts @ basement level & related dryrot & alter the length of proposed front stairsDetails
proposed revision to bpa 2021-0317-6777 (adu) to repair & replace 35' of foundation, beam & posts @ basement level & related dryrot & alter the length of proposed front stairs | $5,000 |
| Apr 20, 2022 | Never finaled issued Sep 2022, no final | 841 14th St | legalize one 60-min fire rated window at property line in bathroom. window to be w-60 fire resistance rated glazing. ab-009 not required. ab-009 not required. window meets wall assembly criteria.Details
legalize one 60-min fire rated window at property line in bathroom. window to be w-60 fire resistance rated glazing. ab-009 not required. ab-009 not required. window meets wall assembly criteria. | $500 | |
| Apr 14, 2022 | Expired or cancelled expired Oct 2023 | 430 West Portal Av | add new window to 1st floor. interior remodel to 1st floor. add new window to 2nd floor. interior remodel to 2nd floor. interior remodel to 3rd floor add new bathroom. all new windows not street visible.Details
add new window to 1st floor. interior remodel to 1st floor. add new window to 2nd floor. interior remodel to 2nd floor. interior remodel to 3rd floor add new bathroom. all new windows not street visible. | $60,000 | |
| Mar 25, 2022 | Completed final sign-off Jul 2024 | 1661 Palou Av | Carter's Construction Co | revision to pa202112144359 per site discovery. structural footing revisions.Details
revision to pa202112144359 per site discovery. structural footing revisions. | $15,000 |
| Mar 10, 2022 | Never finaled issued Apr 2023, no final | 648 Castro St | Rei Build Up Construction Corporation | structural revision work only. revision to pa 201709158461 and 201903195709.Details
structural revision work only. revision to pa 201709158461 and 201903195709. | |
| Feb 24, 2022 | Completed final sign-off Oct 2023 | 430 West Portal Av | Tom Can Construction | infill 18 sf on 2nd fl (n) pantry. replace (e) window & double door to (n) windows on 2nd fl.Details
infill 18 sf on 2nd fl (n) pantry. replace (e) window & double door to (n) windows on 2nd fl. | $22,500 |
| Jan 19, 2022 | Expired or cancelled withdrawn Feb 2022 | 500 Noriega St | add new spiral interior stairs to connect 1/f to 2/f. add new wet bar to 1/f.Details
add new spiral interior stairs to connect 1/f to 2/f. add new wet bar to 1/f. | $5,000 | |
| Dec 28, 2021 | Expired or cancelled cancelled Sep 2024 | 1714 Grant Av | foundation revision to building permit 2018 0102 7720.Details
foundation revision to building permit 2018 0102 7720. | ||
| Dec 22, 2021 | Expired or cancelled withdrawn Nov 2022 | 198 Bonview St | (e) kitchen remodel including kitchen opening to dining rm with header and beamDetails
(e) kitchen remodel including kitchen opening to dining rm with header and beam | $3,500 | |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 80 Linares Av | remodel (e) kitchen, open wall between kitchen & dining room; remodel (e) laundry room & add 1 bathroom @ 1st floor; new deck 3' max above existing grade.Details
remodel (e) kitchen, open wall between kitchen & dining room; remodel (e) laundry room & add 1 bathroom @ 1st floor; new deck 3' max above existing grade. | $45,000 | |
| Dec 7, 2021 | Completed final sign-off Dec 2022 | 1400 16th Av | Peter J. Thomas Construction | lower unit kitchen & bathroom remodel. seal up (e) door to garage w/ 1 hr rated wall.Details
lower unit kitchen & bathroom remodel. seal up (e) door to garage w/ 1 hr rated wall. | $10,000 |
| Nov 24, 2021 | Completed final sign-off Aug 2024 | 1125 Broderick St | Andrew Mark Construction Inc | exterior work: remove (e) retractable skylight. provide new roof top stair enclosure with windows & skylights. replace in kind (e) roof deck. provide new transparent glass windscreens & guardrails on (e) deck. interior work: replace (e) roof access stair. renovate 1st fl entry stair.Details
exterior work: remove (e) retractable skylight. provide new roof top stair enclosure with windows & skylights. replace in kind (e) roof deck. provide new transparent glass windscreens & guardrails on (e) deck. interior work: replace (e) roof access stair. renovate 1st fl entry stair. | $200,000 |
| Nov 18, 2021 | Completed final sign-off Apr 2022 | 838 Bay St | Mulhall Construction Inc. | soft story upgrade in compliance with mandotory ordiance per sfbc ch 34b. abate complaint #201986892.Details
soft story upgrade in compliance with mandotory ordiance per sfbc ch 34b. abate complaint #201986892. | $30,000 |
| Nov 15, 2021 | Completed final sign-off Mar 2023 | 793 Chenery St | Peter J. Thomas Construction | two new windows,45 min fire rated windows along property line. voluntary structural reinforcement at garage level.Details
two new windows,45 min fire rated windows along property line. voluntary structural reinforcement at garage level. | $6,000 |
| Oct 29, 2021 | Completed final sign-off Apr 2023 | 652 Guerrero St | Flmc Development Corp Dba Adamo Campagna | remodel of bldg storage behind garage. to add a web bar & half bath. relocation.Details
remodel of bldg storage behind garage. to add a web bar & half bath. relocation. | $70,000 |
| Oct 5, 2021 | Never finaled filed Oct 2021, never issued | 151 Lobos St | 2f horizontal front addition to enlarge living room. upgrade first to second floor stairs to meet code. facade modification (no historic resource present per san francisco preservationDetails
2f horizontal front addition to enlarge living room. upgrade first to second floor stairs to meet code. facade modification (no historic resource present per san francisco preservation | $100,000 | |
| Sep 7, 2021 | Completed final sign-off Apr 2025 | 114 Sussex St | Peter J. Thomas Construction | garage structural improvement- excavate crawl space to create 7ft ceiling height. add toilet to extg garage for storage room onlyDetails
garage structural improvement- excavate crawl space to create 7ft ceiling height. add toilet to extg garage for storage room only | $60,000 |
| Sep 3, 2021 | Completed final sign-off May 2022 | 424 Frederick St | Tom Can Construction | add (n) windows in living room on 2nd and 3nd flDetails
add (n) windows in living room on 2nd and 3nd fl | $2,500 |
| Aug 11, 2021 | Expired or cancelled cancelled Apr 2022 | 212 Head St | voluntary seismic retrofit on basement fl only. per iebc appex a4, ab 094Details
voluntary seismic retrofit on basement fl only. per iebc appex a4, ab 094 | $5,000 | |
| Jul 13, 2021 | Expired or cancelled expired May 2026 | 503 Congo St | Curran & Associates General Contractors | 3/f addition for 1 bedroom & 1 bathroom. roof deck and green roof over front setback. kitchen remodel, opening kitchen wall to dining room. existing bathroom remodel on 2/f.Details
3/f addition for 1 bedroom & 1 bathroom. roof deck and green roof over front setback. kitchen remodel, opening kitchen wall to dining room. existing bathroom remodel on 2/f. | $100,000 |