David Gonzalez
- Listed as
- engineer
- Firm
- M Retail Engineering Inc.
- Based in
- Westville
- On San Francisco permits
- Apr 2006 to Jan 2016
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2016 | Completed final sign-off May 2016 | 384 Post St | Marini Construction Inc | ti for cartier boutique space 206 sq ft gr fl saks 5th ave. work includes (n) fixtures, finishes, lighting, fire protection under seperate permit.Details
ti for cartier boutique space 206 sq ft gr fl saks 5th ave. work includes (n) fixtures, finishes, lighting, fire protection under seperate permit. | $100,000 |
| Dec 21, 2015 | Never finaled issued Jan 2016, no final | 33 Powell St | The Hatch Group Inc | modifications to approved scope of work . revision to app#201506017702. 1)add additional power outlets. 2)revise title 24 calculations. n/a for maher.Details
modifications to approved scope of work . revision to app#201506017702. 1)add additional power outlets. 2)revise title 24 calculations. n/a for maher. | $5,000 |
| Mar 4, 2014 | Expired or cancelled cancelled Jan 2026 | 170 Ofarrell St | tenant improvment project for a michael kors inside macys store. work to include arch, elec, structural work only - all work is to be done on the 3rd floor.Details
tenant improvment project for a michael kors inside macys store. work to include arch, elec, structural work only - all work is to be done on the 3rd floor. | $399,069 | |
| Jan 19, 2012 | Completed final sign-off Jun 2012 | 166 Geary St | Build Group Inc. | build out of (n) canopy, re-cladding of (e) storefront and replacing of existing entry doors . entry doors to be replaced in-kind. canopy will not block any fire escape, rescue window, or exit. additional permits to be submitted for interior work.Details
build out of (n) canopy, re-cladding of (e) storefront and replacing of existing entry doors . entry doors to be replaced in-kind. canopy will not block any fire escape, rescue window, or exit. additional permits to be submitted for interior work. | $50,000 |
| Jan 20, 2009 | Completed final sign-off Jul 2009 | 3251 20th Av | Dickinson Cameron Construction Company I, Hathaway Dinwiddie Co. | space #262 t.i.-combine 2 tenant space,demolish demising wall bet 2 tenant spaces to make 1 larger space,demolish & provide all finishes & fixtures.provide new toilet rooms, ductwork, elec equip,sprinklers,storefront.relocating (e)mall fire hose valve.fire sprinkler,signage under separate permit.Details
space #262 t.i.-combine 2 tenant space,demolish demising wall bet 2 tenant spaces to make 1 larger space,demolish & provide all finishes & fixtures.provide new toilet rooms, ductwork, elec equip,sprinklers,storefront.relocating (e)mall fire hose valve.fire sprinkler,signage under separate permit. | $602,394 |
| Apr 27, 2006 | Completed final sign-off Apr 2008 | 845 Market St | Timberwolff Construction Inc | juicy couture, space# 137, cti-2, 1st floor, el, me.Details
juicy couture, space# 137, cti-2, 1st floor, el, me. | $220,000 |