Daniel Baroni
- Listed as
- architect
- Firm
- Daniel Baroni Aia
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Sep 2026
9 permits since 2000 (architect on 9 permits): 4 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 1 California St | Principal Builders Inc. | 19th floor: t.i. work includes non-structural partitions, ceilings, finishes and associated mech and electrical expansion of existing tenant suite.Details
19th floor: t.i. work includes non-structural partitions, ceilings, finishes and associated mech and electrical expansion of existing tenant suite. | $375,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies.Details
non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies. | $50,000 |
| Apr 30, 2026 | In progress issued Jul 2026 | 100 Stockton St | core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant.Details
core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant. | $1,200,000 | |
| Jan 28, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23.Details
change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23. | $21,000,000 |
| Sep 19, 2025 | Completed final sign-off Mar 2026 | 550 07th St | Centric Construction Inc | 2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street.Details
2nd fl: tenant improvement of (e) level 2 and mezzanine as office space. mezzanine not visible from street. | $1,744,000 |
| Aug 27, 2025 | Completed final sign-off Nov 2025 | 550 07th St | Centric Construction Inc | tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed.Details
tenant improvement of existing lvel 1 as prototyping space. new construction includes new drinking fountain and lighting and electrical distribution for occupancy as a prototyping space. no changes to the exterior, roof terrace or gr level proposed. | $325,000 |
| Jun 12, 2017 | Completed final sign-off May 2018 | 2828 Fulton St | R M C Contractors Inc | light well infill & kitchen renovation.Details
light well infill & kitchen renovation. | $65,000 |
| Feb 11, 2011 | Completed final sign-off Aug 2011 | 2 Embarcadero Center | Gci, Inc | 6th floor-select demo of (e) interior non load bearing partitions & construction of partitions, finishes to accommodate new tenant use. new reception/conference area, server room & exercise room with locker rooms (men's & women's)Details
6th floor-select demo of (e) interior non load bearing partitions & construction of partitions, finishes to accommodate new tenant use. new reception/conference area, server room & exercise room with locker rooms (men's & women's) | $250,000 |
| May 9, 2008 | Expired or cancelled expired Sep 2009 | 2828 Fulton St | Wood Street Builders | conversion of ground level storage/garage into 1 hr separated garage and living space to iclude new hallway, bathroom, storage room, closet, family rm, office/bedroom. conversion of current storage room below 2nd floor sunroom into outdoor living space with new rear door to access/new window bdrm,Details
conversion of ground level storage/garage into 1 hr separated garage and living space to iclude new hallway, bathroom, storage room, closet, family rm, office/bedroom. conversion of current storage room below 2nd floor sunroom into outdoor living space with new rear door to access/new window bdrm, | $40,000 |