Brendan Taylor
- Listed as
- engineer
- On San Francisco permits
- Apr 2024 to Apr 2024
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 11, 2024 | In progress issued Apr 2024 | 3450 Washington St | Clayton Timbrell & Co | new air conditioning. remove 3 e) 1:1 split heat pump systems at roof & replace w/ a full variable refrigerant flow system w/ heat recovery. exhuast & ventilation system are e) to remain, unless otherwise noted. hydronic radiant system is e) remainDetails
new air conditioning. remove 3 e) 1:1 split heat pump systems at roof & replace w/ a full variable refrigerant flow system w/ heat recovery. exhuast & ventilation system are e) to remain, unless otherwise noted. hydronic radiant system is e) remain | $125,000 |