Ciaran John Mackey
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Cmac Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2016 to Feb 2025
14 permits since 2000 (contractor on 13 permits, authorized agent-others on 1 permit, designer on 1 permit): 11 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2025 | Completed final sign-off Feb 2026 | 2415 Buchanan St | Cmac Construction, West Valley Structural Co. | deck retrofit to comply with sf code. minor structural addition to meet the san francisco housing code, section 604Details
deck retrofit to comply with sf code. minor structural addition to meet the san francisco housing code, section 604 | $20,000 |
| Apr 5, 2023 | Expired or cancelled cancelled Jun 2023 | 1751 Lake St | Cmac Construction | ref to permit #202303204020 (03/22/23). exploratory demo on exterior, around garage area. remove shingles and trim to evaluate damage from flood. replace two garage door header (in kind).Details
ref to permit #202303204020 (03/22/23). exploratory demo on exterior, around garage area. remove shingles and trim to evaluate damage from flood. replace two garage door header (in kind). | $15,000 |
| Mar 20, 2023 | Expired or cancelled cancelled Jun 2023 | 1751 Lake St | Cmac Construction | water instrusion, dryrot repair, reinstall sheetrock where its been removed. dryrot work not visible from street. in kindDetails
water instrusion, dryrot repair, reinstall sheetrock where its been removed. dryrot work not visible from street. in kind | $100,000 |
| Oct 28, 2022 | Completed final sign-off Apr 2023 | 8 Hill Point Av | Cmac Construction | one bathroom remodel. change bath to shower, dry rot repair. we intend to remove the bathtub and vanity. create shower, tile and paint. no structure work.Details
one bathroom remodel. change bath to shower, dry rot repair. we intend to remove the bathtub and vanity. create shower, tile and paint. no structure work. | $20,000 |
| May 31, 2022 | Completed final sign-off Apr 2023 | 146 07th Av | Cmac Construction | kitchen remodel. install cabinetry in living room. refinish floors and paint.Details
kitchen remodel. install cabinetry in living room. refinish floors and paint. | $150,000 |
| Aug 12, 2021 | Completed final sign-off Apr 2022 | 151 07th Av | Cmac Construction | additional - powder room to full bathroom. move non-load bearing wall and add showerDetails
additional - powder room to full bathroom. move non-load bearing wall and add shower | $50,000 |
| Apr 30, 2021 | Completed final sign-off Apr 2022 | 151 07th Av | Cmac Construction | open up various areas in kitchen & bath foor investigation, ~200 sqft.Details
open up various areas in kitchen & bath foor investigation, ~200 sqft. | $1,000 |
| Apr 5, 2021 | Completed final sign-off Apr 2022 | 151 07th Av | Cmac Construction | kitchen remodel. remodel main bathroom and add toilet. add countertop to laundry room.Details
kitchen remodel. remodel main bathroom and add toilet. add countertop to laundry room. | $250,000 |
| Mar 19, 2021 | Completed final sign-off May 2021 | 1000 Union St | Cmac Construction | steem heater caused damage to sheet rock & trim. install new sheetrock & trim. like for like. sheetrock to be 5/8" type x gyp.Details
steem heater caused damage to sheet rock & trim. install new sheetrock & trim. like for like. sheetrock to be 5/8" type x gyp. | $40,000 |
| Sep 4, 2020 | Completed final sign-off Sep 2020 | 2429 Franklin St | Cmac Construction | kitchen: under cabinet lighting in kitchen. replace (e) island with new island. new countertop. painting.Details
kitchen: under cabinet lighting in kitchen. replace (e) island with new island. new countertop. painting. | $10,000 |
| Dec 11, 2019 | Completed final sign-off Jan 2022 | 22 Appleton Av | Cmac Construction | 3/f: bathroom & kitchen remodel, no structural workDetails
3/f: bathroom & kitchen remodel, no structural work | |
| Oct 18, 2019 | Completed final sign-off Apr 2021 | 20 Appleton Av | Cmac Construction | 1. bathroom & kitchen alteration at 2nd fl. unit #20. 2. no structural work.Details
1. bathroom & kitchen alteration at 2nd fl. unit #20. 2. no structural work. | $5,000 |
| Jul 1, 2019 | Completed final sign-off Sep 2019 | 318 05th Av | Cmac Construction | install new cans in the ceiling. kitchen remodel in kind. remove counter tops and ind install new ones. remove some of the cabinets to create space. paint cabinets, wall and ceilings. patch some holes in the sheetrock.Details
install new cans in the ceiling. kitchen remodel in kind. remove counter tops and ind install new ones. remove some of the cabinets to create space. paint cabinets, wall and ceilings. patch some holes in the sheetrock. | $20,000 |
| Oct 21, 2016 | Never finaled issued Oct 2016, no final | 2336 Broadway | street spaceDetails
street space |