Brian Scott
- Listed as
- architect, engineer
- Firm
- Bkf Engineers
- Based in
- Redwood City
- On San Francisco permits
- May 2012 to Aug 2025
96 permits since 2000 (engineer on 95 permits, architect on 1 permit): 65 completed, 1 in progress, 29 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 11 Frida Kahlo Wy | Nibbi Bros Assoc Inc. | temporary stockpile locations of 26t (18k cy) of recycle class ii aggreage base material in an area 40wx95lx10h from sfo to site.Details
temporary stockpile locations of 26t (18k cy) of recycle class ii aggreage base material in an area 40wx95lx10h from sfo to site. | $200,000 |
| Mar 10, 2023 | Completed final sign-off Jul 2023 | 60 Yerba Buena Rd | De Silva Gates Construction | sffd review only: rev to pa: 201711204456 - revise water line details & layout of waterline connection to (e) water system. added permanent meter & backflow preventor on 2in domestic water service. rev location of proposed fire hydrant.Details
sffd review only: rev to pa: 201711204456 - revise water line details & layout of waterline connection to (e) water system. added permanent meter & backflow preventor on 2in domestic water service. rev location of proposed fire hydrant. | |
| Nov 30, 2022 | Completed final sign-off May 2023 | 236 North Gate Rd | De Silva Gates Construction | north gate pump station - generator permit in support of puc infrastructure. plans previously reviewed and approved by dpw ahead on installation in filed. permit intended to facilitate fire dept inspection of as-built conditions.Details
north gate pump station - generator permit in support of puc infrastructure. plans previously reviewed and approved by dpw ahead on installation in filed. permit intended to facilitate fire dept inspection of as-built conditions. | |
| Apr 7, 2021 | Completed final sign-off Apr 2023 | 325 Yerba Buena Dr | De Silva Gates Construction | installation of an emergency generator associated with the pump/storage facilities on ybi/ti. ref bpa#2017-0630-0838. project #proj-17-0178Details
installation of an emergency generator associated with the pump/storage facilities on ybi/ti. ref bpa#2017-0630-0838. project #proj-17-0178 | $125,000 |
| Mar 6, 2020 | Never finaled issued Aug 2021, no final | 101 Forest Rd | Plant Construction Co, Lp | construction of utilities under forest road (a private st) including water, storm drainage & joint trench systems. (reference to grading permit #202003066381 for roadway construction.)Details
construction of utilities under forest road (a private st) including water, storm drainage & joint trench systems. (reference to grading permit #202003066381 for roadway construction.) | $220,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | De Silva Gates Construction | bldg 261. demolish 1 story shed at 1 ave of palms, treasure islandDetails
bldg 261. demolish 1 story shed at 1 ave of palms, treasure island | $10,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | De Silva Gates Construction | bldg 242t. demolish water tank at 1 ave of palms, treasure islandDetails
bldg 242t. demolish water tank at 1 ave of palms, treasure island | $100,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | De Silva Gates Construction | bldg 243. demolish 1 story shed at 1 ave of palms, treasure islandDetails
bldg 243. demolish 1 story shed at 1 ave of palms, treasure island | $10,000 |
| Nov 20, 2017 | Completed final sign-off Sep 2023 | 60 Yerba Buena Rd | sffd fire only permit. temporary hydrate relocation. maher naDetails
sffd fire only permit. temporary hydrate relocation. maher na | $150,000 | |
| Apr 5, 2017 | Never finaled filed Apr 2017, never issued | 300 Arballo Dr | excavateDetails
excavate | $75,000 | |
| May 25, 2016 | In progress issued Sep 2024 | 350 Arballo Dr | exterior landscape & infrastructure improvements incl. new vehicular paving & parking, utilities, site grading stairs, planting soil, under story planting,tree planting, irrigation a play area & community garden. fire department access updates.Details
exterior landscape & infrastructure improvements incl. new vehicular paving & parking, utilities, site grading stairs, planting soil, under story planting,tree planting, irrigation a play area & community garden. fire department access updates. | $3,845,473 | |
| May 4, 2016 | Completed final sign-off Jul 2017 | 15 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, 1 basement, type 5-b, single family dwelling building.Details
erect 4-story, 1 basement, type 5-b, single family dwelling building. | $439,000 |
| May 4, 2016 | Completed final sign-off Jun 2017 | 20 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 317 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, two family dwelling building.Details
erect 3-story, 1 basement, type 5-b, two family dwelling building. | $794,220 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 2 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, no basement, type 5-b, two family dwellings building.Details
erect 3-story, no basement, type 5-b, two family dwellings building. | $864,280 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 311 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2-story, 1 basement, type 5-b, single family dwelling building.Details
erect 2-story, 1 basement, type 5-b, single family dwelling building. | $380,800 |
| May 4, 2016 | Completed final sign-off Jun 2017 | 18 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, 1 single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, 1 single family dwelling building. | $437,900 |
| May 4, 2016 | Never finaled issued Jul 2016, no final | 16 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, 1 single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, 1 single family dwelling building. | $437,900 |
| May 4, 2016 | Never finaled issued Jul 2016, no final | 12 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Aug 2017 | 313 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2-story, 1 basement, type 5-b, single family dwelling building.Details
erect 2-story, 1 basement, type 5-b, single family dwelling building. | $380,800 |
| May 4, 2016 | Completed final sign-off Jul 2017 | 10 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| May 4, 2016 | Completed final sign-off Jul 2017 | 8 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, 1 basement, type 5-b, single family dwelling building.Details
erect 3-story, 1 basement, type 5-b, single family dwelling building. | $437,900 |
| Nov 16, 2015 | Never finaled issued Dec 2015, no final | 100 South Park | Bauman Landscape & Construction Inc. | playground renovation: including demolition of (e) and construction of new children's play area with perimeter seatwalls, synthetic turf safety-surface, pre-fabricated play structure, lighting & accessible path.; maher (?)Details
playground renovation: including demolition of (e) and construction of new children's play area with perimeter seatwalls, synthetic turf safety-surface, pre-fabricated play structure, lighting & accessible path.; maher (?) | $450,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 60 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 66 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 70 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off Apr 2017 | 76 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Nov 3, 2015 | Completed final sign-off May 2017 | 23 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4-story, type 5-b, single family dwelling building.Details
erect 4-story, type 5-b, single family dwelling building. | $397,100 |
| Nov 3, 2015 | Completed final sign-off Mar 2017 | 80 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, type 5-b, 1 basement, 2 units residential building.Details
erect 3-story, type 5-b, 1 basement, 2 units residential building. | $702,500 |
| Jun 29, 2015 | Completed final sign-off Jan 2017 | 259 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, no basement. single family dwelling.Details
to erect 3 stories, no basement. single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 268 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 272 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 269 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family dwelling.Details
to erect 2 stories, 1 basement, single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 266 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a 2-story, 1 basement, single family dwelling.Details
erect a 2-story, 1 basement, single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 270 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 265 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect a two story single family dwelling.Details
erect a two story single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 271 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family dwelling.Details
to erect 2 stories, 1 basement, single family dwelling. | $380,800 |
| Jun 29, 2015 | Completed final sign-off Dec 2016 | 267 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family dwelling.Details
to erect 2 stories, 1 basement, single family dwelling. | $380,800 |
| Mar 25, 2015 | Never finaled issued May 2015, no final | 200 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | construction of garage retaining wall behind lots 42-61 +120. retaining wall is behind garage & not seen from public righ of way.Details
construction of garage retaining wall behind lots 42-61 +120. retaining wall is behind garage & not seen from public righ of way. | $717,000 |
| Nov 14, 2014 | Never finaled issued Nov 2014, no final | 90 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #201312315317 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type a are in pa #201209119408 & amended by pa #201401317498 & #201407100857. rev. alters alignment fo front stoops & rear yard landscaping details.Details
revision to pa #201312315317 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type a are in pa #201209119408 & amended by pa #201401317498 & #201407100857. rev. alters alignment fo front stoops & rear yard landscaping details. | |
| Nov 14, 2014 | Completed final sign-off Mar 2015 | 79 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #201312315321 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type c are in pa #201209119425 & amended by pa #201401317504. rev. alters alignment fo front stoops & rear yard landscaping details.Details
revision to pa #201312315321 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type c are in pa #201209119425 & amended by pa #201401317504. rev. alters alignment fo front stoops & rear yard landscaping details. | |
| Nov 14, 2014 | Never finaled issued Nov 2014, no final | 309 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #201312315319 for construction of 1 unit residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type b is in pa #201209119424 & amended by pa #201401317503 & #201407100858. rev. alters alignment fo front stoops & rear yard landscaping details.Details
revision to pa #201312315319 for construction of 1 unit residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type b is in pa #201209119424 & amended by pa #201401317503 & #201407100858. rev. alters alignment fo front stoops & rear yard landscaping details. | |
| Nov 14, 2014 | Never finaled issued Nov 2014, no final | 75 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #201312315320 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type c are in pa #201209119425 & amended by pa 201401317504. rev. alters alignment fo front stoops & rear yard landscaping details.Details
revision to pa #201312315320 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type c are in pa #201209119425 & amended by pa 201401317504. rev. alters alignment fo front stoops & rear yard landscaping details. | |
| Nov 14, 2014 | Never finaled issued Nov 2014, no final | 86 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #201312315312 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type a are in pa #201209119408 & amended by pa #201401317498 & #201407100857. rev. alters alignment fo front stoops & rear yard landscaping details.Details
revision to pa #201312315312 for construction of 2 units residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type a are in pa #201209119408 & amended by pa #201401317498 & #201407100857. rev. alters alignment fo front stoops & rear yard landscaping details. | |
| Nov 14, 2014 | Completed final sign-off Dec 2014 | 307 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #201312315318 for construction of 1 unit residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type b is in pa #201209119424 & amended by pa #201401317503 & #201407100858. rev. alters alignment oo front stoops & rear yard landscaping details.Details
revision to pa #201312315318 for construction of 1 unit residence on a lot w/in development known as 700 brotherhood way. master set document for bldg type b is in pa #201209119424 & amended by pa #201401317503 & #201407100858. rev. alters alignment oo front stoops & rear yard landscaping details. | |
| Jul 25, 2014 | Never finaled issued Jul 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | work consists of construciton of rear yard fence @ interior lot of 700 brotherhood way. ref.appl. #201208278254 & 201307010864.Details
work consists of construciton of rear yard fence @ interior lot of 700 brotherhood way. ref.appl. #201208278254 & 201307010864. | $20,000 |
| Jun 4, 2014 | Never finaled issued Jul 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | construction of garage retaining wall behind lots 27-41.Details
construction of garage retaining wall behind lots 27-41. | $430,200 |
| May 15, 2014 | Completed final sign-off Nov 2015 | 115 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 4 stories, 1 basement, type 5, 2 dwelling units building. | $800,320 |
| May 15, 2014 | Completed final sign-off Sep 2015 | 293 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2 stories, 1 basement, type 5, 1 dwelling unit building.Details
erect 2 stories, 1 basement, type 5, 1 dwelling unit building. | $380,800 |
| May 15, 2014 | Completed final sign-off Aug 2015 | 99 Summit Wy | R & B Equipment Rentals, Comstock Crosser & Assoc Develp Co Inc. | bldg c -erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. ***Details
bldg c -erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. *** | $800,320 |
| May 15, 2014 | Never finaled issued Jan 2015, no final | 107 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 4 stories, 1 basement, type 5, 2 dwelling units building. | $800,320 |
| May 15, 2014 | Completed final sign-off Sep 2015 | 291 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2 stories, 1 basement, type 5, 1 dwelling unit building.Details
erect 2 stories, 1 basement, type 5, 1 dwelling unit building. | $380,800 |
| May 15, 2014 | Never finaled issued Dec 2014, no final | 301 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | bldg b -erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 **Details
bldg b -erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 ** | $380,800 |
| May 15, 2014 | Completed final sign-off Sep 2015 | 110 Summit Wy | R & B Equipment Rentals, Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 ***Details
to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 *** | $702,500 |
| May 15, 2014 | Completed final sign-off Oct 2015 | 126 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 3 stories, 1 basement, type 5, 2 dwelling units building. | $702,500 |
| May 15, 2014 | Completed final sign-off Nov 2015 | 111 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 4 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 4 stories, 1 basement, type 5, 2 dwelling units building. | $800,320 |
| May 15, 2014 | Completed final sign-off Jul 2015 | 299 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 **Details
to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 ** | $380,800 |
| May 15, 2014 | Completed final sign-off May 2015 | 303 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 **Details
to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 ** | $380,800 |
| May 15, 2014 | Completed final sign-off May 2015 | 87 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. ***Details
to erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. *** | $800,320 |
| May 15, 2014 | Completed final sign-off Jun 2015 | 100 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 ***Details
to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 *** | $702,500 |
| May 15, 2014 | Completed final sign-off Jul 2015 | 297 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 **Details
to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 ** | $380,800 |
| May 15, 2014 | Completed final sign-off Jun 2015 | 106 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 ***Details
to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 *** | $702,500 |
| May 15, 2014 | Completed final sign-off Sep 2015 | 295 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 2 stories, 1 basement, type 5, 1 dwelling unit building.Details
erect 2 stories, 1 basement, type 5, 1 dwelling unit building. | $380,800 |
| May 15, 2014 | Completed final sign-off May 2015 | 305 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 **Details
to erect 2 stories, 1 basement, single family residential building. ** this is a identical plan of pa# 2012/09/11/9424 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9424 & pa# 2013/11/19/2305 ** | $380,800 |
| May 15, 2014 | Completed final sign-off Oct 2015 | 136 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 3 stories, 1 basement, type 5, 2 dwelling units building. | $702,500 |
| May 15, 2014 | Completed final sign-off Sep 2015 | 116 Summit Wy | R & B Equipment Rentals, Comstock Crosser & Assoc Develp Co Inc. | bldg a -erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 ***Details
bldg a -erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 *** | $702,500 |
| May 15, 2014 | Completed final sign-off Apr 2015 | 83 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. ***Details
to erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. *** | $800,320 |
| May 15, 2014 | Completed final sign-off Oct 2015 | 130 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 3 stories, 1 basement, type 5, 2 dwelling units building. | $702,500 |
| May 15, 2014 | Completed final sign-off May 2015 | 96 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 ***Details
to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 *** | $702,500 |
| May 15, 2014 | Completed final sign-off Oct 2015 | 150 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3 stories, 1 basement, type 5, 2 dwelling units building.Details
erect 3 stories, 1 basement, type 5, 2 dwelling units building. | $702,500 |
| May 15, 2014 | Completed final sign-off Sep 2015 | 120 Summit Wy | R & B Equipment Rentals, Comstock Crosser & Assoc Develp Co Inc. | to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 ***Details
to erect 3 stories, 1 basement, 2 units residential building. *** this application is a identical plan of pa# 2012/09/11/9408 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1 *** | $702,500 |
| May 15, 2014 | Completed final sign-off Aug 2015 | 103 Summit Wy | R & B Equipment Rentals, Comstock Crosser & Assoc Develp Co Inc. | to erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. ***Details
to erect 4 stories, 1 basement, 2 units residential building. *** this is a identical plan of pa# 2012/09/11/9425 issued on 10/07/2013. per tom le of sfdbi, this application is qualified for reduced plan review fee per sfbc 107a.3.1. ref pa# 2012/09/11/9425. *** | $800,320 |
| Jan 31, 2014 | Never finaled issued Jun 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | this is a revision to a previously issued permit (pa#2012-09-11-9425). the scope of work contains various revision to building floor plans, and exterior elevations. all changes are clouded. also add landscape structures in front court yard at entrance.Details
this is a revision to a previously issued permit (pa#2012-09-11-9425). the scope of work contains various revision to building floor plans, and exterior elevations. all changes are clouded. also add landscape structures in front court yard at entrance. | |
| Jan 31, 2014 | Never finaled issued Jun 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | this is a revision to a previously issued permit (pa#2012-09-11-9408). the scope of work contains various revision to building floor plans, and exterior elevations. all changes are clouded.Details
this is a revision to a previously issued permit (pa#2012-09-11-9408). the scope of work contains various revision to building floor plans, and exterior elevations. all changes are clouded. | |
| Jan 31, 2014 | Never finaled issued Jun 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | this is a revision to a previously issued permit (pa#2012-09-11-9424). the scope of work contains various revision to building floor plans, and exterior elevations. all changes are clouded.Details
this is a revision to a previously issued permit (pa#2012-09-11-9424). the scope of work contains various revision to building floor plans, and exterior elevations. all changes are clouded. | |
| Jan 13, 2014 | Never finaled issued Feb 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | scope of work is the temporary grading necessary for fire dept access during the course of construction of the 2nd phase of model home construction at the 700 brotherhood way development.Details
scope of work is the temporary grading necessary for fire dept access during the course of construction of the 2nd phase of model home construction at the 700 brotherhood way development. | $5,000 |
| Dec 31, 2013 | Completed final sign-off Mar 2015 | 79 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect four stories, 1 basement, 2 units family dwelling. ref pa #201312315312.Details
erect four stories, 1 basement, 2 units family dwelling. ref pa #201312315312. | $932,000 |
| Dec 31, 2013 | Completed final sign-off Jan 2015 | 86 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect three story two unit family dwelling. ref. pa #201312315312.Details
erect three story two unit family dwelling. ref. pa #201312315312. | $721,000 |
| Dec 31, 2013 | Completed final sign-off Feb 2015 | 75 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect four story two unit family dwelling. reference pa #201312315312.Details
erect four story two unit family dwelling. reference pa #201312315312. | $932,000 |
| Dec 31, 2013 | Completed final sign-off Feb 2015 | 309 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect two story single family dwelling. reference #201312315312.Details
erect two story single family dwelling. reference #201312315312. | $379,669 |
| Dec 31, 2013 | Completed final sign-off Jan 2015 | 90 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect 3-story, two family dwelling units. ref. pa#201312315312.Details
erect 3-story, two family dwelling units. ref. pa#201312315312. | $721,000 |
| Dec 31, 2013 | Completed final sign-off Dec 2014 | 307 Summit Wy | Comstock Crosser & Assoc Develp Co Inc. | erect two story single family dwelling. reference pa #201312315312.Details
erect two story single family dwelling. reference pa #201312315312. | $379,669 |
| Nov 26, 2013 | Never finaled issued Jan 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | temporary grading permitDetails
temporary grading permit | $7,000 |
| Nov 26, 2013 | Completed final sign-off Jun 2015 | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | temporary grading permitDetails
temporary grading permit | $30,000 |
| Aug 27, 2013 | Completed final sign-off Mar 2014 | 901 Rankin St | Hathaway Dinwiddie Co. | demolish 1 story, type 2, warehouse building.Details
demolish 1 story, type 2, warehouse building. | $220,000 |
| Jul 1, 2013 | Never finaled issued Feb 2014, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #2012-08-27-8254 at 700 brotherhood wy and covers general rough grading, providing general infrastructure and the construction of retaining walls to allow for grading of individual lots.Details
revision to pa #2012-08-27-8254 at 700 brotherhood wy and covers general rough grading, providing general infrastructure and the construction of retaining walls to allow for grading of individual lots. | |
| Jul 1, 2013 | Never finaled issued Jul 2015, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | construction of stairs and landscaping @ common area lots as part of the development @ 700 brotherhood way.Details
construction of stairs and landscaping @ common area lots as part of the development @ 700 brotherhood way. | $750,000 |
| Jul 1, 2013 | Never finaled issued Feb 2014, no final | 101 Font Bl | Comstock Crosser & Assoc Develp Co Inc. | revision to pa #2013-03-22-2808 and covers the construction of a drainage ditch behind a retaining wall. construction of wall under seperate permit(2012-05-22-0927)Details
revision to pa #2013-03-22-2808 and covers the construction of a drainage ditch behind a retaining wall. construction of wall under seperate permit(2012-05-22-0927) | |
| Jul 1, 2013 | Never finaled issued Feb 2014, no final | 3 Garces Dr | Comstock Crosser & Assoc Develp Co Inc. | revision to grading permit pa #2013-03-22-2817 and covers the construction of a drainage ditch behind a retaining wall. construction of wall under seperate permit(2012-05-22-0927).Details
revision to grading permit pa #2013-03-22-2817 and covers the construction of a drainage ditch behind a retaining wall. construction of wall under seperate permit(2012-05-22-0927). | |
| Jul 1, 2013 | Never finaled issued Oct 2013, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | construction of garage retaining wall behind lots 1-26.Details
construction of garage retaining wall behind lots 1-26. | $717,000 |
| Apr 17, 2013 | Never finaled issued Jun 2013, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | this application is a revision to grading permit 201205220927 @ 700 brotherhood way, and cover general grading and shoring necessary to construct a perimeter wall around the project site.Details
this application is a revision to grading permit 201205220927 @ 700 brotherhood way, and cover general grading and shoring necessary to construct a perimeter wall around the project site. | |
| Mar 22, 2013 | Never finaled issued May 2013, no final | 3 Garces Dr | Comstock Crosser & Assoc Develp Co Inc. | (garces drive/rivas avenue proj) construction of drainage ditch behind retaining wall. construction of wall under separate permit (appl 2012-05-22-0927).Details
(garces drive/rivas avenue proj) construction of drainage ditch behind retaining wall. construction of wall under separate permit (appl 2012-05-22-0927). | $24,760 |
| Mar 22, 2013 | Never finaled issued May 2013, no final | 101 Font Bl | Comstock Crosser & Assoc Develp Co Inc. | (font blvd/chumasero drive proj) construction of drainage ditch behind retaining wall. construction of wall under separate permit (appl 2012-05-22-0927).Details
(font blvd/chumasero drive proj) construction of drainage ditch behind retaining wall. construction of wall under separate permit (appl 2012-05-22-0927). | $37,135 |
| Mar 20, 2013 | Expired or cancelled cancelled Jan 2020 | 700 Brotherhood Wy | grading. general rough grading activities, soil improvement & the construction of a perimeter retaining wall.Details
grading. general rough grading activities, soil improvement & the construction of a perimeter retaining wall. | $20,000 | |
| Aug 27, 2012 | Never finaled issued Jul 2013, no final | 700 Brotherhood Wy | the scope of work contained in this application includes general rough grading, providing general infrastructure, including private storm drain systen, sanitary sewer system, water system, joint trenching and the construction of retaining walls to allow for grading of individual lots.Details
the scope of work contained in this application includes general rough grading, providing general infrastructure, including private storm drain systen, sanitary sewer system, water system, joint trenching and the construction of retaining walls to allow for grading of individual lots. | $10,305,256 | |
| May 22, 2012 | Never finaled issued Mar 2013, no final | 700 Brotherhood Wy | Comstock Crosser & Assoc Develp Co Inc. | scope of work includes: general rough grading activities, soil improvement & construction of a perimeter retaining wall. scope of work is the first of multiple grading permits & building permits necessary for the construction of the complete development (182 housing units)Details
scope of work includes: general rough grading activities, soil improvement & construction of a perimeter retaining wall. scope of work is the first of multiple grading permits & building permits necessary for the construction of the complete development (182 housing units) | $4,349,090 |