Chris Lee
- Listed as
- architect, designer, engineer
- Firm
- Interlocity
- Based in
- Signal Hill
- On San Francisco permits
- May 2020 to Jan 2024
60 permits since 2000 (engineer on 58 permits, architect on 2 permits, designer on 1 permit): 53 completed, 1 in progress, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 10, 2024 | In progress issued Apr 2026 | 501 Taylor St | Diablo Telecom & Construction Inc | att: remove 4 extg antennas and replace with 4 new antennas, remove 3 extg rrus, remove 4 extg frp screens and replace w/ 4 new frp screens; install 4 new batteries inside extg cabinets; install 3 new rectifiers inside extg cabinet.Details
att: remove 4 extg antennas and replace with 4 new antennas, remove 3 extg rrus, remove 4 extg frp screens and replace w/ 4 new frp screens; install 4 new batteries inside extg cabinets; install 3 new rectifiers inside extg cabinet. | $90,000 |
| Aug 9, 2022 | Completed final sign-off Jan 2023 | 2001 03rd St | Electric Tech Construction Inc | att remove and 6 e antennas qand install 6 new antennas, no change to batteriesDetails
att remove and 6 e antennas qand install 6 new antennas, no change to batteries | $45,000 |
| May 31, 2022 | Completed final sign-off Sep 2023 | 1111 California St | Metropolitan Electrical Construction | att: remove (4) (e) antennas, install (4) (n) antennas; remove (2) (e) cabinets; install (1) (n) cabinet ; install (4) (n) batteries.Details
att: remove (4) (e) antennas, install (4) (n) antennas; remove (2) (e) cabinets; install (1) (n) cabinet ; install (4) (n) batteries. | $53,000 |
| May 16, 2022 | Completed final sign-off Apr 2023 | 990 Columbus Av | Metropolitan Electrical Construction | at&t: remove + replace frp screen. install 3 new antennas. install 4 new batteries.Details
at&t: remove + replace frp screen. install 3 new antennas. install 4 new batteries. | $57,000 |
| Apr 12, 2022 | Completed final sign-off Oct 2023 | 55 Francisco St | Metropolitan Electrical Construction | att - remove & replace 4 (e) antennas w/4 (n) antennas; install 6 (n) counters, 2 (n) rectifier, 1 (n) battery rack & 12 (n) batteriesDetails
att - remove & replace 4 (e) antennas w/4 (n) antennas; install 6 (n) counters, 2 (n) rectifier, 1 (n) battery rack & 12 (n) batteries | $42,000 |
| Apr 4, 2022 | Completed final sign-off Dec 2022 | 650 07th St | Metropolitan Electrical Construction | at&t- remove 3 (e) antennas; 9 (e) rrus; install 3 (n) anatennas, 3 (n) rrus' remove & replace 16 (e) batteries w/(n) batteriesDetails
at&t- remove 3 (e) antennas; 9 (e) rrus; install 3 (n) anatennas, 3 (n) rrus' remove & replace 16 (e) batteries w/(n) batteries | $39,000 |
| Mar 14, 2022 | Completed final sign-off Nov 2024 | 647 Mission St | Metropolitan Electrical Construction | at&t: remove (6)(e) antennas, (4)(e) rrus, raise (6) (e) antenna mounting poles; install (6)(n) antennas; install (8)(n) rrus install (3)(n) surge suppresors, remove unused euipment ; remove all (e) batteries, install (2) (n) cabinets; install (n) batteries.Details
at&t: remove (6)(e) antennas, (4)(e) rrus, raise (6) (e) antenna mounting poles; install (6)(n) antennas; install (8)(n) rrus install (3)(n) surge suppresors, remove unused euipment ; remove all (e) batteries, install (2) (n) cabinets; install (n) batteries. | $55,000 |
| Feb 15, 2022 | Completed final sign-off Nov 2024 | 1520 Stockton St | Metropolitan Electrical Construction | att: install 3 new antennas; install 9 new rrus; remove 2 extg cabinets; install new equipment rack with batteries; no electrical work.Details
att: install 3 new antennas; install 9 new rrus; remove 2 extg cabinets; install new equipment rack with batteries; no electrical work. | $53,000 |
| Feb 3, 2022 | Expired or cancelled cancelled Jan 2026 | 389 09th Av | remove 1 existing at and t panel antenna per sector 3 storal, 1 e att rru, 11 b12 per sector 3 total.rmv e un used coax cables, rmv 2 e att rruw b4 per sector6,install 1 new att panel antenna per sec 3.install 1 new att rru 4449 b5/12 per sec 3.2 new att dc9 surg supp.2 new att dc pwr trunks @alpha/Details
remove 1 existing at and t panel antenna per sector 3 storal, 1 e att rru, 11 b12 per sector 3 total.rmv e un used coax cables, rmv 2 e att rruw b4 per sector6,install 1 new att panel antenna per sec 3.install 1 new att rru 4449 b5/12 per sec 3.2 new att dc9 surg supp.2 new att dc pwr trunks @alpha/ | $30,500 | |
| Dec 22, 2021 | Completed final sign-off Feb 2022 | 1501 Franklin St | Metropolitan Electrical Construction | cell site - fire review only for work approved under pa202005197601. - "no change to scope"Details
cell site - fire review only for work approved under pa202005197601. - "no change to scope" | |
| Nov 5, 2021 | Completed final sign-off Apr 2023 | 1155 Harrison St | Parsons Environment & Infrasteructure | att: remove 3 e antennas and 3 e rrus, install 3 new antennas, 3 new rrus. install 1 new cabinets with batteriesDetails
att: remove 3 e antennas and 3 e rrus, install 3 new antennas, 3 new rrus. install 1 new cabinets with batteries | $48,000 |
| Oct 15, 2021 | Completed final sign-off Sep 2022 | 611 Folsom St | Apex Site Solutions Inc | remove and install 4 antennas. remove install 4 rrus. remove 3 dc2. install 4 dc9. remove 1 dc6 @ gamma sector. install 4 dc power trunksDetails
remove and install 4 antennas. remove install 4 rrus. remove 3 dc2. install 4 dc9. remove 1 dc6 @ gamma sector. install 4 dc power trunks | $35,500 |
| Jul 26, 2021 | Completed final sign-off Mar 2022 | 2940 16th St | Electric Tech Construction Inc | at&t-remove 2 (e) rrus-11 b12 (6 total); remove 2 (e) rrus-32 (6 total); remove 2 (e) rrus-32 b66a (6 total); install 2 new rrus-4449 b5/b12 (6 total); install 2 (n) rrus-8843 b2/b66a (6 total); install 1 9n) rrus-4478 b14 (3 total); install 2 (n) dc-9 surge protection (3 total); install 2Details
at&t-remove 2 (e) rrus-11 b12 (6 total); remove 2 (e) rrus-32 (6 total); remove 2 (e) rrus-32 b66a (6 total); install 2 new rrus-4449 b5/b12 (6 total); install 2 (n) rrus-8843 b2/b66a (6 total); install 1 9n) rrus-4478 b14 (3 total); install 2 (n) dc-9 surge protection (3 total); install 2 | $30,000 |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 2300 26th St | Ericsson Inc Dba E U S Inc | remove and replace 3 at&t antennas, remove and replace 3 rrus, install 3 diplexers, remove 2 (e) rbs 226 cabinets, install 3 ge rectifier in dc power plant, remove/repl batt racks, install 8 new batteries. separate operating permit for batteries.Details
remove and replace 3 at&t antennas, remove and replace 3 rrus, install 3 diplexers, remove 2 (e) rbs 226 cabinets, install 3 ge rectifier in dc power plant, remove/repl batt racks, install 8 new batteries. separate operating permit for batteries. | $20,000 |
| Mar 22, 2021 | Completed final sign-off Oct 2021 | 2001 Union St | Electric Tech Construction Inc | remove 2 (e) panel antennas per sector 6 total. remove 1 (e) rrus-11 b12 per sector 3 total. install 2 (n) at&t panel antennas per sector 6 total. install 2 (n) at&t rrus per sector 6 total. install 1 (n) at&t dc-9 4, 1 dc power trunks, 1 fiber trunk.Details
remove 2 (e) panel antennas per sector 6 total. remove 1 (e) rrus-11 b12 per sector 3 total. install 2 (n) at&t panel antennas per sector 6 total. install 2 (n) at&t rrus per sector 6 total. install 1 (n) at&t dc-9 4, 1 dc power trunks, 1 fiber trunk. | $21,000 |
| Jan 22, 2021 | Completed final sign-off Oct 2021 | 990 Columbus Av | Metropolitan Electrical Construction | remove & replace 2 (e) antennas. relocate sectors. add 1 pipe to pipe mount. remove/replace 1 (e) rrus. at&t dc9 surge sppressor (3) & dc power (3). maher n/aDetails
remove & replace 2 (e) antennas. relocate sectors. add 1 pipe to pipe mount. remove/replace 1 (e) rrus. at&t dc9 surge sppressor (3) & dc power (3). maher n/a | $29,575 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 758 Divisadero St | Metropolitan Electrical Construction | att modification: swap 3 (e) antennas. swap 6 (e) rru's with 3 (n) rru's. relocate 2 (e) anteannas to within 2 (n) frp radomes. upgrade (e) 100a meter with 200a meter. no change to (e) batteries.Details
att modification: swap 3 (e) antennas. swap 6 (e) rru's with 3 (n) rru's. relocate 2 (e) anteannas to within 2 (n) frp radomes. upgrade (e) 100a meter with 200a meter. no change to (e) batteries. | $38,000 |
| Dec 18, 2020 | Completed final sign-off Apr 2022 | 3110 Octavia St | Electric Tech Construction Inc | remove & replace 4 antenna. remove 8 rru's. install 4 rru's. 4' high frp screen antenna. azimuth 300 on alpha sector. antenna azimuth 260 on beta sector.Details
remove & replace 4 antenna. remove 8 rru's. install 4 rru's. 4' high frp screen antenna. azimuth 300 on alpha sector. antenna azimuth 260 on beta sector. | $32,000 |
| Dec 18, 2020 | Completed final sign-off Jul 2022 | 650 Gilman Av | Metropolitan Electrical Construction | at&t remove & replace 3 existing rru's & 3 existing antennas. expand existing frp enclosure.Details
at&t remove & replace 3 existing rru's & 3 existing antennas. expand existing frp enclosure. | $20,000 |
| Dec 9, 2020 | Completed final sign-off Nov 2021 | 1635 Divisadero St | Metropolitan Electrical Construction | att modification. swap 4 (e) antennas; remove 6 rrus; install 12 (n) rrus; swap batteries; install other small equipment; remove unused equipment.Details
att modification. swap 4 (e) antennas; remove 6 rrus; install 12 (n) rrus; swap batteries; install other small equipment; remove unused equipment. | $32,000 |
| Oct 29, 2020 | Completed final sign-off Aug 2021 | 353 Sacramento St | Metropolitan Electrical Construction, Ericsson Inc Dba E U S Inc | at&t - remove & replace 7 antenna, 3 rru, & other telecom boxes. add new rack, 8 new batteries, 4 new surge suppressons & 7 rru. raise antenna masts 3'.Details
at&t - remove & replace 7 antenna, 3 rru, & other telecom boxes. add new rack, 8 new batteries, 4 new surge suppressons & 7 rru. raise antenna masts 3'. | $35,250 |
| Oct 29, 2020 | Completed final sign-off Apr 2021 | 2543 Noriega St | Electric Tech Construction Inc | at&t - remove 4 antennas. install 3 new antennas. remove & replace 3 rru's. other radio equipment in existing cabinets.Details
at&t - remove 4 antennas. install 3 new antennas. remove & replace 3 rru's. other radio equipment in existing cabinets. | $18,000 |
| Oct 29, 2020 | Expired or cancelled withdrawn May 2022 | 725 Greenwich St | remove & replace 3 antenna, 3 rru. add other radio equipment in existing cabinets.Details
remove & replace 3 antenna, 3 rru. add other radio equipment in existing cabinets. | $15,000 | |
| Oct 17, 2020 | Completed final sign-off Apr 2021 | 901 Cole St | Electric Tech Construction Inc | modification to cell site:swap 3 (e) radomes; swap 6 (e) antennas; install (n) batteries, swap (e) hvac.Details
modification to cell site:swap 3 (e) radomes; swap 6 (e) antennas; install (n) batteries, swap (e) hvac. | $27,000 |
| Oct 17, 2020 | Completed final sign-off Jul 2021 | 2001 03rd St | Ericsson Inc Dba E U S Inc | modification to cell site:swap 3 (e) antennas; remove 1 (e) rru; install 6 new rrus, install other small equipment. no change to (e) batteries; no electrical work.Details
modification to cell site:swap 3 (e) antennas; remove 1 (e) rru; install 6 new rrus, install other small equipment. no change to (e) batteries; no electrical work. | $19,000 |
| Sep 17, 2020 | Completed final sign-off Sep 2021 | 1555 Irving St | Electric Tech Construction Inc | at&t modification:- relocate (2) existing antennas down to lower section of frp- relocate rruw b5 to pos. 2 for all sectorsremove (1) existing panel antenna per sector, (3) total. remove (1) existing rrus per sector, (3) total. install (1) new antenna & rrus per sector (3) total.Details
at&t modification:- relocate (2) existing antennas down to lower section of frp- relocate rruw b5 to pos. 2 for all sectorsremove (1) existing panel antenna per sector, (3) total. remove (1) existing rrus per sector, (3) total. install (1) new antenna & rrus per sector (3) total. | $29,750 |
| Sep 14, 2020 | Completed final sign-off May 2021 | 501 Taylor St | Electric Tech Construction Inc | at&t modification:- remove (1) existing panel antenna per sector, (4) total- remove (1) existing rrus per sector, (4) total -relocate (1) antenna mount on position 1 at beta sector far east as possible-install (1) new panel antenna per sector (4) totalDetails
at&t modification:- remove (1) existing panel antenna per sector, (4) total- remove (1) existing rrus per sector, (4) total -relocate (1) antenna mount on position 1 at beta sector far east as possible-install (1) new panel antenna per sector (4) total | $31,500 |
| Sep 10, 2020 | Completed final sign-off Apr 2023 | 1100 Divisadero St | Walker Cellular Inc | at&t modification:- remove (1) existing at&t rrus per sector, (3) total-install (1) new at&t rrus per sector, (3) total-install (1) new dc9 per split sector, (3) total-install (2) new dc power trunks per split sector, (6) total- install (2) new at&t dc powertrunk per sector (6) totalDetails
at&t modification:- remove (1) existing at&t rrus per sector, (3) total-install (1) new at&t rrus per sector, (3) total-install (1) new dc9 per split sector, (3) total-install (2) new dc power trunks per split sector, (6) total- install (2) new at&t dc powertrunk per sector (6) total | $32,500 |
| Sep 9, 2020 | Completed final sign-off Apr 2021 | 776 Bush St | Ericsson Inc Dba E U S Inc | at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove 3 existing rru's· install 6 new rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove 3 existing rru's· install 6 new rru's· all other related equipment being placed in existing cabinets | $21,000 |
| Sep 8, 2020 | Completed final sign-off Nov 2021 | 93 06th St | Ericsson Inc Dba E U S Inc | at&t modification: remove 1 (e) panel antenna per sector 2 total. remove 1 e rrus-11 b12 per sector 2 total. re-use 2 e at&t 7/8" coax cable per section 4 total. install 1 n panel antenna per sector 2 total. 1 n att russ-4449 5b/b12 per section 2 total. 1 n dc9 surge suppressor. 2 n att power trunkDetails
at&t modification: remove 1 (e) panel antenna per sector 2 total. remove 1 e rrus-11 b12 per sector 2 total. re-use 2 e at&t 7/8" coax cable per section 4 total. install 1 n panel antenna per sector 2 total. 1 n att russ-4449 5b/b12 per section 2 total. 1 n dc9 surge suppressor. 2 n att power trunk | $28,575 |
| Sep 4, 2020 | Expired or cancelled expired Nov 2023 | 900 Palou Av | Ericsson Inc Dba E U S Inc | at&t proposes to modify an (e) facility as follows: remove and replace (3) antennas. remove (3) rru's and install (6) rru's. install (3) surge suppressors, (6) power trunks, (3) fiber trunks. @ shelter: - install (1) new 6630 baseband, install (1) new rectifier, (1) battery rack, (4) new batteries.Details
at&t proposes to modify an (e) facility as follows: remove and replace (3) antennas. remove (3) rru's and install (6) rru's. install (3) surge suppressors, (6) power trunks, (3) fiber trunks. @ shelter: - install (1) new 6630 baseband, install (1) new rectifier, (1) battery rack, (4) new batteries. | $23,000 |
| Sep 4, 2020 | Expired or cancelled expired Nov 2023 | 251 Barneveld Av | Electric Tech Construction Inc | at&t modifications:remove (1) existing antenna per sector (3) totalremove (2) existing rrus per sector (6) totalinstall (1) new antennas per sector (3) totalinstall (1) new frp radome extention per sector (3) totalre-sue existing fiber & power trunks for new rruDetails
at&t modifications:remove (1) existing antenna per sector (3) totalremove (2) existing rrus per sector (6) totalinstall (1) new antennas per sector (3) totalinstall (1) new frp radome extention per sector (3) totalre-sue existing fiber & power trunks for new rru | $37,500 |
| Sep 4, 2020 | Completed final sign-off Mar 2021 | 555 De Haro St | Electric Tech Construction Inc | at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove and replace 3 existing rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove and replace 3 existing rru's· all other related equipment being placed in existing cabinets | $15,000 |
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 899 Hyde St | Metropolitan Electrical Construction | at&t: swap (3) antennas, swap (3) rru's, install (4) pipe to pipe mount, (3) surge suppressor, (6) power trunks & (3) fiber trunks, remove (1) dc, install (2) outdoor surge suppressor, (1) 6630 baseband, (1) indoor vertiv netsure 7100, (9) rectifers (neq. 15930), no change to existing batteries.Details
at&t: swap (3) antennas, swap (3) rru's, install (4) pipe to pipe mount, (3) surge suppressor, (6) power trunks & (3) fiber trunks, remove (1) dc, install (2) outdoor surge suppressor, (1) 6630 baseband, (1) indoor vertiv netsure 7100, (9) rectifers (neq. 15930), no change to existing batteries. | $25,000 |
| Sep 4, 2020 | Completed final sign-off May 2023 | 709 Geary St | Parsons Environment & Infrasteructure | at&t proposes to modify and existing facility as follows:· remove 4 existing antennas· install 3 antennas· remove and replace 3 existing rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· remove 4 existing antennas· install 3 antennas· remove and replace 3 existing rru's· all other related equipment being placed in existing cabinets | $18,000 |
| Sep 4, 2020 | Completed final sign-off Jul 2022 | 211 Sutter St | Electric Tech Construction Inc | at&t proposes to modify an existing facility as follows: remove & replace 3 existing antennas, remove 6 existing rru's, install 3 rru's. all other related equipment being placed in existing cabinets.Details
at&t proposes to modify an existing facility as follows: remove & replace 3 existing antennas, remove 6 existing rru's, install 3 rru's. all other related equipment being placed in existing cabinets. | $21,000 |
| Sep 4, 2020 | Expired or cancelled cancelled Jul 2024 | 1201 Pacific Av | Electric Tech Construction Inc | at&t mobility: remove (2) e omni antennas from the from side of bldg. remove (2) e coax cables remove (2) e triplexers install (1) n rru h-frame on existing rooftop install (2) n omni antenna to be mounted on n antenna pipe mount install (3)n rrus & (2) n triplexers to be mounted on n rru h-frameDetails
at&t mobility: remove (2) e omni antennas from the from side of bldg. remove (2) e coax cables remove (2) e triplexers install (1) n rru h-frame on existing rooftop install (2) n omni antenna to be mounted on n antenna pipe mount install (3)n rrus & (2) n triplexers to be mounted on n rru h-frame | $35,750 |
| Sep 3, 2020 | Completed final sign-off Feb 2021 | 4216 California St | Ericsson Inc Dba E U S Inc | at&t proposes to modify an existing facility as follows:- remove and replace (3) antennas- remove (3) rru's and install (3) rru's- install (3) dc-9 surge suppressors, (6) dc power trunks, (3) dc fiber trunks @ shelter:- install (1) dc-12 unit, (1) 6630 baseband, (4)gs battieriesDetails
at&t proposes to modify an existing facility as follows:- remove and replace (3) antennas- remove (3) rru's and install (3) rru's- install (3) dc-9 surge suppressors, (6) dc power trunks, (3) dc fiber trunks @ shelter:- install (1) dc-12 unit, (1) 6630 baseband, (4)gs battieries | $22,000 |
| Sep 3, 2020 | Completed final sign-off Jun 2021 | 2350 Turk Bl | Electric Tech Construction Inc | at&t proposes to modify and existing facility as follows: remove and replace 3 existing antennas· remove and replace 3 existing rru's· remove 3 existing rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows: remove and replace 3 existing antennas· remove and replace 3 existing rru's· remove 3 existing rru's· all other related equipment being placed in existing cabinets | $15,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 999 Laguna St | Electric Tech Construction Inc | at&t modification: remove (12) (e) rrus; install (18) (n) rrus; install other small equipment; no change to antennas; no proposed change to (e) batteries.Details
at&t modification: remove (12) (e) rrus; install (18) (n) rrus; install other small equipment; no change to antennas; no proposed change to (e) batteries. | $36,000 |
| Aug 28, 2020 | Completed final sign-off Feb 2021 | 1801 Broadway | Ericsson Inc Dba E U S Inc | at&t proposes to modify and existing facility as follows:· remove and replace 2 existing antennas· remove 4 existing rru's· install 2 new rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· remove and replace 2 existing antennas· remove 4 existing rru's· install 2 new rru's· all other related equipment being placed in existing cabinets | $20,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2021 | 15 Marina Bl | Ericsson Inc Dba E U S Inc | at&t modification: remove (2) (e) omni antennas; install (2) (n) omni antennas; remove (4)(n) rrus; install (2)(n) rrus; no proposed chagne to (e) batteries.Details
at&t modification: remove (2) (e) omni antennas; install (2) (n) omni antennas; remove (4)(n) rrus; install (2)(n) rrus; no proposed chagne to (e) batteries. | $13,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2023 | 1701 Haight St | Electric Tech Construction Inc | at&t proposes to: r & r (4) antennas, remove (8) rru's and install (4) rru's, remove and replace (4) frp radome, reuse power/fiber connections, raise antennas on gamma sector 3'-6"; at shelter: remove (1) 5216, (1) xmu from rack, install (1) 6630, (1) receifiers, (3) trays, (12) gs batteries.Details
at&t proposes to: r & r (4) antennas, remove (8) rru's and install (4) rru's, remove and replace (4) frp radome, reuse power/fiber connections, raise antennas on gamma sector 3'-6"; at shelter: remove (1) 5216, (1) xmu from rack, install (1) 6630, (1) receifiers, (3) trays, (12) gs batteries. | $26,000 |
| Aug 27, 2020 | Completed final sign-off Jan 2021 | 5630 Mission St | Ericsson Inc Dba E U S Inc | at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove 6 existing rru's· install 3 new rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove 6 existing rru's· install 3 new rru's· all other related equipment being placed in existing cabinets | $15,000 |
| Aug 26, 2020 | Completed final sign-off Apr 2023 | 501 Laguna St | Electric Tech Construction Inc | at&t modification: swap (3) (e) antennas, relocate (3) (e) rrus; install (9) (n) rrus; expand (2) frp screen boxes; install other small equipment; install (8) (n) batteries.Details
at&t modification: swap (3) (e) antennas, relocate (3) (e) rrus; install (9) (n) rrus; expand (2) frp screen boxes; install other small equipment; install (8) (n) batteries. | $47,000 |
| Aug 24, 2020 | Completed final sign-off Dec 2020 | 2174 Market St | Electric Tech Construction Inc | at&t modification: swap (3) (e) antennas, paint to match; remove (6) (e) rrus; install (6) (n) rrus; swap (e) condenser on roof; swap (e) hvac in 3rd floor equipment room; install (12) (n) batteries.Details
at&t modification: swap (3) (e) antennas, paint to match; remove (6) (e) rrus; install (6) (n) rrus; swap (e) condenser on roof; swap (e) hvac in 3rd floor equipment room; install (12) (n) batteries. | $27,000 |
| Aug 22, 2020 | Completed final sign-off Feb 2021 | 2242 Polk St | Electric Tech Construction Inc | at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove and replace 3 existing rru's· all other related equipment being placed in existing cabinets.Details
at&t proposes to modify and existing facility as follows:· remove and replace 3 existing antennas· remove and replace 3 existing rru's· all other related equipment being placed in existing cabinets. | $15,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2021 | 800 Powell St | Ericsson Inc Dba E U S Inc | at&t proposes to:- remove and replace (2) antennas- remove (4) rru's and install (4) rru's@ shelter:- install (1) new 6630 baseband, install (1) xmu in e fif rack.Details
at&t proposes to:- remove and replace (2) antennas- remove (4) rru's and install (4) rru's@ shelter:- install (1) new 6630 baseband, install (1) xmu in e fif rack. | $23,000 |
| Aug 21, 2020 | Expired or cancelled expired Jan 2026 | 2121 19th Av | Ericsson Inc Dba E U S Inc | at&t modification:-3 total sectors: remove 1 (e) at&t panel antenna per sector;remove 1 (e) at&t rrus per sector;install 1 new at&t panel antenna;install (1) new at&t rrus per sector;install (1) new dc9 surge suppressor per sector;install (2) new dc power trunks & (1) new at&t fiber trunk per sectorDetails
at&t modification:-3 total sectors: remove 1 (e) at&t panel antenna per sector;remove 1 (e) at&t rrus per sector;install 1 new at&t panel antenna;install (1) new at&t rrus per sector;install (1) new dc9 surge suppressor per sector;install (2) new dc power trunks & (1) new at&t fiber trunk per sector | $25,000 |
| Aug 21, 2020 | Completed final sign-off May 2021 | 200 California St | Ericsson Inc Dba E U S Inc | at&t modification:- remove (2) existing at&t rrus per sector, (12) total-install (1) new at&t rrus per sector, (6) total-install (1) new dc9 per split sector, (3) total-install (2) new dc power trunks per split sector, (6) total- install (1) new at&t dc trunk per sector (3) totalDetails
at&t modification:- remove (2) existing at&t rrus per sector, (12) total-install (1) new at&t rrus per sector, (6) total-install (1) new dc9 per split sector, (3) total-install (2) new dc power trunks per split sector, (6) total- install (1) new at&t dc trunk per sector (3) total | $28,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2021 | 3450 03rd St | Walker Cellular Inc | at&t modification:- remove and replace (3) antennas- remove (6) rru's and install (3) rru's- resuse e mounting pipe for new antennas on e radome@ shelter:- remove (1) 5216, relocate (1) gps splitter, install (1) new 6630, install (5) new rectifiers, (8) n batteries.Details
at&t modification:- remove and replace (3) antennas- remove (6) rru's and install (3) rru's- resuse e mounting pipe for new antennas on e radome@ shelter:- remove (1) 5216, relocate (1) gps splitter, install (1) new 6630, install (5) new rectifiers, (8) n batteries. | $22,000 |
| Jul 27, 2020 | Completed final sign-off Mar 2021 | 1250 Columbus Av | Metropolitan Electrical Construction | remove (1) existing & install new (1) at&t panel antenna per sector, (3) total-remove (1) existing & install new (1) at&t rrus per sector, (3) total-install (1) new at&t dc-9 surge suppressor per sector, (3) total-install (2) new at&t dc power trunks per sector, (6) totalDetails
remove (1) existing & install new (1) at&t panel antenna per sector, (3) total-remove (1) existing & install new (1) at&t rrus per sector, (3) total-install (1) new at&t dc-9 surge suppressor per sector, (3) total-install (2) new at&t dc power trunks per sector, (6) total | $29,600 |
| Jul 27, 2020 | Completed final sign-off May 2021 | 405 Geary St | Metropolitan Electrical Construction | at&t remove (3) existing & install (3) new at&t panel antenna per sector, (3) total-remove (1) existing & install (2) new at&t rrus per sector, (2) total-install (1) new at&t dc-9 surge suppressor per sector, (2) total-install (2) new at&t dc power trunks per sector, (4) totalDetails
at&t remove (3) existing & install (3) new at&t panel antenna per sector, (3) total-remove (1) existing & install (2) new at&t rrus per sector, (2) total-install (1) new at&t dc-9 surge suppressor per sector, (2) total-install (2) new at&t dc power trunks per sector, (4) total | $35,750 |
| Jul 27, 2020 | Completed final sign-off Mar 2022 | 833 Mission St | Metropolitan Electrical Construction | remove (1) existing & install (1) new at&t panel antenna per sector, (2) total-remove (1) existing & install (1) new at&t rrus per sector, (2) total-install (1) new at&t dc-9 surge suppressor per sector,(2) total-install (2) new at&t dc power trunks per sector, (4) totalDetails
remove (1) existing & install (1) new at&t panel antenna per sector, (2) total-remove (1) existing & install (1) new at&t rrus per sector, (2) total-install (1) new at&t dc-9 surge suppressor per sector,(2) total-install (2) new at&t dc power trunks per sector, (4) total | $32,850 |
| Jun 6, 2020 | Completed final sign-off Jan 2021 | 723 Taraval St | Electric Tech Construction Inc | at&t modification: swap (4) (e) antennas; remove (3) (e) rrus and install (6) (n) rrus; install other small equipment;install (8) (n) batteries within (e) cabinet.Details
at&t modification: swap (4) (e) antennas; remove (3) (e) rrus and install (6) (n) rrus; install other small equipment;install (8) (n) batteries within (e) cabinet. | $21,000 |
| May 22, 2020 | Completed final sign-off Jun 2022 | 400 Sutter St | Ericsson Inc Dba E U S Inc | at&t proposes to modify an (e) facility as follows:remove & replace(6) antennas;install(3) (n) rru's;install(3)diplexers,(6)(n)dc power trucks;install(3)(n)filber trunk. @ shelter:remove & replace(3)rru's,remove rbs 2016 cabines,install(1)(n)6630,(1)dc12,(1)netxtend flex battery cabinet,(1)Details
at&t proposes to modify an (e) facility as follows:remove & replace(6) antennas;install(3) (n) rru's;install(3)diplexers,(6)(n)dc power trucks;install(3)(n)filber trunk. @ shelter:remove & replace(3)rru's,remove rbs 2016 cabines,install(1)(n)6630,(1)dc12,(1)netxtend flex battery cabinet,(1) | $38,000 |
| May 22, 2020 | Completed final sign-off Apr 2021 | 180 Geary St | Metropolitan Electrical Construction | at&t proposes to modify an (e) facility as follows:remove & replace(6) antennas;remove & replace (3)rru's & install(3) (n) rru's, reloacte (3) rru's;install(3)(n)dc9 & (6)(n)dc power trucks;install(3)(n)filber trunk.Details
at&t proposes to modify an (e) facility as follows:remove & replace(6) antennas;remove & replace (3)rru's & install(3) (n) rru's, reloacte (3) rru's;install(3)(n)dc9 & (6)(n)dc power trucks;install(3)(n)filber trunk. | $38,000 |
| May 20, 2020 | Completed final sign-off Sep 2022 | 2440 16th St | Metropolitan Electrical Construction | at&t modification: swap (3) (e) antennas, paint to match; remove (3) (e) rrus; install (6) (n) rrus; install (1) (n) stacked purcell cabinet above (e) cabinet; install (1) (n) battery cabinet w/ (8) (n) batteries.Details
at&t modification: swap (3) (e) antennas, paint to match; remove (3) (e) rrus; install (6) (n) rrus; install (1) (n) stacked purcell cabinet above (e) cabinet; install (1) (n) battery cabinet w/ (8) (n) batteries. | $25,000 |
| May 14, 2020 | Completed final sign-off Jan 2021 | 540 Van Ness Av | at&t modification: swap 3 (e) antennas, 3 (e) radomes w/ 3 (n) radomes, paint to match; remove 3 (e) rru's; install 3 (n) rru's; install other small equipment; install 1 (n) battery cabinet w/ (n) batteriesDetails
at&t modification: swap 3 (e) antennas, 3 (e) radomes w/ 3 (n) radomes, paint to match; remove 3 (e) rru's; install 3 (n) rru's; install other small equipment; install 1 (n) battery cabinet w/ (n) batteries | $27,000 | |
| May 13, 2020 | Completed final sign-off Feb 2021 | 234 09th St | at&t modification: swap (6) (e) antennas, swap (6) 24" radomes w/ (6) 28" radomes; install (6) (n) rru's; painto to match; remove (e) (e) rru's; install (6) (n) rru's; install other small equipment; replace (e) power plant; reuse (e) batteries; no change to (e) battery countDetails
at&t modification: swap (6) (e) antennas, swap (6) 24" radomes w/ (6) 28" radomes; install (6) (n) rru's; painto to match; remove (e) (e) rru's; install (6) (n) rru's; install other small equipment; replace (e) power plant; reuse (e) batteries; no change to (e) battery count | $37,000 |