Chris S. Lee
- Listed as
- engineer
- On San Francisco permits
- Aug 2014 to Aug 2026
19 permits since 2000 (engineer on 19 permits): 15 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 389 09th Av | at&t: remove (6)(e) antennas, (9)(e) rrus; install (6)(n) antennas, (6) (n) rrus; no proposed change to (e) batteries.Details
at&t: remove (6)(e) antennas, (9)(e) rrus; install (6)(n) antennas, (6) (n) rrus; no proposed change to (e) batteries. | $75,000 | |
| Dec 9, 2024 | Completed final sign-off Jun 2025 | 1100 Pine St | revision to bpa#: 202211307408; at&t revise antenna attachment to roof structural details. no revision to approved batteries, antehnnas, or electrical.Details
revision to bpa#: 202211307408; at&t revise antenna attachment to roof structural details. no revision to approved batteries, antehnnas, or electrical. | ||
| Aug 23, 2024 | In progress issued Sep 2024 | 2400 San Bruno Av | Mojo Petroleum Services | replace apt-xp piping and test boots.Details
replace apt-xp piping and test boots. | $65,515 |
| May 4, 2023 | Completed final sign-off Dec 2023 | 1 Richardson Av | Electric Tech Construction Inc | at&t remove (6) (e)antennas, install (6) (n) antennas remove (2) (e) 2'-0" radomes & replace w/ (2) (n) 2'-4" radomes, remove (e) ductles minisplit, no change to (e) batteriesDetails
at&t remove (6) (e)antennas, install (6) (n) antennas remove (2) (e) 2'-0" radomes & replace w/ (2) (n) 2'-4" radomes, remove (e) ductles minisplit, no change to (e) batteries | $52,000 |
| Apr 26, 2023 | Completed final sign-off Dec 2023 | 1515 19th Av | Quality Telecom Consultants | at&t remove & replae 6 (e) antennas w/6 (n) antennas; remove & replace 3 (e) rrus w/(3) (n) rrus; install 4 (n) rectifier, 6(n) combiner, 1 (n) 6648 baseband, 2 (n) upconverters; no chane to (e) batteriesDetails
at&t remove & replae 6 (e) antennas w/6 (n) antennas; remove & replace 3 (e) rrus w/(3) (n) rrus; install 4 (n) rectifier, 6(n) combiner, 1 (n) 6648 baseband, 2 (n) upconverters; no chane to (e) batteries | $45,000 |
| Mar 8, 2023 | Completed final sign-off Apr 2024 | 700 Taylor St | Electric Tech Construction Inc | rr 9 existing antennas w/ 9 new antennas, install 1 new radome, paint antennas to match existing, install 1 new rectifier & new mux, no change to existing batteries.Details
rr 9 existing antennas w/ 9 new antennas, install 1 new radome, paint antennas to match existing, install 1 new rectifier & new mux, no change to existing batteries. | $45,000 |
| Dec 13, 2022 | Completed final sign-off Sep 2024 | 3535 Balboa St | Metropolitan Electrical Construction | at&t: remove (2)(e) micro antennas; install (1)(n) micro antenna; remove (2)(e) cabinets; install (1)(n) cabinet; install (4)(n) batteries.Details
at&t: remove (2)(e) micro antennas; install (1)(n) micro antenna; remove (2)(e) cabinets; install (1)(n) cabinet; install (4)(n) batteries. | $42,000 |
| Nov 30, 2022 | Never finaled issued Sep 2023, no final | 709 Geary St | Electric Tech Construction Inc | att: remove (1)(e) rru + (1) (e) antenna; install (6) (n) antennas, install (4) (n) batteries.Details
att: remove (1)(e) rru + (1) (e) antenna; install (6) (n) antennas, install (4) (n) batteries. | $52,000 |
| Nov 30, 2022 | Completed final sign-off Jun 2025 | 1100 Pine St | Metropolitan Electrical Construction | att: remove (2) (e) ombi antennas; install (2) (n) antennas within (2) (n) faax vents ; install (4) (n) rru's, remove all unused euipment; remove all (e) batteries to install (8) (n) batteries.Details
att: remove (2) (e) ombi antennas; install (2) (n) antennas within (2) (n) faax vents ; install (4) (n) rru's, remove all unused euipment; remove all (e) batteries to install (8) (n) batteries. | $72,000 |
| Sep 22, 2022 | Completed final sign-off Feb 2026 | 627 Cortland Av | Diablo Telecom & Construction Inc | att remove 2 e micro antennas,install 2 n antennas on rooftop within radomes, 1 n equipment platform on roof top relocate 1 e cabinet to platform and install 1 new cabinet, 6 n rrus, 12 n batteries. per 2021008984cuaDetails
att remove 2 e micro antennas,install 2 n antennas on rooftop within radomes, 1 n equipment platform on roof top relocate 1 e cabinet to platform and install 1 new cabinet, 6 n rrus, 12 n batteries. per 2021008984cua | $120,000 |
| Jul 13, 2022 | Completed final sign-off Aug 2025 | 375 Laguna Honda Bl | Electric Tech Construction Inc | att: remove (5) (e) antennas ; install (6) (n) rrus; install (4) (n) antennas; no change to batteries.Details
att: remove (5) (e) antennas ; install (6) (n) rrus; install (4) (n) antennas; no change to batteries. | $47,000 |
| Jul 13, 2022 | Completed final sign-off Jan 2023 | 1 Harrison St | Electric Tech Construction Inc | att: remove (6) (e) antennas ; install (3) (e) rrus, install (6) (n) antennas, (3) (n) rrus; install (4) (n) batteries.Details
att: remove (6) (e) antennas ; install (3) (e) rrus, install (6) (n) antennas, (3) (n) rrus; install (4) (n) batteries. | $42,000 |
| Jul 13, 2022 | Completed final sign-off May 2023 | 1745 Market St | High Band Construction Inc | att: remove (6) (e) antennas ; install (6) (n) antennas, (3) (n) rrus; remove (16) (e) batteries; install (16) (n) batteries.Details
att: remove (6) (e) antennas ; install (6) (n) antennas, (3) (n) rrus; remove (16) (e) batteries; install (16) (n) batteries. | $45,000 |
| May 20, 2021 | Completed final sign-off Sep 2021 | 2380 San Bruno Av | Confidence U S T Services Inc | replace (e) fuel dispensers w/new and update softwareDetails
replace (e) fuel dispensers w/new and update software | $28,880 |
| May 19, 2021 | Never finaled issued May 2021, no final | 4501 Geary Bl | Confidence U S T Services Inc | replace (e) dispensers and associated piping and upgrade isd software as necesssary perm vr-202Details
replace (e) dispensers and associated piping and upgrade isd software as necesssary perm vr-202 | $25,150 |
| Jul 27, 2020 | Completed final sign-off May 2021 | 2601 Mission St | Metropolitan Electrical Construction | removal & upgrade to rrus, transformer and wiringDetails
removal & upgrade to rrus, transformer and wiring | $30,000 |
| Mar 9, 2020 | Completed final sign-off Feb 2021 | 901 Market St | Metropolitan Electrical Construction | att modication: r&r (3)(e) antenna w/(3)(n) antennas; r&r(3)(e)rrus w/(9)(n)rrus' no change to (e) batteries.Details
att modication: r&r (3)(e) antenna w/(3)(n) antennas; r&r(3)(e)rrus w/(9)(n)rrus' no change to (e) batteries. | $27,000 |
| Nov 13, 2018 | Completed final sign-off Dec 2019 | 1701 Jerrold Av | Shah & Associates Inc Dba P D C Corporat | att modification: r&r (9) (e) antennas w/ (9) (n) antennas; install (12) (n) antennas, install (n) cabinet w/ batteriesDetails
att modification: r&r (9) (e) antennas w/ (9) (n) antennas; install (12) (n) antennas, install (n) cabinet w/ batteries | $44,000 |
| Aug 14, 2014 | Completed final sign-off Dec 2014 | 2845 Cesar Chavez St | Balch Petroleum Contractors & Builders | replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinanceDetails
replacing the drop tube system & adding a phase 1 vapor recovery to what is now a diesel tank. remove two existing fuel dispansers & replace them with new ones. n/a maher ordinance | $70,000 |