Dana Pope
- Listed as
- authorized agent-others, contractor
- Firm
- D A Pope Inc
- Based in
- Foster City
- On San Francisco permits
- Feb 2000 to Oct 2025
139 permits since 2000 (contractor on 139 permits, authorized agent-others on 6 permits): 120 completed, 1 in progress, 13 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 139.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2025 | In progress issued Nov 2025 | 2001 Lombard St | D A Pope Inc | retrofit existing building main entry with new concrete ramp for accessible main entry. remodel existing ground floor breakroom and restroom as required for accessibilty. five new private offices on second floor.Details
retrofit existing building main entry with new concrete ramp for accessible main entry. remodel existing ground floor breakroom and restroom as required for accessibilty. five new private offices on second floor. | $196,542 |
| Oct 1, 2025 | Completed final sign-off Sep 2026 | 1550 Bryant St | D A Pope Inc | 7th/fl: ti includes seismic bolting of (e) phone booths (ada reference: 2018-0112-8516)Details
7th/fl: ti includes seismic bolting of (e) phone booths (ada reference: 2018-0112-8516) | $15,000 |
| Apr 25, 2025 | Completed final sign-off Apr 2025 | 1241 Stockton St | D A Pope Inc | revision to permit 202408299726, ensure supply air and return are located in new office footprint.Details
revision to permit 202408299726, ensure supply air and return are located in new office footprint. | |
| Aug 29, 2024 | Completed final sign-off Apr 2025 | 1241 Stockton St | D A Pope Inc | 1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mepDetails
1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mep | $101,814 |
| Jan 26, 2023 | Completed final sign-off Sep 2023 | 3131 Webster St | D A Pope Inc | furnish and install auto door openters for 1 door to comply with abe 202211305340Details
furnish and install auto door openters for 1 door to comply with abe 202211305340 | |
| Oct 17, 2022 | Completed final sign-off Feb 2023 | 1550 Bryant St | D A Pope Inc | 6/f: new phone room (private phone room) bolting to floor only. private phone rooms by other. electriccal sprinklers and f/ls to be under separate permit.Details
6/f: new phone room (private phone room) bolting to floor only. private phone rooms by other. electriccal sprinklers and f/ls to be under separate permit. | $3,500 |
| Oct 7, 2022 | Completed final sign-off Feb 2023 | 1550 Bryant St | D A Pope Inc | 6/fl revision to 202108045709 egress plan update to show roof deck furniture as requested by fire department for assembly permit.Details
6/fl revision to 202108045709 egress plan update to show roof deck furniture as requested by fire department for assembly permit. | |
| Sep 29, 2022 | Completed final sign-off May 2023 | 2380 Irving St | D A Pope Inc | 1st fl: demolition of (e) non bearing interior partions (n) non bearing interior wall for future tenant office conference rooms add break/copy (e) restroom accesibility upgrade. fire alarm/sprinklers under separate permits.Details
1st fl: demolition of (e) non bearing interior partions (n) non bearing interior wall for future tenant office conference rooms add break/copy (e) restroom accesibility upgrade. fire alarm/sprinklers under separate permits. | $535,000 |
| Sep 26, 2022 | Completed final sign-off Nov 2022 | 1550 Bryant St | D A Pope Inc | 9/f ti includes new non-str partitions, new millwork + new sink, existing room renovated to lactation room ref 2018-0112-8516. mep life safety fire alarm sprinklers under seperate permit if needed design build.Details
9/f ti includes new non-str partitions, new millwork + new sink, existing room renovated to lactation room ref 2018-0112-8516. mep life safety fire alarm sprinklers under seperate permit if needed design build. | $19,500 |
| Aug 19, 2022 | Completed final sign-off Nov 2022 | 1550 Bryant St | D A Pope Inc | 8/f: rev to pa202205103842. modifty the dining area, office area and opening office ara. configuring them differently. increasing the overall occupancy count from 345 to 350. structural included.Details
8/f: rev to pa202205103842. modifty the dining area, office area and opening office ara. configuring them differently. increasing the overall occupancy count from 345 to 350. structural included. | |
| Aug 18, 2022 | Completed final sign-off Oct 2022 | 1550 Bryant St | D A Pope Inc | 2/f: t.i. new non-structural partitions and shower rooms. new or revised meps, lifesafety or fire sprinkleres will be design build if neeed and submitted separately. maher n/aDetails
2/f: t.i. new non-structural partitions and shower rooms. new or revised meps, lifesafety or fire sprinkleres will be design build if neeed and submitted separately. maher n/a | $150,000 |
| Jun 17, 2022 | Completed final sign-off Mar 2023 | 1550 Bryant St | D A Pope Inc | (2nd fl) ti includes the demo of non-str paritions and building new non str paritions. all new revised meps and life safety work will be design build and submitted separately (bldg is fully sprinklered)Details
(2nd fl) ti includes the demo of non-str paritions and building new non str paritions. all new revised meps and life safety work will be design build and submitted separately (bldg is fully sprinklered) | $398,624 |
| May 10, 2022 | Completed final sign-off Nov 2022 | 1550 Bryant St | D A Pope Inc | 8th fl: t.i. includes demo of non-structural partitions + building new non-structural partitions. all newer revised mep's + life safety + sprinkler work will be design-build & submitted separately. bldg is fully sprinklered.Details
8th fl: t.i. includes demo of non-structural partitions + building new non-structural partitions. all newer revised mep's + life safety + sprinkler work will be design-build & submitted separately. bldg is fully sprinklered. | $165,000 |
| Oct 12, 2021 | Completed final sign-off Jan 2024 | 170 Capp St | D A Pope Inc | 3rd flr-demolition of (e) non-bearing partitions, new non-load bearing partitions to create new training room. private offices & open space area. modify (e)electrical & lighting system to accomodate new layout. modify (e) hvac control & distribution systems including ductwork,supply & return grillesDetails
3rd flr-demolition of (e) non-bearing partitions, new non-load bearing partitions to create new training room. private offices & open space area. modify (e)electrical & lighting system to accomodate new layout. modify (e) hvac control & distribution systems including ductwork,supply & return grilles | $269,669 |
| Aug 4, 2021 | Completed final sign-off Feb 2023 | 1550 Bryant St | D A Pope Inc | 6/f, revision to pa# 202106162596 mech only.Details
6/f, revision to pa# 202106162596 mech only. | $225,000 |
| Aug 4, 2021 | Completed final sign-off Dec 2022 | 1550 Bryant St | D A Pope Inc | (6/f ti/5th exit corr) ti includes demo of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep.Details
(6/f ti/5th exit corr) ti includes demo of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep. | $1,500,000 |
| Jun 16, 2021 | Completed final sign-off Oct 2022 | 1550 Bryant St | D A Pope Inc | 6th floor: t.i. include demo of non-structural partitions & building. (n)non-structural paritions, all new or reivsed mep, life safety & sprincklers if needed will be deisgn build and submitted separately.Details
6th floor: t.i. include demo of non-structural partitions & building. (n)non-structural paritions, all new or reivsed mep, life safety & sprincklers if needed will be deisgn build and submitted separately. | $532,000 |
| Jan 27, 2020 | Completed final sign-off Jul 2020 | 1550 Bryant St | D A Pope Inc | 7th fl, ste 760 & 770 - ti include demo of non-structural partitions and build (n) non structural partitions; mep, life safety & sprinklers will be design build & submitted separately if needed. (bldg fully sprinklered)Details
7th fl, ste 760 & 770 - ti include demo of non-structural partitions and build (n) non structural partitions; mep, life safety & sprinklers will be design build & submitted separately if needed. (bldg fully sprinklered) | $217,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2019 | 501 03rd St | D A Pope Inc | revision to 201908068027 to (e) ti. installation of interior sound proof glass windowsDetails
revision to 201908068027 to (e) ti. installation of interior sound proof glass windows | $8,000 |
| Sep 6, 2019 | Completed final sign-off May 2020 | 501 03rd St | D A Pope Inc | suite 300: interior remodel (ti) to 3rd fl - light demolition, new drywall, offices, mep reconfiguration & interior finishes.Details
suite 300: interior remodel (ti) to 3rd fl - light demolition, new drywall, offices, mep reconfiguration & interior finishes. | $450,000 |
| Aug 6, 2019 | Completed final sign-off Dec 2019 | 501 03rd St | D A Pope Inc | suite 200: demolition of e non bearing partion. new non bearing partitions to create new offices, phone rm, copy rm, open officeDetails
suite 200: demolition of e non bearing partion. new non bearing partitions to create new offices, phone rm, copy rm, open office | $400,000 |
| Apr 23, 2019 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | demo of 2 concrete panel of battery st. & 1 concrete panel on halleck alley, installation of new storefront in new opening on halleck ave. installation of new storefront windows in new opening on battery st. (e) risers to be re-routed to accommodate facade windows, no new hvac workDetails
demo of 2 concrete panel of battery st. & 1 concrete panel on halleck alley, installation of new storefront in new opening on halleck ave. installation of new storefront windows in new opening on battery st. (e) risers to be re-routed to accommodate facade windows, no new hvac work | $270,000 |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 300 California St | D A Pope Inc | 1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.Details
1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a. | $50,000 |
| Feb 20, 2019 | Completed final sign-off Feb 2019 | 500 Washington St | D A Pope Inc | suite 450: electrical design drawings for pa 201811065128. ref ew201901308459. add (n) led fixtures, outlets and power dishwasher. title 24 compliance. maher n/a.Details
suite 450: electrical design drawings for pa 201811065128. ref ew201901308459. add (n) led fixtures, outlets and power dishwasher. title 24 compliance. maher n/a. | $100,000 |
| Jan 28, 2019 | Completed final sign-off Jul 2019 | 357 Tehama St | D A Pope Inc | unit 3, 3rd flr. interior remodel of (e) live-work unitDetails
unit 3, 3rd flr. interior remodel of (e) live-work unit | $100,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 500 Washington St | D A Pope Inc | suite 450. tenant improvement. remove of non-structural parititons, (n) finishes, millwork, plumbing and electrical. mep, fire, life safety and sprinkler under separate permit. restroom: barrier removal/relocate artitions.Details
suite 450. tenant improvement. remove of non-structural parititons, (n) finishes, millwork, plumbing and electrical. mep, fire, life safety and sprinkler under separate permit. restroom: barrier removal/relocate artitions. | $200,000 |
| Aug 24, 2018 | Never finaled issued Aug 2018, no final | 909 Montgomery St | D A Pope Inc | demolition of extg interior office non-structural bearing walls. new transformer and electrical panel and stub ups for plumbing for market ready suite 105. ab-017.Details
demolition of extg interior office non-structural bearing walls. new transformer and electrical panel and stub ups for plumbing for market ready suite 105. ab-017. | $75,000 |
| Aug 8, 2018 | Completed final sign-off Oct 2018 | 1550 Bryant St | D A Pope Inc | 1st flr suite 154 - ti demo of non structural partitions and build new non str partitions. all new or revise mep/life safety/fire sprinkers under sep permit. bld is fully sprinkleredDetails
1st flr suite 154 - ti demo of non structural partitions and build new non str partitions. all new or revise mep/life safety/fire sprinkers under sep permit. bld is fully sprinklered | $30,000 |
| Jul 20, 2018 | Completed final sign-off Nov 2018 | 501 03rd St | D A Pope Inc | further voluntary seismic strengthening and ada upgradesDetails
further voluntary seismic strengthening and ada upgrades | $80,000 |
| May 18, 2018 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permitsDetails
amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits | $300,000 |
| May 18, 2018 | Completed final sign-off Jul 2020 | 300 California St | D A Pope Inc | demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no maheDetails
demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe | $250,000 |
| May 3, 2018 | Completed final sign-off Jul 2018 | 1050 Sansome St | D A Pope Inc | revision to 201801188925 addition of 5 offices, new tenant at ground floorDetails
revision to 201801188925 addition of 5 offices, new tenant at ground floor | $40,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 1050 Sansome St | D A Pope Inc | 1st fl - market ready prep for showing to market in hopes of leasing including partitions, lighting, restrooms, counters, millworkDetails
1st fl - market ready prep for showing to market in hopes of leasing including partitions, lighting, restrooms, counters, millwork | $145,000 |
| Jan 18, 2018 | Completed final sign-off Sep 2018 | 1050 Sansome St | D A Pope Inc | 3/f: commercial t.i.: non-structural demo. new non-load bvearing partitions, new mechanical, electrical and plumbing to tie into (e) utilities. replacement of rooftop mechanical unit. well building certification.Details
3/f: commercial t.i.: non-structural demo. new non-load bvearing partitions, new mechanical, electrical and plumbing to tie into (e) utilities. replacement of rooftop mechanical unit. well building certification. | $558,800 |
| Jan 12, 2018 | Completed final sign-off May 2018 | 1550 Bryant St | D A Pope Inc | 2nd floor: t.i. includes ada barrier removal only. building is fully sprinklered. n/a for maherDetails
2nd floor: t.i. includes ada barrier removal only. building is fully sprinklered. n/a for maher | $4,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2017 | 300 California St | D A Pope Inc | revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.Details
revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher. | |
| Aug 21, 2017 | Completed final sign-off Nov 2017 | 1050 Sansome St | D A Pope Inc | 2/f- interior improvements including non-structural partition walls and finishes.Details
2/f- interior improvements including non-structural partition walls and finishes. | $250,000 |
| Jun 20, 2017 | Completed final sign-off Apr 2018 | 200 Green St | D A Pope Inc | construction of non-structural partitions, doors, frames, hardware, millwork, drywall, ceiling and finishes.Details
construction of non-structural partitions, doors, frames, hardware, millwork, drywall, ceiling and finishes. | $369,042 |
| May 24, 2017 | Completed final sign-off Nov 2017 | 300 California St | D A Pope Inc | 3rd flr: demo (e) non bearing walls, glazing, millwork, finishes, doors, frames hardware, ceiling grid, tile, light fixtures and non compliant restrooms. new non structural interior partitions, doors and frames. maher naDetails
3rd flr: demo (e) non bearing walls, glazing, millwork, finishes, doors, frames hardware, ceiling grid, tile, light fixtures and non compliant restrooms. new non structural interior partitions, doors and frames. maher na | $385,000 |
| May 9, 2017 | Completed final sign-off Dec 2017 | 300 California St | D A Pope Inc | revise and upgrade path of travel to comply w cbc 2016 ii 2 new accessible parking stalls to comply with cbc 2016 section 11b 502 iii. new passenger drop-off & loading zone accessible. to complu w/ cbc2016, section 11b-503.iv provide new tactile throughout path of travel to comply w/ cbc2016. n/aDetails
revise and upgrade path of travel to comply w cbc 2016 ii 2 new accessible parking stalls to comply with cbc 2016 section 11b 502 iii. new passenger drop-off & loading zone accessible. to complu w/ cbc2016, section 11b-503.iv provide new tactile throughout path of travel to comply w/ cbc2016. n/a | $130,000 |
| Jan 23, 2017 | Completed final sign-off Mar 2017 | 1050 Sansome St | D A Pope Inc | 4th floor: t.i. work includes selective demo and new non-structural walls.Details
4th floor: t.i. work includes selective demo and new non-structural walls. | $38,000 |
| Dec 28, 2016 | Completed final sign-off Feb 2017 | 1550 Bryant St | D A Pope Inc | 4th flr: ti- upgrade lights add additional outlets maher naDetails
4th flr: ti- upgrade lights add additional outlets maher na | $35,000 |
| Apr 22, 2016 | Completed final sign-off Jun 2016 | 724 Battery St | D A Pope Inc | general t.i. with minor demolition and electrical. no plumbing, extg lighting is extg to remain except for removal of a couple track lights.Details
general t.i. with minor demolition and electrical. no plumbing, extg lighting is extg to remain except for removal of a couple track lights. | $51,500 |
| Mar 18, 2016 | Completed final sign-off Jul 2016 | 340 Bryant St | D A Pope Inc | 4th floor full floor tenant improvement including non-structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures. life safety & mep under separate permit.Details
4th floor full floor tenant improvement including non-structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures. life safety & mep under separate permit. | $610,148 |
| Mar 16, 2016 | Completed final sign-off Jul 2016 | 340 Bryant St | D A Pope Inc | 2nd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.Details
2nd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit. | $1,064,833 |
| Mar 16, 2016 | Completed final sign-off Jul 2016 | 340 Bryant St | D A Pope Inc | 3rd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.Details
3rd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit. | $1,212,827 |
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 1050 Sansome St | D A Pope Inc | revision to 2015 0309 0298 / 2015 0811 3957: replace (e) outlets & lighting fixtures to comply with title 24 requirementsDetails
revision to 2015 0309 0298 / 2015 0811 3957: replace (e) outlets & lighting fixtures to comply with title 24 requirements | |
| Feb 5, 2016 | Completed final sign-off Jun 2016 | 410 Townsend St | D A Pope Inc | 1-4 floors: project consist only of barrier removal. demolition of extg drinking fountain of floors 1-4 and upgrading to ada compliance. extg mep, life safty and sprinkler modification are under seperate permit.Details
1-4 floors: project consist only of barrier removal. demolition of extg drinking fountain of floors 1-4 and upgrading to ada compliance. extg mep, life safty and sprinkler modification are under seperate permit. | $6,000 |
| Dec 8, 2015 | Completed final sign-off Jun 2016 | 410 Townsend St | D A Pope Inc | project consist of barrier removal. domo of existing 4th fl restroom finishes and accessories. finsihes and accessories upgraded. mech,elec, life safety, sprinkler sep permit. n/a ordinance #155-13Details
project consist of barrier removal. domo of existing 4th fl restroom finishes and accessories. finsihes and accessories upgraded. mech,elec, life safety, sprinkler sep permit. n/a ordinance #155-13 | $70,000 |
| Nov 18, 2015 | Completed final sign-off Mar 2016 | 1050 Sansome St | D A Pope Inc | 1st/2nd flrs: inspector required additional detail per revised s2.2 plan showing downturned slab edge as per details 1&2/s2.2 dtd. 7-31-15 revision plan, (rev to 201503090298)Details
1st/2nd flrs: inspector required additional detail per revised s2.2 plan showing downturned slab edge as per details 1&2/s2.2 dtd. 7-31-15 revision plan, (rev to 201503090298) | $7,500 |
| Nov 17, 2015 | Never finaled issued Nov 2015, no final | 1 Lombard St | D A Pope Inc | ti add (5) light fixtures, seven outlets. ref pa 2015-1106-1977. n/a ordinance #155-13Details
ti add (5) light fixtures, seven outlets. ref pa 2015-1106-1977. n/a ordinance #155-13 | $15,022 |
| Nov 6, 2015 | Completed final sign-off Dec 2015 | 1 Lombard St | D A Pope Inc | 2nd flr, ste 200: this project involves modification of (e) tenant space to inclue selective demo and construction of non-load bearing partitions,new ceiling grid & tile,new light fixtures,new office doors & frames & new finishes; maher n/aDetails
2nd flr, ste 200: this project involves modification of (e) tenant space to inclue selective demo and construction of non-load bearing partitions,new ceiling grid & tile,new light fixtures,new office doors & frames & new finishes; maher n/a | $62,320 |
| Sep 15, 2015 | Completed final sign-off Apr 2016 | 1550 Bryant St | D A Pope Inc | tenant improvement. upgrade lighting systems and power outlets. ref 201509025936Details
tenant improvement. upgrade lighting systems and power outlets. ref 201509025936 | $67,000 |
| Sep 2, 2015 | Completed final sign-off Apr 2016 | 1550 Bryant St | D A Pope Inc | 7th fl.( suite 750) t.i. includes the demo of non-structural partitions and build back of non-structural partitions. all new or revised m.e.p., life safety, and sprinklers drawings to be submitted under separate permit if needed (building is fully sprinklered).Details
7th fl.( suite 750) t.i. includes the demo of non-structural partitions and build back of non-structural partitions. all new or revised m.e.p., life safety, and sprinklers drawings to be submitted under separate permit if needed (building is fully sprinklered). | $106,000 |
| Aug 11, 2015 | Completed final sign-off Mar 2016 | 1050 Sansome St | D A Pope Inc | 1st and 2nd floor - replace existing outlets and lighting fixtures to comply with title 24 requirements. ref pa 201503090298Details
1st and 2nd floor - replace existing outlets and lighting fixtures to comply with title 24 requirements. ref pa 201503090298 | $22,000 |
| Jul 28, 2015 | Completed final sign-off Nov 2015 | 1050 Sansome St | D A Pope Inc | revision to 201503049904. revision to 5th and 6th fl permit - interconnecting stairsDetails
revision to 201503049904. revision to 5th and 6th fl permit - interconnecting stairs | $110,000 |
| Jul 13, 2015 | Completed final sign-off Jun 2017 | 1050 Sansome St | D A Pope Inc | provide one (1) new exterior window, new canopy, new bldg entry door. replace glazing in 2nd floor windows.Details
provide one (1) new exterior window, new canopy, new bldg entry door. replace glazing in 2nd floor windows. | $200,000 |
| Jul 9, 2015 | Completed final sign-off Nov 2015 | 1550 Bryant St | D A Pope Inc | 4th floor: electrical tenant improvement. additonal outlets, upgrade lighting. ref 201506300268Details
4th floor: electrical tenant improvement. additonal outlets, upgrade lighting. ref 201506300268 | $62,000 |
| Jun 30, 2015 | Completed final sign-off Nov 2015 | 1550 Bryant St | D A Pope Inc | 4th floor suite #450: t.i. includes demo of non-structural partitions and bldg new non-structural partitions. all new or revised hvac, electrical, plmg, life safety and sprinklers will be design built and submitted for permit separately, bldg is fully sprinklered. n/a for maher.Details
4th floor suite #450: t.i. includes demo of non-structural partitions and bldg new non-structural partitions. all new or revised hvac, electrical, plmg, life safety and sprinklers will be design built and submitted for permit separately, bldg is fully sprinklered. n/a for maher. | $200,000 |
| Jun 15, 2015 | Never finaled issued Aug 2015, no final | 410 Townsend St | D A Pope Inc | ground floor: project consist of demolition of extg ground floor restroom finishes and water closet relocation. finishes will be upgraded mep, life safty, and sprinkler are not included in this permit. n/a for maher.Details
ground floor: project consist of demolition of extg ground floor restroom finishes and water closet relocation. finishes will be upgraded mep, life safty, and sprinkler are not included in this permit. n/a for maher. | $70,000 |
| May 11, 2015 | Completed final sign-off Apr 2016 | 1550 Bryant St | D A Pope Inc | 9th flr: revision to 201504073017, reducing the scope of work on electrical only, arch. 201503191272; maher n/a.Details
9th flr: revision to 201504073017, reducing the scope of work on electrical only, arch. 201503191272; maher n/a. | |
| Apr 27, 2015 | Completed final sign-off Feb 2016 | 1050 Sansome St | D A Pope Inc | voluntary seismic upgrade.Details
voluntary seismic upgrade. | $198,000 |
| Apr 7, 2015 | Completed final sign-off Nov 2015 | 1550 Bryant St | D A Pope Inc | 9th floor: ti- includes revision/retrofit of (e) lighting fixtures. maher - not req'dDetails
9th floor: ti- includes revision/retrofit of (e) lighting fixtures. maher - not req'd | $86,000 |
| Mar 19, 2015 | Completed final sign-off Nov 2015 | 1550 Bryant St | D A Pope Inc | 9th flr: ti includes the demo of nonstructural partitions and build new non structural partitions. all new or revised hvac, elect, plumb, and life safety work will be submitted seperately. bld is fully sprinkled maher - not req'dDetails
9th flr: ti includes the demo of nonstructural partitions and build new non structural partitions. all new or revised hvac, elect, plumb, and life safety work will be submitted seperately. bld is fully sprinkled maher - not req'd | $240,000 |
| Mar 12, 2015 | Never finaled issued Mar 2015, no final | 1050 Sansome St | D A Pope Inc | ti for 5th & 6th - electrical only ref pa# 2015 0304 9904Details
ti for 5th & 6th - electrical only ref pa# 2015 0304 9904 | $104,000 |
| Mar 11, 2015 | Completed final sign-off Nov 2015 | 1050 Sansome St | D A Pope Inc | ti 5th & 6th fl: 2 new a/c units - roof top. 2 new split system a/c units. 1 exhaust fan ref pa# 2015 0304 9904Details
ti 5th & 6th fl: 2 new a/c units - roof top. 2 new split system a/c units. 1 exhaust fan ref pa# 2015 0304 9904 | $60,000 |
| Mar 9, 2015 | Completed final sign-off Mar 2016 | 1050 Sansome St | D A Pope Inc | renovate lobby. add new bike room, demolish floor at 2nd floor to create 2 story lobby, new restrooms finishes at 2nd floor. also provide new finishes, mep and structural work in 2 story lobby area.Details
renovate lobby. add new bike room, demolish floor at 2nd floor to create 2 story lobby, new restrooms finishes at 2nd floor. also provide new finishes, mep and structural work in 2 story lobby area. | $500,000 |
| Mar 4, 2015 | Completed final sign-off Nov 2015 | 1050 Sansome St | D A Pope Inc | t.i. to 5th and 6th floors , includes new walls, lifhting. electrical, plmg and mechanical deferred submittalsDetails
t.i. to 5th and 6th floors , includes new walls, lifhting. electrical, plmg and mechanical deferred submittals | $550,500 |
| Dec 23, 2014 | Completed final sign-off Jan 2015 | 1050 Sansome St | D A Pope Inc | i.t. data room at basement floor, new walls as shown per note #1; new door as shown per note #3 and me as required.Details
i.t. data room at basement floor, new walls as shown per note #1; new door as shown per note #3 and me as required. | $8,600 |
| Dec 16, 2014 | Completed final sign-off Apr 2015 | 1550 Bryant St | D A Pope Inc | 8th flr: construction of new break area including cabinetry plumbing and lighting; mep to be design built under separate permit. building fully sprinklered; maher n/aDetails
8th flr: construction of new break area including cabinetry plumbing and lighting; mep to be design built under separate permit. building fully sprinklered; maher n/a | $15,000 |
| Nov 20, 2014 | Completed final sign-off Feb 2015 | 1050 Sansome St | D A Pope Inc | demolition of 2nd and 3rd floors, non structural partiton wallsDetails
demolition of 2nd and 3rd floors, non structural partiton walls | $30,000 |
| Oct 21, 2014 | Completed final sign-off Nov 2014 | 1550 Bryant St | D A Pope Inc | 5th floor suite #500: t.i. to include selective demo nonstruction of non-load bearings partitions. mep & life safety under separate permit. maher n/a.Details
5th floor suite #500: t.i. to include selective demo nonstruction of non-load bearings partitions. mep & life safety under separate permit. maher n/a. | $40,000 |
| Sep 18, 2014 | Completed final sign-off Oct 2015 | 1550 Bryant St | D A Pope Inc | flrs: 8 and 9- construction of communication stair between 2 existing "b" occupancy floors (8th and 9th flrs) maher n/aDetails
flrs: 8 and 9- construction of communication stair between 2 existing "b" occupancy floors (8th and 9th flrs) maher n/a | $176,000 |
| Jun 20, 2014 | Completed final sign-off Mar 2016 | 1550 Bryant St | D A Pope Inc | 8th floor:phase iii meps for 201402289570Details
8th floor:phase iii meps for 201402289570 | $240,000 |
| Jun 4, 2014 | Expired or cancelled expired May 2022 | 1550 Bryant St | D A Pope Inc | t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13Details
t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13 | $1,000 |
| May 29, 2014 | Completed final sign-off Jun 2014 | 1550 Bryant St | D A Pope Inc | 4th floor #400/490 - revision to appl #2014.0417.3490: modify duct work hvac no new units. n/a maher ordinance 155-13Details
4th floor #400/490 - revision to appl #2014.0417.3490: modify duct work hvac no new units. n/a maher ordinance 155-13 | |
| Apr 17, 2014 | Completed final sign-off Jun 2014 | 1550 Bryant St | D A Pope Inc | #400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. bldg is fully sprinklered. n/a to ordinance #155-13.Details
#400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. bldg is fully sprinklered. n/a to ordinance #155-13. | $250,000 |
| Mar 24, 2014 | Completed final sign-off Jun 2014 | 725 Folsom St | D A Pope Inc | ground floor:t.i. includes demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmbg and life safety work wil be design build and sumitted seperately. fully sprinklered.Details
ground floor:t.i. includes demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmbg and life safety work wil be design build and sumitted seperately. fully sprinklered. | $75,000 |
| Feb 28, 2014 | Completed final sign-off Aug 2015 | 1550 Bryant St | D A Pope Inc | 8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demo included.Details
8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demo included. | $750,000 |
| Feb 18, 2014 | Completed final sign-off Apr 2015 | 1550 Bryant St | D A Pope Inc | 8th fl new non structural paritions, interior doors, glazing. new or revised hvac, elec, plumbing, life safety design build, submitted separately. building fully sprinlered. glass partitions under separate permit with structural.Details
8th fl new non structural paritions, interior doors, glazing. new or revised hvac, elec, plumbing, life safety design build, submitted separately. building fully sprinlered. glass partitions under separate permit with structural. | $750,000 |
| Feb 3, 2014 | Completed final sign-off Apr 2014 | 1550 Bryant St | D A Pope Inc | 8th floor: interior demo only. ab-017 will remain unoccupied until t. i. permit is approved. n/a for maher ordinance #155-13Details
8th floor: interior demo only. ab-017 will remain unoccupied until t. i. permit is approved. n/a for maher ordinance #155-13 | $11,000 |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 1550 Bryant St | D A Pope Inc | 7/f- removal of section of partition and interior glazing at existing elevator lobby, if applicable, all new or modified hvac, electrical and life safety work will be design build and submitted seperatelyDetails
7/f- removal of section of partition and interior glazing at existing elevator lobby, if applicable, all new or modified hvac, electrical and life safety work will be design build and submitted seperately | $5,000 |
| Oct 11, 2013 | Never finaled issued Oct 2013, no final | 300 California St | D A Pope Inc | addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearanceDetails
addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearance | $32,000 |
| Jun 26, 2013 | Completed final sign-off Feb 2014 | 1550 Bryant St | D A Pope Inc | 9th floor-revision to pa# 2013-0522-7681-revision include lighting (title 24); changes include lighting plan a2.09 power and signal a.3.09 compliance with ord 155-13 not requiredDetails
9th floor-revision to pa# 2013-0522-7681-revision include lighting (title 24); changes include lighting plan a2.09 power and signal a.3.09 compliance with ord 155-13 not required | $15,000 |
| Jun 13, 2013 | Completed final sign-off Jul 2013 | 1550 Bryant St | D A Pope Inc | 3rd floor-ti include demolition of non structural partitions, new non structural partitions, relocate doors, new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperately. building fully sprinkleredDetails
3rd floor-ti include demolition of non structural partitions, new non structural partitions, relocate doors, new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperately. building fully sprinklered | $35,000 |
| Jun 11, 2013 | Completed final sign-off Oct 2013 | 1550 Bryant St | D A Pope Inc | 8th floor-multi-tenant floor-interior demo, no disabled access upgrades, per ab-017. arch, mep, sprinkler & fire alarm under separate applications. maintain life safety and sprinkler systems operational.Details
8th floor-multi-tenant floor-interior demo, no disabled access upgrades, per ab-017. arch, mep, sprinkler & fire alarm under separate applications. maintain life safety and sprinkler systems operational. | $30,000 |
| Jun 4, 2013 | Completed final sign-off Dec 2014 | 28 Geary St | D A Pope Inc | suite #500-interior office improvements-new carpet, paint, new interior non structural partitions, new millwork, cabinets, new interior doors. (e) lighting to remain, no structural work. re-work (e) mechanical & electrical. m.e. will be deferred submittalDetails
suite #500-interior office improvements-new carpet, paint, new interior non structural partitions, new millwork, cabinets, new interior doors. (e) lighting to remain, no structural work. re-work (e) mechanical & electrical. m.e. will be deferred submittal | $97,000 |
| May 22, 2013 | Completed final sign-off Aug 2013 | 1550 Bryant St | D A Pope Inc | 9th floor t.i. includes bldg full height non-sttructural partition, new doors, frames, interior, glazing, relocation of light fixtures & selected new lights, all new or modified hvac, electrical, plumbing & life safety work will be design build under separate permit (bldg fully sprinklered).Details
9th floor t.i. includes bldg full height non-sttructural partition, new doors, frames, interior, glazing, relocation of light fixtures & selected new lights, all new or modified hvac, electrical, plumbing & life safety work will be design build under separate permit (bldg fully sprinklered). | $175,000 |
| Apr 23, 2013 | Completed final sign-off Apr 2013 | 1550 Bryant St | D A Pope Inc | electrical, mechanical title 24 work associated with bldg pa# 2013-0319-2501Details
electrical, mechanical title 24 work associated with bldg pa# 2013-0319-2501 | $3,000 |
| Mar 19, 2013 | Completed final sign-off Apr 2013 | 1550 Bryant St | D A Pope Inc | 6th floor suite # 600: t. i. include the demo of non-structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered.Details
6th floor suite # 600: t. i. include the demo of non-structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered. | $38,000 |
| Mar 12, 2013 | Completed final sign-off Apr 2013 | 1550 Bryant St | D A Pope Inc | 7th floor-suite #735-build out full height non structural partitions. new doors & frames, interior glazing. demo of (e) ceiling & relocate lights. all new or revised hvac, electrical, plumbing & life safety work will be design build & under seperate permit. building fully sprinkleredDetails
7th floor-suite #735-build out full height non structural partitions. new doors & frames, interior glazing. demo of (e) ceiling & relocate lights. all new or revised hvac, electrical, plumbing & life safety work will be design build & under seperate permit. building fully sprinklered | $35,000 |
| Jan 8, 2013 | Completed final sign-off Feb 2013 | 1550 Bryant St | D A Pope Inc | 4th fl. ste 470. ti include building out, full height, non structural partitions, new doors/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately.Details
4th fl. ste 470. ti include building out, full height, non structural partitions, new doors/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately. | $55,000 |
| Jan 8, 2013 | Completed final sign-off Mar 2013 | 1550 Bryant St | D A Pope Inc | 5th fl. ste 525, 535, 545. ti include building out, full height, non structural partitions, new door/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separatelyDetails
5th fl. ste 525, 535, 545. ti include building out, full height, non structural partitions, new door/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately | $89,000 |
| Nov 29, 2012 | Expired or cancelled cancelled Jan 2014 | 300 California St | D A Pope Inc | 3rd floor suite 300 - demolition & construction of non-load bearing partitions, relocation of light fixtures & demo of exisitng acoustic ceiling grid & tile, new doors, new finishes. mechanical & electrical under separate permit.Details
3rd floor suite 300 - demolition & construction of non-load bearing partitions, relocation of light fixtures & demo of exisitng acoustic ceiling grid & tile, new doors, new finishes. mechanical & electrical under separate permit. | $125,000 |
| Oct 26, 2012 | Completed final sign-off May 2013 | 848 Battery St | D A Pope Inc | revision to app#201208157467 to clarify framing at gathering steps per bldg inspectors request and submit as an addition to extg permit.Details
revision to app#201208157467 to clarify framing at gathering steps per bldg inspectors request and submit as an addition to extg permit. | |
| Aug 15, 2012 | Completed final sign-off May 2013 | 840 Battery St | D A Pope Inc | demolition on existing office-non structural interior walls include wm outlets.relocation of existing lights.new partitions, electrical,server rm,lights, millwork and finishes and new communication stairDetails
demolition on existing office-non structural interior walls include wm outlets.relocation of existing lights.new partitions, electrical,server rm,lights, millwork and finishes and new communication stair | $750,000 |
| Jul 18, 2012 | Completed final sign-off Oct 2012 | 2622 Ocean Av | D A Pope Inc | change of use from m-retail to b-medical office-new ceiling, lights, plumbing & finishes.Details
change of use from m-retail to b-medical office-new ceiling, lights, plumbing & finishes. | $62,000 |
| Jun 21, 2012 | Completed final sign-off Sep 2012 | 170 Maiden Ln | D A Pope Inc | 5th floor-t.i. to consist of demolition non bearing partitions, new partitions, electrical, hvac, plumbing, acoustical ceilings, sprinkler & finishes. m.e.p under seperate permits. all work on 5th floor.Details
5th floor-t.i. to consist of demolition non bearing partitions, new partitions, electrical, hvac, plumbing, acoustical ceilings, sprinkler & finishes. m.e.p under seperate permits. all work on 5th floor. | $420,000 |
| Apr 27, 2012 | Completed final sign-off Jun 2012 | 55 Francisco St | D A Pope Inc | suite #430: change of use from office to medical office. t.i.: new non load bearing wall, new suspsended ceiling,new casework, new lighting, new restroom.Details
suite #430: change of use from office to medical office. t.i.: new non load bearing wall, new suspsended ceiling,new casework, new lighting, new restroom. | $58,500 |
| Mar 20, 2012 | Completed final sign-off May 2012 | 1550 Bryant St | D A Pope Inc | 3rd fl-t.i. includes building out a few full height & low height non structural partitions. all new revised hvac, electrical, plumbing * life safety n sprinkler work will be design build & submitted seperately.Details
3rd fl-t.i. includes building out a few full height & low height non structural partitions. all new revised hvac, electrical, plumbing * life safety n sprinkler work will be design build & submitted seperately. | $105,000 |