Dale Meyer
- Listed as
- architect, authorized agent-others
- Firm
- Dale Meyer Assoc
- Based in
- Burlingame
- On San Francisco permits
- Mar 2000 to Aug 2016
8 permits since 2000 (architect on 7 permits, authorized agent-others on 1 permit): 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 16, 2016 | Completed final sign-off Sep 2018 | 1441 Taylor St | Husher Inc Dba Husher Construction | soft story retrofit per sfbc chapter 34b engineering criteria, ord #66-13. maher n/a.Details
soft story retrofit per sfbc chapter 34b engineering criteria, ord #66-13. maher n/a. | $70,000 |
| Dec 14, 2010 | Completed final sign-off Apr 2011 | 351 Church St | Grand Finishes | remodel (e) kitchen, (e) bathroom, add (n) stack washer/dryer. add (n) powder rm. rework three doorways. upgrade eletrical serviceDetails
remodel (e) kitchen, (e) bathroom, add (n) stack washer/dryer. add (n) powder rm. rework three doorways. upgrade eletrical service | $44,484 |
| Oct 3, 2008 | Expired or cancelled expired Jun 2010 | 3175 Cesar Chavez St | remove and replace stairs with same at frontDetails
remove and replace stairs with same at front | $2,500 | |
| Aug 21, 2006 | Completed final sign-off Aug 2006 | 3668 26th St | Hocker Construction | correction report-replace 2 windows & dry rot repair to windows sash at south side of store front. window replacement additional work from app# 200603297782.Details
correction report-replace 2 windows & dry rot repair to windows sash at south side of store front. window replacement additional work from app# 200603297782. | $1,720 |
| Aug 10, 2006 | Expired or cancelled withdrawn Sep 2006 | 1701 09th Av | remodel fist floor of (e) building and divide it into three retail spaces. all second floor for two residential units.Details
remodel fist floor of (e) building and divide it into three retail spaces. all second floor for two residential units. | $600,000 | |
| Mar 29, 2006 | Completed final sign-off Aug 2006 | 3668 26th St | Hocker Construction | dremove dry rotted members and replace with treated materials, remove enough flooring to complete work, replace with like materials. dryrot repair approx 10 lin ft of floor joistDetails
dremove dry rotted members and replace with treated materials, remove enough flooring to complete work, replace with like materials. dryrot repair approx 10 lin ft of floor joist | $5,000 |
| Dec 27, 2005 | Completed final sign-off Nov 2006 | 747 03rd St | Hart Construction | remodel existing bar that has changed owners, there will be a new storefront, t-24 ada upgrade, some new lighting and msc finishesDetails
remodel existing bar that has changed owners, there will be a new storefront, t-24 ada upgrade, some new lighting and msc finishes | $200,000 |
| Mar 10, 2000 | Completed final sign-off Sep 2000 | 3720 Broderick St | new bedrm & bathrm on grndflr, new windows front side & skylights throughoutDetails
new bedrm & bathrm on grndflr, new windows front side & skylights throughout | $50,000 |