Charles Green
- Listed as
- architect, authorized agent-others
- Firm
- As Architecture, Inc
- Based in
- Berkeley
- On San Francisco permits
- Apr 2019 to Jul 2026
10 permits since 2000 (architect on 10 permits, authorized agent-others on 1 permit): 3 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | In progress filed Jul 2026, not yet issued | 919 Alvarado St | interior basement remodel and addition(rear side only). no work to be done to the front facade of the building.Details
interior basement remodel and addition(rear side only). no work to be done to the front facade of the building. | $1,000,000 | |
| Apr 24, 2026 | Expired or cancelled withdrawn May 2026 | 919 Alvarado St | interior basement remodel and additionDetails
interior basement remodel and addition | $350,000 | |
| Jun 2, 2025 | In progress filed Jun 2025, not yet issued | 611 San Jose Av | B & G Build Group Inc | conversion of basement/ll into adu, includes addition of sq ft in rear. modify (e) half bath & closet on 2/l for full bath & remove (e) stairs from basement to main level. convert (e) deck to sunroom & add (n) deck w/ stair to rear yard.Details
conversion of basement/ll into adu, includes addition of sq ft in rear. modify (e) half bath & closet on 2/l for full bath & remove (e) stairs from basement to main level. convert (e) deck to sunroom & add (n) deck w/ stair to rear yard. | $300,000 |
| May 28, 2024 | In progress issued Jun 2024 | 225 Upper Tr | V J R Construction | rev 202207299556- remove north side of the proposed rooftop deck from the scope of work and the deck edge is pushed away from the (e) skylight. the perforated metal screen is extended to cover the entire east face of the existing stair penthouse. the guardrail post attachment and waterproDetails
rev 202207299556- remove north side of the proposed rooftop deck from the scope of work and the deck edge is pushed away from the (e) skylight. the perforated metal screen is extended to cover the entire east face of the existing stair penthouse. the guardrail post attachment and waterpro | $2,000 |
| Mar 31, 2023 | Never finaled issued Apr 2023, no final | 127 Miramar Av | revision to 2021 0929 9503. structural plan (a1-2a) footing & framingDetails
revision to 2021 0929 9503. structural plan (a1-2a) footing & framing | $53,000 | |
| May 11, 2022 | Never finaled issued Jun 2022, no final | 125 Highland Av | Connor Daly Corporation | interior renovation including bathroom modifications, added hallway closets, and kitchen and office configurations.Details
interior renovation including bathroom modifications, added hallway closets, and kitchen and office configurations. | $60,000 |
| Apr 27, 2022 | Never finaled issued Jun 2022, no final | 125 Highland Av | Connor Daly Corporation | window replacement. all window sizes & locations are being replaced in-kind. fence and gate modifications/ replacement. fence to be no higher than 6' high and will be 75% transparent. all windows to be wood. 6 windows to be replaced. u=.30 maxDetails
window replacement. all window sizes & locations are being replaced in-kind. fence and gate modifications/ replacement. fence to be no higher than 6' high and will be 75% transparent. all windows to be wood. 6 windows to be replaced. u=.30 max | $20,000 |
| Feb 18, 2022 | Expired or cancelled cancelled Jan 2026 | 425 Capistrano Av | bath remodel, add skylightDetails
bath remodel, add skylight | $13,000 | |
| Sep 29, 2021 | Never finaled issued Oct 2022, no final | 127 Miramar Av | construct new lower & upper exterior deck within the rear yard of property. upper lvl windows to be replaced w/sliding glass door. no changes or midifcations to the house.Details
construct new lower & upper exterior deck within the rear yard of property. upper lvl windows to be replaced w/sliding glass door. no changes or midifcations to the house. | $53,000 | |
| Apr 9, 2019 | Never finaled issued Sep 2019, no final | 141 Noe St | 1st fl: add washer, add storage. 2nd fl: enlarge 2 bath, no structural bearing walls. 3rd fl: add closet, enlarge bath, no structural bearing walls. 4th fl: (2) new fireplace, create new closet, in unused crawl space. (8) new skylights.Details
1st fl: add washer, add storage. 2nd fl: enlarge 2 bath, no structural bearing walls. 3rd fl: add closet, enlarge bath, no structural bearing walls. 4th fl: (2) new fireplace, create new closet, in unused crawl space. (8) new skylights. | $7,000 |