Conway Cooke
- Listed as
- engineer
- On San Francisco permits
- Nov 2023 to Feb 2025
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 150 De Soto St | J&J Dynamic Construction Inc | kitchen remodel with the removal and replacement of all fixtures. 1/f bath remodel with the removal and replacement of all fixtures. replace (1) window in bath. reconfigure layout and remodel 2/f shared bath. create new master bath and wic at upper level bedroom. remove 4 windows.Details
kitchen remodel with the removal and replacement of all fixtures. 1/f bath remodel with the removal and replacement of all fixtures. replace (1) window in bath. reconfigure layout and remodel 2/f shared bath. create new master bath and wic at upper level bedroom. remove 4 windows. | $80,000 |
| Feb 13, 2025 | In progress issued Feb 2025 | 67 Walter St | Vbk Enterprises_Dba Construction Solutio | kitchen remodel w/ the removal of replacement of all fixtures. bathroom remodel w/ the removal & replacement of all fixtures. remove non-bearing wall in bath. remove 2 windows in kitchen & replace 1 door in kitchen.Details
kitchen remodel w/ the removal of replacement of all fixtures. bathroom remodel w/ the removal & replacement of all fixtures. remove non-bearing wall in bath. remove 2 windows in kitchen & replace 1 door in kitchen. | $89,000 |
| Apr 23, 2024 | Completed final sign-off May 2024 | 30 Stoneybrook Av | J&J Dynamic Construction Inc | kitchen remodel. bath remodel and new lighting in living roomDetails
kitchen remodel. bath remodel and new lighting in living room | $35,000 |
| Jan 19, 2024 | Completed final sign-off Jun 2024 | 260 Santa Clara Av | J&J Dynamic Construction Inc | kitchen remodel with the removal and replacement of all fixtures; 2 baths remodel with the removal and replacement of all fixtures; add a new masterbath to new location and existing both to be walk in closet; replace 1 1 window like for like in the master bathDetails
kitchen remodel with the removal and replacement of all fixtures; 2 baths remodel with the removal and replacement of all fixtures; add a new masterbath to new location and existing both to be walk in closet; replace 1 1 window like for like in the master bath | $60,000 |
| Nov 30, 2023 | Completed final sign-off Jan 2024 | 122 Lee Av | J&J Dynamic Construction Inc | interior bath and kitchen remodel involving the removal and replacement of all fixtures. lighting throughout residence. remove and replace (3) windows like for like -not street visible.Details
interior bath and kitchen remodel involving the removal and replacement of all fixtures. lighting throughout residence. remove and replace (3) windows like for like -not street visible. | $45,000 |