Brittany D. Dhawan
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Studio 144
- Based in
- Oakland
- On San Francisco permits
- Jan 2019 to Jan 2026
13 permits since 2000 (architect on 10 permits, authorized agent-others on 2 permits, engineer on 1 permit): 9 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2026 | In progress filed Jan 2026, not yet issued | 204 Ortega St | legalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition of gypsum board layer, upgrade ceiling of the exit corridor & garage to 1 hr rating by the addition of a gypsum board layer. enlarge adu unit bedroom window to eero req's. replace 2 doors forDetails
legalize (e) space on ground floor as an adu state program. upgrade exit corridor to 1 hr rating by addition of gypsum board layer, upgrade ceiling of the exit corridor & garage to 1 hr rating by the addition of a gypsum board layer. enlarge adu unit bedroom window to eero req's. replace 2 doors for | $25,000 | |
| Jun 21, 2024 | Completed final sign-off Sep 2024 | 1156 Clement St | to permit the work under notice of violation #202420194. an (e) exterior stairs located at the rear of the 1156 clement property was enclosed 10 years ago. additional unpermitted work includes exterior wall and extention of the side walls and a roof.Details
to permit the work under notice of violation #202420194. an (e) exterior stairs located at the rear of the 1156 clement property was enclosed 10 years ago. additional unpermitted work includes exterior wall and extention of the side walls and a roof. | $50,000 | |
| Jun 5, 2023 | Completed final sign-off Jun 2024 | 2757 Vallejo St | Add A Garage Inc. | (n) retaining wall over 2 parcels to provide a replacement for the (e) unreinforced concrete retaining wall covering rear yard line of 2750 broadway. (e) retaining wall to be continuous as shown over part of rear yard of 2757 vallejo st. each of 3 addresses will have same permit application w/ plansDetails
(n) retaining wall over 2 parcels to provide a replacement for the (e) unreinforced concrete retaining wall covering rear yard line of 2750 broadway. (e) retaining wall to be continuous as shown over part of rear yard of 2757 vallejo st. each of 3 addresses will have same permit application w/ plans | $7,500 |
| Apr 25, 2023 | Completed final sign-off May 2023 | 1256 Folsom St | to comply with abe program ord 51-16 this is a technical infeasibility for an ave program permit is building is a 1911 category a historic building with a 57 1/2" level change from sidewalk level at folsom st and on existing non conforming staircase from street to entries. abe 201912059292Details
to comply with abe program ord 51-16 this is a technical infeasibility for an ave program permit is building is a 1911 category a historic building with a 57 1/2" level change from sidewalk level at folsom st and on existing non conforming staircase from street to entries. abe 201912059292 | ||
| Nov 29, 2022 | Completed final sign-off Jan 2023 | 2750 Broadway | California Mobility Inc | install home elevator between 1st & 2nd floors. stiltz duo model, cut and finish hole in floor for elevator. install 3 form screen at 1st floor.Details
install home elevator between 1st & 2nd floors. stiltz duo model, cut and finish hole in floor for elevator. install 3 form screen at 1st floor. | $45,000 |
| Nov 2, 2021 | Completed final sign-off May 2022 | 2651 20th Av | P C Building And Construction | rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower.Details
rev. to 2021-0211-4503: remove existing unpermitted skylights from lower rear roof & patch back. more over washer/dryer location within kitchen of adu because of (e)plumbing drainn line. remove(e)whirlpool tub in adu & replace with shower. | $10,000 |
| Jul 22, 2021 | Expired or cancelled withdrawn Jun 2022 | 2651 20th Av | P C Building And Construction | new duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard.Details
new duct chase at second flr in artrium for new mechanical ducts to exhaust at roof. emergency escape and rescue route, opening to 60' rear yard. | $30,000 |
| Dec 1, 2020 | Completed final sign-off Nov 2022 | 400 Precita Av | pour new concrete curb and new landing to provide for better accessibility to entry. add power door threshold for requirment of the accessible business entrance program.Details
pour new concrete curb and new landing to provide for better accessibility to entry. add power door threshold for requirment of the accessible business entrance program. | $2,500 | |
| Nov 19, 2020 | Never finaled issued Mar 2021, no final | 1943 Divisadero St | Curran & Associates General Contractors | 1943: for compliance with abe program certification - new power door operator, threshold work, new hardwareDetails
1943: for compliance with abe program certification - new power door operator, threshold work, new hardware | $3,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2021 | 490 Taraval St | Vision Builders | to comply with abe program per ordinance 51-16 - new power door operator to be installed. new entry door. replacement in kind to existing.Details
to comply with abe program per ordinance 51-16 - new power door operator to be installed. new entry door. replacement in kind to existing. | $1,200 |
| Oct 1, 2020 | Completed final sign-off Jan 2022 | 1947 Divisadero St | technical infeaibility request for upgrading the entrance to accessible for 1947 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.Details
technical infeaibility request for upgrading the entrance to accessible for 1947 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16. | $1,200 | |
| Oct 1, 2020 | Never finaled issued Feb 2021, no final | 1939 Divisadero St | Curran & Associates General Contractors | to comply with abe program -technical infeasibility request for upgrading the entrance to accessible for 1939 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16.Details
to comply with abe program -technical infeasibility request for upgrading the entrance to accessible for 1939 divisadero street. minor upgrades to hardware at (e) gate and entry door per ordinance 51-16. | $1,200 |
| Jan 9, 2019 | Completed final sign-off Apr 2019 | 865 Market St | Crane Construction Company Inc. | space 106: tenant improvement (e) 1st fl retail space in mall. new interior partitions, new storefront, new hvac sytem, modification of (e) to remain, elec system. maher n/a.Details
space 106: tenant improvement (e) 1st fl retail space in mall. new interior partitions, new storefront, new hvac sytem, modification of (e) to remain, elec system. maher n/a. | $150,000 |