David Rossi
- Listed as
- engineer
- Firm
- Kpff
- On San Francisco permits
- Dec 2019 to Sep 2026
16 permits since 2000 (engineer on 16 permits): 7 completed, 8 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2026 | In progress filed Sep 2026, not yet issued | 650 Davis St | Field Construction Inc. | 2nd fl, ste 205 structural for pa 202601304901Details
2nd fl, ste 205 structural for pa 202601304901 | $40,000 |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 100 Stockton St | 1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing.Details
1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing. | $14,150,000 | |
| May 21, 2026 | In progress issued Jul 2026 | 100 Stockton St | Novo Construction Inc | shoring and demo. levels 1-3 interior.Details
shoring and demo. levels 1-3 interior. | $173,545 |
| May 20, 2026 | In progress issued Aug 2026 | 888 Tennessee St | Hi-Top Construction Inc | (n) gantry installation in (e) space. no (n) enclosures or changes to egress or existing.Details
(n) gantry installation in (e) space. no (n) enclosures or changes to egress or existing. | $32,000 |
| Apr 30, 2026 | In progress issued Jul 2026 | 100 Stockton St | core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant.Details
core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant. | $1,200,000 | |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 888 Tennessee St | B N Builders Inc | revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop.Details
revision to pa# 202510086942 add new fence at ground fl. structural sheets included. changes to doors at south machine shop. | |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 888 Tennessee St | B N Builders Inc | ground fl- remove walk in freezer. replace doors at walk in cooler. new fence at ground fl covered space. no food or beverage. ref pa # 202410042366 & 202504214839Details
ground fl- remove walk in freezer. replace doors at walk in cooler. new fence at ground fl covered space. no food or beverage. ref pa # 202410042366 & 202504214839 | $45,000 |
| Jun 12, 2025 | In progress filed Jun 2025, not yet issued | 550 Kearny St | level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes.Details
level 1 and level 2 - modification of shared space into amenities space including fitness center, showers, lounge, conference, restrooms & corridors. includes demo of non-structural partitions, doors, ceilings & finishes. | $2,725,800 | |
| Mar 17, 2025 | Completed final sign-off Aug 2026 | 55 Spear St | Novo Construction Inc | interior tenant improvement on the 19th fl of approx 8000 sq ft. mech,ele, plumbing and structural includedDetails
interior tenant improvement on the 19th fl of approx 8000 sq ft. mech,ele, plumbing and structural included | $925,000 |
| Nov 21, 2024 | In progress issued Jan 2025 | 1515 South Van Ness Av | Guzman Construction Group Inc. | ed 13-01. priority prj - alter site to pa# 202306059259 s: construction type changed to 1-b from 1-a. early childhood education center occupancy type changed to 1-4 from e.revision from issued site permit present on g001,g400,g401,a300 & a302. all other sheets are indentical to approved site permit.Details
ed 13-01. priority prj - alter site to pa# 202306059259 s: construction type changed to 1-b from 1-a. early childhood education center occupancy type changed to 1-4 from e.revision from issued site permit present on g001,g400,g401,a300 & a302. all other sheets are indentical to approved site permit. | $60,708,870 |
| Oct 25, 2024 | Completed final sign-off Jun 2025 | 888 Tennessee St | B N Builders Inc | revision to pa 202410042366 ground fl - installation of it gear in a cage. barrier removal in the men's restroom & signage installation of equipment and fencing. structural anchorage drawings includedDetails
revision to pa 202410042366 ground fl - installation of it gear in a cage. barrier removal in the men's restroom & signage installation of equipment and fencing. structural anchorage drawings included | $40,000 |
| Mar 8, 2024 | In progress issued Jul 2024 | 750 Golden Gate Av | Cahill Contractors Llc. | 100% affordable housing. erect 8 story type 1a, residential 75 units, parking, office assembly (r-2,s-1,s-2,b,a-3). mayor ed 13-01Details
100% affordable housing. erect 8 story type 1a, residential 75 units, parking, office assembly (r-2,s-1,s-2,b,a-3). mayor ed 13-01 | $37,100,000 |
| Feb 27, 2023 | Expired or cancelled expired Mar 2026 | 1360 43rd Av | Cahill Contractors Llc. | priority 13-01: revision to pa# 201912099009/s-1 & s-2. structural reductioon to the slab thickness over stall #4. provide 18" draft stop over ev stalls. revised mechanical and electrical related to changes.Details
priority 13-01: revision to pa# 201912099009/s-1 & s-2. structural reductioon to the slab thickness over stall #4. provide 18" draft stop over ev stalls. revised mechanical and electrical related to changes. | |
| Feb 13, 2023 | Completed final sign-off Sep 2024 | 120 Stockton St | Calasia Construction Inc | suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.Details
suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit. | |
| Feb 16, 2022 | Completed final sign-off Sep 2024 | 120 Stockton St | Sunshine Comm'l Constr. Inc., Calasia Construction Inc | interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope.Details
interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope. | $6,250,000 |
| Dec 9, 2019 | Completed final sign-off Mar 2025 | 1360 43rd Av | Cahill Contractors Llc. | priority project, mayor ed 13-01. to erect a type 3a over type 1a, 5-story, 100% afforable educator building w/ 135 residential units.Details
priority project, mayor ed 13-01. to erect a type 3a over type 1a, 5-story, 100% afforable educator building w/ 135 residential units. | $40,000,000 |