Casey Millard
- Listed as
- architect, engineer
- On San Francisco permits
- Feb 2022 to Nov 2025
6 permits since 2000 (engineer on 5 permits, architect on 1 permit): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2025 | In progress filed Nov 2025, not yet issued | 850 Stockton St | verizon remove 1 (e) antennas 1 (e) vent; install 6 (n) antennas within 6 (n) radomes; remove 1 (e) cabinet & install 2(n) cabinets; remove (e) 60a panel & install 100a panel; install (n) batteriesDetails
verizon remove 1 (e) antennas 1 (e) vent; install 6 (n) antennas within 6 (n) radomes; remove 1 (e) cabinet & install 2(n) cabinets; remove (e) 60a panel & install 100a panel; install (n) batteries | $125,000 | |
| Oct 16, 2025 | In progress filed Oct 2025, not yet issued | 3476 19th St | ref 201502259357- to modify verizon wireless telecom facility to include (n) antenna lease arear, raised roof curb, 2 frp radomes, 3 antennas, 3 radio units, 6 diplexers, and (n) subpanel 100amp. remove (e) cabinet and subpanel and concrete padDetails
ref 201502259357- to modify verizon wireless telecom facility to include (n) antenna lease arear, raised roof curb, 2 frp radomes, 3 antennas, 3 radio units, 6 diplexers, and (n) subpanel 100amp. remove (e) cabinet and subpanel and concrete pad | $195,000 | |
| Jan 31, 2025 | Completed final sign-off May 2026 | 15 Fell St | Metropolitan Electrical Construction | at&t install 12(n) antennas on roof within (n) screen walls; install equipment area in basement; install 16 (n) batteries; install (n) elec submeter & ppcDetails
at&t install 12(n) antennas on roof within (n) screen walls; install equipment area in basement; install 16 (n) batteries; install (n) elec submeter & ppc | $175,000 |
| Jan 15, 2025 | In progress issued Apr 2025 | 150 Hooper St | Stc Netcom Inc. | installation of an unmanned telecomm facility, consisting of a rooftop design with anennaes concealed by frp screening. related supporting equipment included.Details
installation of an unmanned telecomm facility, consisting of a rooftop design with anennaes concealed by frp screening. related supporting equipment included. | $195,000 |
| Jan 31, 2023 | Completed final sign-off Feb 2025 | 140 02nd St | Electric Tech Construction Inc | at&t mobility installation of new unmanned telecommunications facility on rooftop. sffd operational permit for batteries on a separate permit.Details
at&t mobility installation of new unmanned telecommunications facility on rooftop. sffd operational permit for batteries on a separate permit. | $195,000 |
| Feb 28, 2022 | Completed final sign-off Feb 2023 | 670 04th St | High Band Construction Inc | at&t modification of an unmanned telecom facility consisting of: remove + replace 6 panel antennas behind (e) frp / modification / extend, 6 rrus + relocate 3 rrus, 1 power trunk & 20 batteries within (e) dcpp + rack. install 4 rectifiers in (e) dcpp. 1 twin diplex each sector + 1 filter per sector.Details
at&t modification of an unmanned telecom facility consisting of: remove + replace 6 panel antennas behind (e) frp / modification / extend, 6 rrus + relocate 3 rrus, 1 power trunk & 20 batteries within (e) dcpp + rack. install 4 rectifiers in (e) dcpp. 1 twin diplex each sector + 1 filter per sector. | $45,000 |