Christopher Hall
- Listed as
- architect, designer
- Firm
- Eaton Hall Architecture
- On San Francisco permits
- Mar 2015 to Dec 2025
25 permits since 2000 (architect on 24 permits, designer on 1 permit): 17 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2025 | In progress issued May 2026 | 950 Lombard St | Dowbuilt Inc. | new exterior pathway between e north and e south buildings. new stair, planter structure and modifications to retaining wall.Details
new exterior pathway between e north and e south buildings. new stair, planter structure and modifications to retaining wall. | $75,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 2001 Van Ness Av | Capticon Jv | unit grb: convert (e) standard show stall into ada shower stall.Details
unit grb: convert (e) standard show stall into ada shower stall. | $20,000 |
| Aug 28, 2025 | In progress issued Oct 2025 | 2001 Van Ness Av | Capticon Jv | administrative permit to document 7210 sf tenant space change of use from retail to martial arts studio (boxing gym). new ada restroom within (e) tenant space; (n) 2hr full ht demising wall separation: associated electrical.Details
administrative permit to document 7210 sf tenant space change of use from retail to martial arts studio (boxing gym). new ada restroom within (e) tenant space; (n) 2hr full ht demising wall separation: associated electrical. | $50,000 |
| Mar 25, 2025 | Completed final sign-off Dec 2025 | 950 Lombard St | Dowbuilt Inc. | replace existing pool(n) outdoor stair balustrade. new finishes, casework, lighting. convert storage room to powder room.Details
replace existing pool(n) outdoor stair balustrade. new finishes, casework, lighting. convert storage room to powder room. | $55,000 |
| Aug 15, 2024 | Completed final sign-off Sep 2024 | 2001 Van Ness Av | 4th floor-suite 407: interior office change of use from design professional office to allergy clinic. (1940 sq ft). no construction under this permit. all work approved under pa 202311201091Details
4th floor-suite 407: interior office change of use from design professional office to allergy clinic. (1940 sq ft). no construction under this permit. all work approved under pa 202311201091 | ||
| May 24, 2024 | Completed final sign-off Sep 2024 | 2001 Van Ness Av | R G C Construction Inc | 4/f #402: 750 sf interior office tenant improvement for an (e) dental office. new interior non-bearing partition walls, acoustic ceilings, interior finishes, lighting, power, and data.Details
4/f #402: 750 sf interior office tenant improvement for an (e) dental office. new interior non-bearing partition walls, acoustic ceilings, interior finishes, lighting, power, and data. | $250,000 |
| Nov 20, 2023 | Completed final sign-off Mar 2024 | 2001 Van Ness Av | Paradigm General Contractors | t.i.suite 407: scope of work shall include new interior non-bearing partition walls, acoustic ceilings, built-in casemwork. insterior finishes, lighting, power/data, hvac distribution & associatedDetails
t.i.suite 407: scope of work shall include new interior non-bearing partition walls, acoustic ceilings, built-in casemwork. insterior finishes, lighting, power/data, hvac distribution & associated | $400,000 |
| Aug 2, 2023 | Completed final sign-off Mar 2024 | 1035 Battery St | R G C Construction Inc | change of use for 1st fl tenant space from m to b occupancy. interior work is for model office on 2nd fl tenant space. (n) private office kitchenette, accessbile all gender restroom, floor finishes, associated electrical & plumbing under separate trade permit. no food provided by employeeDetails
change of use for 1st fl tenant space from m to b occupancy. interior work is for model office on 2nd fl tenant space. (n) private office kitchenette, accessbile all gender restroom, floor finishes, associated electrical & plumbing under separate trade permit. no food provided by employee | $300,000 |
| Dec 22, 2022 | Completed final sign-off Jan 2023 | 1960 Bryant St | Principal Builders Inc. | administrative permit to facilitate sfdph review of apprvd 202205265100 which should have required mk review. no additional work under this permitDetails
administrative permit to facilitate sfdph review of apprvd 202205265100 which should have required mk review. no additional work under this permit | |
| Nov 16, 2022 | Completed final sign-off Jan 2023 | 575 Florida St | Principal Builders Inc. | shift in swing/placentment of commumicating openningg doors bewtween 575 florida & 1960 bryant street as had been previously aproved under pa# 2022-0427-3080Details
shift in swing/placentment of commumicating openningg doors bewtween 575 florida & 1960 bryant street as had been previously aproved under pa# 2022-0427-3080 | $5,000 |
| Jul 1, 2022 | Never finaled issued Jul 2022, no final | 2001 Van Ness Av | exterior facade improvement. sign is under separate permit.Details
exterior facade improvement. sign is under separate permit. | $125,000 | |
| Jun 6, 2022 | Completed final sign-off Mar 2023 | 575 Florida St | Principal Builders Inc. | 1/f: new exterior canopy at the entry.Details
1/f: new exterior canopy at the entry. | $5,000 |
| May 26, 2022 | Completed final sign-off Feb 2023 | 1960 Bryant St | Principal Builders Inc. | change of use from light manufacturing (pdr) to arts activity space. work includes tenant improvement work - walls, partitions, millwork, lighting, mep.Details
change of use from light manufacturing (pdr) to arts activity space. work includes tenant improvement work - walls, partitions, millwork, lighting, mep. | $465,000 |
| May 23, 2022 | Expired or cancelled cancelled Jan 2026 | 150 Edgewood Av | replace (e) windows with (n) french doors at living room + master bedroom provide (n) balcony deck for upper floor and provide a new stair down to the backyard from the lower floor.Details
replace (e) windows with (n) french doors at living room + master bedroom provide (n) balcony deck for upper floor and provide a new stair down to the backyard from the lower floor. | $30,000 | |
| Apr 28, 2022 | Completed final sign-off Jan 2023 | 2001 Van Ness Av | Paradigm General Contractors | 3/f suite 300: interior t.i includeds new non-load bearing partitions, ceilings, finishes, and mep. to comply with nov 202185634.Details
3/f suite 300: interior t.i includeds new non-load bearing partitions, ceilings, finishes, and mep. to comply with nov 202185634. | $1,200,000 |
| Aug 3, 2021 | Completed final sign-off Feb 2023 | 1960 Bryant St | Principal Builders Inc. | 1st floor-tenant improvement includes new interior partitions, plumbing & electrical layout. light manufacturing with accessory b occupancy use per building code. no exterior work.Details
1st floor-tenant improvement includes new interior partitions, plumbing & electrical layout. light manufacturing with accessory b occupancy use per building code. no exterior work. | $460,000 |
| May 25, 2021 | Completed final sign-off Aug 2022 | 575 Florida St | Principal Builders Inc. | tenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and 3.Details
tenant improvement at level 1 and p1; work also includes a change of occupancy for assembly space, non-egress communicating stair from level 1 to level 4, and the build out of library at level 2 and 3. | $2,760,000 |
| Jul 1, 2019 | Never finaled issued Sep 2019, no final | 690 Folsom St | Select Exteriors Inc | new 5'-0" tall glass railing system/wind screen and perimeter of outdoor patio. new entrance gate. remove (e) metal post, fence and gates.Details
new 5'-0" tall glass railing system/wind screen and perimeter of outdoor patio. new entrance gate. remove (e) metal post, fence and gates. | $15,000 |
| Oct 29, 2018 | Never finaled issued Mar 2019, no final | 690 Folsom St | Select Exteriors Inc | addition of new pergola to (e) patio space. no tenant improvements under this permitDetails
addition of new pergola to (e) patio space. no tenant improvements under this permit | $135,000 |
| Jan 16, 2018 | Completed final sign-off Apr 2019 | 3700 Geary Bl | Built With Principle Inc | change of use from retail occupancy (m) into (i-2.1). to construct new dialysis center - construct interior improvements to convert outpatient renal dialysis clinic. 12 stations, 1 private treatment, training room, non load bearing walls and finishes. ** maher: n/a **Details
change of use from retail occupancy (m) into (i-2.1). to construct new dialysis center - construct interior improvements to convert outpatient renal dialysis clinic. 12 stations, 1 private treatment, training room, non load bearing walls and finishes. ** maher: n/a ** | $1,000,000 |
| Oct 30, 2017 | Completed final sign-off Nov 2018 | 690 Folsom St | Belfor Usa Group Inc | misc interior improvements, including new storage rm, reconfiguration of storage it. office ti with fire damage replacement of the office & storage room. remove and replace all wall, floor & ceiling, storage room. r+r all wall, floor and ceiling, finishes in office and storage room due to fire.Details
misc interior improvements, including new storage rm, reconfiguration of storage it. office ti with fire damage replacement of the office & storage room. remove and replace all wall, floor & ceiling, storage room. r+r all wall, floor and ceiling, finishes in office and storage room due to fire. | $20,000 |
| Aug 29, 2016 | Completed final sign-off Oct 2017 | 690 Folsom St | Engler Construction | install outdoor patio fence ref pa 2015-0821-4936 at a table tennis club.Details
install outdoor patio fence ref pa 2015-0821-4936 at a table tennis club. | $500 |
| Apr 28, 2016 | Completed final sign-off May 2017 | 333 Brannan St | Gci, Inc | restaurant build out of an exisitng shell. indoor & outdoor dining areas, bar, kitchen, food/beverage storage & bathrooms. including but not limited to built-in furniture & interior walls & finishes.new hood & duct & air /maid bleed of system n/a for maher ordinance no. 155-13Details
restaurant build out of an exisitng shell. indoor & outdoor dining areas, bar, kitchen, food/beverage storage & bathrooms. including but not limited to built-in furniture & interior walls & finishes.new hood & duct & air /maid bleed of system n/a for maher ordinance no. 155-13 | $430,000 |
| Aug 21, 2015 | Completed final sign-off May 2016 | 690 Folsom St | Arco Murray Design Build | indoor table tennis club build out of an (e) shell. indoor and outdoor court with viewing areas, dining areas, bar, kitchen, food/beverage stroage & bathrooms, including but not limited to built in furniture and interior walls and finishes.Details
indoor table tennis club build out of an (e) shell. indoor and outdoor court with viewing areas, dining areas, bar, kitchen, food/beverage stroage & bathrooms, including but not limited to built in furniture and interior walls and finishes. | $1,200,000 |
| Mar 12, 2015 | Expired or cancelled withdrawn Jan 2016 | 945 Bryant St | (n) 395 s.f. lobby for 11,400 sf tenant, tenant is a reprographics. n/a ordinance #155-13Details
(n) 395 s.f. lobby for 11,400 sf tenant, tenant is a reprographics. n/a ordinance #155-13 | $10,000 |