Danil Botoshansky
- Listed as
- engineer
- On San Francisco permits
- Aug 2021 to Apr 2026
6 permits since 2000 (engineer on 6 permits): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2026 | In progress issued Apr 2026 | 857 Hayes St | Art Of Italy Inc Dba: Aoi Group | 3rd floor work only. opening wall between dining room and hallway, adding ceiling speakers, interior remodel only, not adding square footage. opening wall between master bedroom and living room. no plumbing fixtures.Details
3rd floor work only. opening wall between dining room and hallway, adding ceiling speakers, interior remodel only, not adding square footage. opening wall between master bedroom and living room. no plumbing fixtures. | $42,000 |
| Nov 12, 2025 | In progress issued Nov 2025 | 1914 Golden Gate Av | Vhea General Contractor | interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes.Details
interior work: 2nd fl- construct two separate entries with a dividing wall. 3rd fl- convert (e) kitchen into new bathroom and nook. install new laundry in (e) closet. no work at 1st fl. no exterior changes. | $30,000 |
| Oct 24, 2023 | In progress issued Dec 2023 | 1214 Masonic Av | Global Arch Construction Inc | remodel (e) residence, interior addition of 85.5 sq ft to the lower fl to accommodate new office, laundry and walk in closet. relocate laundry from the garage, relocate water heaters. kitchen remodling at the middle fl. convert (e) bedroom into master bath and closet. (e) bath upper fl, newDetails
remodel (e) residence, interior addition of 85.5 sq ft to the lower fl to accommodate new office, laundry and walk in closet. relocate laundry from the garage, relocate water heaters. kitchen remodling at the middle fl. convert (e) bedroom into master bath and closet. (e) bath upper fl, new | $15,000 |
| Aug 17, 2022 | Completed final sign-off Jun 2023 | 1615 48th Av | Global Arch Construction Inc, Hf Construction & Development | remove partition wall btw kitchen, dining room & living area for both units. (e) kitchens & bathrooms remodeling. new recessed lights, remove laundry from 1st fl, install laundrt in both units. new water heater & storage room.Details
remove partition wall btw kitchen, dining room & living area for both units. (e) kitchens & bathrooms remodeling. new recessed lights, remove laundry from 1st fl, install laundrt in both units. new water heater & storage room. | $100,000 |
| Jun 29, 2022 | Completed final sign-off Feb 2023 | 2138 26th Av | Global Arch Construction Inc | remodel extg kitchen cabinets and island. install new kitchen electrical circuits. demo extg seperation walls between kitchen and living room. install new support posts and beams per plans.Details
remodel extg kitchen cabinets and island. install new kitchen electrical circuits. demo extg seperation walls between kitchen and living room. install new support posts and beams per plans. | $45,000 |
| Aug 31, 2021 | Completed final sign-off Sep 2022 | 2786 Bush St | Db2 Contractors Inc 8 Dba Re Renovations | change the angle of the bottom of the bay window to allow higher access for vehicle entrance. match decorative elements to existing. remove columns in the garage. add posts and new beam.Details
change the angle of the bottom of the bay window to allow higher access for vehicle entrance. match decorative elements to existing. remove columns in the garage. add posts and new beam. | $8,000 |